24/033 - South West Scotland Onshore System (SWSOS) Electrification Program
Construction works for plants
mining and manufacturing and for buildings relating to the oil and gas industry
Electrical installation work
+3 more
Published value
Not published
Submission deadline 28 Oct 2024, 12:00 GMT
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: GasNetworks Ireland: "24/033 - South West Scotland Onshore System (SWSOS) Electrification Program". Published status: planned. Published value: Value not published. 1 published lot. Recorded submission deadline: 28 Oct 2024, 12:00 GMT. See the official notice for participation instructions.
| Contracting Authority | GasNetworks Ireland | Scope & Categories | Not published | Submission Window | Closed 28 Oct 2024, 12:00 GMT |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: GasNetworks Ireland
Market Analytics
Derived from OCDS awards & bid statistics
Published history for GasNetworks Ireland. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 0 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityGasNetworks Ireland | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published30 Sept 2024, 16:10 BST | Last source update30 Sept 2024, 16:10 BST | Recurring procurementNot published |
ClassificationConstruction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry, Electrical installation work, Mechanical engineering installation works, Primary works for services, Works for complete or part construction and civil engineering work | ||
Delivery area | ||
OCIDocds-h6vhtk-04a441 | ||
What is being bought
Gas Networks Ireland (GNI) operates two compressor stations Brighouse Bay and Beattock, both in located in South Scotland, to transport natural gas from the UK through a pipeline system to Ireland. The natural gas compressors on these compressor station are driven by gas turbines between 6MW and 12MW of rated power.
The primary objective of the Electrification Programme is to reduce the use of fuel gas in the
operation of the Brighouse Bay and Beattock compressors stations and associated fugitive
emissions thereby aiding the reduction of greenhouse gas emission intensity by 50% (from
2010 level) by 2030 as outlined in Gas Networks Ireland's Low Carbon Pledge.
The Electrification Programme at both Brighouse Bay and Beattock compressor stations comprises three major components at both stations:
1. construction of a new compressor hall with an EMD and ancillary equipment;
2. construction of a new electrical connection to upgrade the supply capacity to power the
new EMD; and
3. the installation of a vent recovery system to capture normally vented gas and return it
to the gas network.
What changed
From the official release history
- Status changed to planned
30 Sept 2024, 16:10 BST - Official notice release published
30 Sept 2024, 16:10 BST - Submission deadline changed to 28 Oct 2024, 12:00 GMT
30 Sept 2024, 16:10 BST - Buyer information updated
30 Sept 2024, 16:10 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedplannedPublished valueNot publishedGas Networks Ireland (GNI) operates two compressor stations Brighouse Bay and Beattock, both in located in South Scotland, to transport natural gas from the UK through a pipeline system to Ireland. The natural gas compressors on these compressor station are driven by gas turbines between 6MW and 12MW of rated power. The primary objective of the Electrification Programme is to reduce the use of fuel gas in the operation of the Brighouse Bay and Beattock compressors stations and associated fugitive emissions thereby aiding the reduction of greenhouse gas emission intensity by 50% (from 2010 level) by 2030 as outlined in Gas Networks Ireland's Low Carbon Pledge. The Electrification Programme at both Brighouse Bay and Beattock compressor stations comprises three major components at both stations: 1. construction of a new compressor hall with an EMD and ancillary equipment; 2. construction of a new electrical connection to upgrade the supply capacity to power the new EMD; and 3. the installation of a vent recovery system to capture normally vented gas and return it to the gas network.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
30 Sept 2024, 16:10 BST - Submission deadline
28 Oct 2024, 12:00 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
GasNetworks Ireland
Contracting authority GB-FTS-124998Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published