Find a TenderOpen for tender Tender notice
Published 30 Sept 2026, 15:04 BST

Official UK procurement notice

2027 ECITB Scholarships Programme: ENGLAND London & South West Design & Draughting

Authority: ENGINEERING CONSTRUCTION INDUSTRY TRAINING BOARD (Charity / VCSE)

ServicesBelow threshold - open competitionBelow thresholdLight touch regime
Sectors: Education & Training (80) Delivery: UK
Published estimate£62,000≈ £24k / year · £62,000 inc. VAT
Submission deadline 26 Oct 202623:59 GMT · 26d 8h left
Clarification cut-off 21 Oct 202623:59 BST · questions to the authority
Contract term 2 yrs 7 mostarts 1 Jan 2027
Bids per lot · this authority 2.5all categories · n=4 · competition analysis ↓

What is being bought

Published requirement description

The Engineering Construction Industry Training Board (ECITB) is pleased to invite tender offers for our England London & Southwest Design and Draughting Scholarship Programme 2027.

Full details can be found within the procurement pack, which is downloadable within this Notice.

The ECITB is tendering for a contract for the delivery of the skills and knowledge required within the 2027 ECITB Scholarship Programme (England: London & South West D&D) with delivery from September 2027.

Pathway requirements (2 Years) can be found within the procurement pack, specifically detailed within the Cohort Requirements by Discipline and the Specification document.

England: London & South West Level 3 Design & Draughting (2 years)

**Please register your interest in this ITT to ensure you are included within the clarification (bidder question and answer) process by emailing: [email protected] ***

Thank you for your interest in the ECITB.

CPV: Education and training services

The lotProcurement structure

single lot · value published
Lot #1Lot 1 2 yrs 7 moPublished value£62,000
Contract period: 1 Jan 2027 — 31 Jul 2029 (2 yrs 7 mo)Delivery: UKTurnover guideline: ~£47,998/yr≈ 2× annual value
Value
£62,000 exc. VAT · £62,000 inc. VAT
80000000 Education and training services

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published — the tender pack may add more
How bids are scored

Mandatory and discretionary pass/fail criteria Technical Criteria 80% weighting Price Criteria 20% weighting

No conditions of participation were published on the notice; check the tender documents.

Competition analysis · published record, not a forecast of who will bid

How ENGINEERING CONSTRUCTION INDUSTRY TRAINING BOARD buys Education and training services (CPV 80) — and who usually turns up

ENGINEERING CONSTRUCTION INDUSTRY TRAINING BOARD’s own published record, next to the East of England market for the same work. Frameworks and DPS are kept out: they attract a different number of bids. Whole-market view: Education and training services (CPV 80) →

1

How the contest usually goes

Left: this authority. Right: the market where the work is delivered. Bids and award-vs-estimate pairs are per lot, from contested contracts only — direct awards (including PA 2023 transparency notices) report one bid by definition and are left out. On Procurement Act 2023 notices the count is the tenders assessed at the final stage, not every submission received; pairs compare like with like (VAT-exclusive, or VAT-inclusive on both sides). Empty means nothing was published, not filled in from elsewhere.

This authority

ENGINEERING CONSTRUCTION INDUSTRY TRAINING BOARD

contract notices in 36 months: 16 in division 80 · 20 in all categories

Bids per lot
i

How many companies usually bid for work like this.

Middle value of published bid counts, one per lot, for this buyer or this region in the same sector.

Based on this buyer’s tenders in all categories, last 36 months: 4 lots. All 4 lots are from Procurement Act 2023 notices, which count bids assessed.

Nothing is filled in from UK-wide numbers. An empty tile means nothing usable was published.

2.5all categories · 36m · n=4 lots
Single-bid lots
i

How often only one company bid.

Share of lots that received exactly one bid, on the same competitions as the bids figure.

Based on this buyer’s tenders in all categories, last 36 months: 4 lots.

High means a thin market or an incumbent that is hard to beat.

0%all categories · 36m · n=4 lots
Award vs estimate
i

Do awards for work like this land above or below the estimate.

Estimate against award per lot, for this buyer or this region in the same sector.

Based on this buyer’s tenders in this industry (CPV 80), last 36 months: 15 pairs.

A past pattern, not a price to bid.

at estimatedivision 80 · 36m · n=15 pairs
Deadline → award date
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Based on this buyer’s tenders in all categories, last 36 months: 4 notices.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

37dall categories · 36m · n=4 notices
Notice updates
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on this buyer’s tenders in all categories, last 24 months: 20 notices.

Last 24 months.

3all categories · 24m · n=20 notices
Awarded without competition
i

How often this buyer awards without a competition.

Direct or limited awards as a share of its notices that say which procedure was used. These routes are legal in defined cases. This is just the record.

Based on this buyer’s tenders in this industry (CPV 80), last 36 months: 16 notices.

Last 36 months.

0%division 80 · 36m · n=16 notices
Bids per lot moderate · n=4
i

How the number of bidders is spread across lots.

Each lot with a published bid count is put in a band: one bid, two to three, four to six, seven or more. Real competitions only.

Based on 4 lots on 4 contested notices · all categories, last 36 months.

  • 1 bid 0%
  • 2–3 75%
  • 4–6 25%
  • 7+ 0%

Middle value 2.5 · 4 lots on 4 contested notices · all categories.

Winning award vs estimate robust · n=15
i

How often winners come in below, near or above the estimate.

Each lot with both an estimate and an award is placed by how far the award sat from the estimate.

Based on 15 lot pairs · division 80, last 36 months.

A past pattern, not a price to bid.

  • Below estimate 20%
  • Within ±2% 47%
  • Above estimate 33%

15 lot pairs · division 80.

The market · authority’s region

East of England · Education and training services (CPV 80)

contract notices delivered in East of England in 36 months: 284 in division 80 (198 competed, 48 route not published) · the notice publishes no delivery location, so the authority’s registered region is used

Bids per lot
i

How many companies usually bid for work like this.

Middle value of published bid counts, one per lot, for this buyer or this region in the same sector.

Based on this region’s tenders in this industry (CPV 80), last 36 months: 116 lots. 81 lots are from Procurement Act 2023 notices (bids assessed, middle 4) and 35 from older notices (bids received, middle 5).

Nothing is filled in from UK-wide numbers. An empty tile means nothing usable was published.

4.5division 80 · 36m · n=116 lots
Single-bid lots
i

How often only one company bid.

Share of lots that received exactly one bid, on the same competitions as the bids figure.

Based on this region’s tenders in this industry (CPV 80), last 36 months: 116 lots.

High means a thin market or an incumbent that is hard to beat.

13%division 80 · 36m · n=116 lots
Award vs estimate
i

Do awards for work like this land above or below the estimate.

Estimate against award per lot, for this buyer or this region in the same sector.

Based on this region’s tenders in this industry (CPV 80), last 36 months: 74 pairs.

A past pattern, not a price to bid.

at estimatedivision 80 · 36m · n=74 pairs
Deadline → award date
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Based on this region’s tenders in this industry (CPV 80), last 36 months: 72 notices.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

53ddivision 80 · 36m · n=72 notices
SME bidders
i

How much of this market goes to small and medium firms.

SME bidders where buyers published the split, otherwise SME winners.

Based on this region’s tenders in this industry (CPV 80), last 36 months: 104 lots.

Last 36 months.

71%division 80 · 36m · n=104 lots
Winners based in the region
i

How much work like this goes to companies based in the delivery region.

Awards in this category delivered here where the winner’s registered address is in the region.

Based on this region’s tenders in this industry (CPV 80), last 36 months: 283 awards.

Registered address, so a national firm with a local branch counts as outside.

Last 36 months.

63%division 80 · 36m · n=283 awards
Bids per lot robust · n=116
i

How the number of bidders is spread across lots.

Each lot with a published bid count is put in a band: one bid, two to three, four to six, seven or more. Real competitions only.

Based on 116 lots on 97 contested notices · division 80, last 36 months.

  • 1 bid 13%
  • 2–3 23%
  • 4–6 30%
  • 7+ 34%

Middle value 4.5 · 116 lots on 97 contested notices · division 80.

Winning award vs estimate robust · n=74
i

How often winners come in below, near or above the estimate.

Each lot with both an estimate and an award is placed by how far the award sat from the estimate.

Based on 74 lot pairs · division 80, last 36 months.

A past pattern, not a price to bid.

  • Below estimate 32%
  • Within ±2% 49%
  • Above estimate 19%

74 lot pairs · division 80.

robust · n=15
i

Where this tender’s estimate would land if the usual pattern repeats.

We apply the buyer’s usual movement between estimate and award (or the region’s) to the estimate on this notice.

Based on this buyer’s own usual movement over 15 lots (division 80), applied to the £62,000 estimate on this notice.

A benchmark, not a price to bid.

The middle award in ENGINEERING CONSTRUCTION INDUSTRY TRAINING BOARD (division 80, n=15 pairs) lands at estimate: on this notice’s £62,000 that is about £61,814. Context for a bid, not a recommended price.
Coverage and what to read with care
  • Each tile explains itself. The on a figure says what it is, how it is counted and which scope this notice’s own record came from (class, division, all categories, or the authority’s 24-month row). The two columns are never blended and nothing is filled from a UK-wide figure; an empty tile means the source published nothing usable. Long form: Methodology.
  • Coverage. Roughly 40 % of notices publish a bid count; about half publish an ITL1 delivery location, so the market column reads the authority’s registered region when the notice has none (labelled). About 30 % of award-vs-estimate pairs are exact matches — the buyer published the award at the estimate. n is on every figure; a thin sample is muted, never hidden.
  • “Match” and “relevance” are model scores from the nightly matcher, not published facts. Find a Tender does not publish who is bidding. Never shown: contact details, payment behaviour, or a recommended price.

Procedure terms & legal framework

From the official record
Procedure method
Below threshold - open competition
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Open for tender
Procurement threshold
Below threshold
Regulatory regime
Light touch regime
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
30 Sept 2026, 15:04 BST
Last source update
30 Sept 2026, 15:04 BST
Authority reference
P2609-2
Latest notice
Tender notice (UK4)
Classification (CPV)
Education and training services
Delivery area
UK
Official registry OCID
ocds-h6vhtk-077dc5 Find a Tender

How to participate & submission route

Official notice
Expression of interest (EOI)
—
Tender submission deadline
26 Oct 2026, 23:59 GMT
Clarification deadline
21 Oct 2026, 23:59 BST
Electronic submission
Allowed
Detailed submission instructions & authority contactsFrom official release
www.ecitb.org.uk ↗ Please note, the ECITB does not have an e-procurement portal, therefore all tenders must be submitted via email only to: [email protected]
Published estimate £62,000 excludes VAT (£62,000 including VAT).

Timeline

4 published dates · Europe/London
  1. Tender notice publishedearlier today
    30 Sept 2026, 14:58 BST
  2. Clarification questions byin 21 days
    21 Oct 2026, 23:59 BST
  3. Submission deadlinein 26 days
    26 Oct 2026, 23:59 GMT
  4. Contract startsin 92 days
    1 Jan 2027, 00:00 GMT

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Notice history

3 events · 2 releases on Find a Tender · since 30 Sept 2026
  1. Tender notice published
    30 Sept 2026, 15:04 BSTUK4
  2. Deadline moved to 26 Oct 2026, 23:59 GMT
    30 Sept 2026, 15:04 BST+0 days · was 26 Oct 2026, 23:59 GMT
  3. Tender notice published
    30 Sept 2026, 14:58 BSTUK4
Published amendments (1)

Spelling corrections in title

Contracting authority & participating public bodies

ENGINEERING CONSTRUCTION INDUSTRY TRAINING BOARD

Contracting authorityPublic authority - sub-central government GB-CHC: 264506 · GB-PPON: PPPJ-1399-NBBQ Kings House Business Center, Home Park Business Estate, Station Road, Kings Langley, East of England, WD4 8LZ [email protected]

Official documents & specifications (8)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender