1992 Tube Stock Grab Pole Refurbishment
Metal
Repair and maintenance services
Repair
+1 more
Published value
Not published
Submission deadline 10 Mar 2021, 13:00 GMT
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Transport for London: "1992 Tube Stock Grab Pole Refurbishment". Published status: active. Published value: Value not published. 1 published lot. Recorded submission deadline: 10 Mar 2021, 13:00 GMT. See the official notice for participation instructions.
| Contracting Authority | Transport for London | Scope & Categories | Not published | Submission Window | Closed 10 Mar 2021, 13:00 GMT |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Transport for London
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Transport for London. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 0 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityTransport for London | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published3 Feb 2021, 16:02 GMT | Last source update3 Feb 2021, 16:02 GMT | Recurring procurementNo |
ClassificationMetal, Repair and maintenance services, Repair, maintenance and associated services of vehicles and related equipment | ||
Delivery area | ||
OCIDocds-h6vhtk-028ff4 | ||
What is being bought
This requirement is for the refurbishment of the passenger grab poles currently installed within the saloon of 1992 Tube Stock (92TS) operating on the Central and Waterloo & City lines of London Underground (LU).
The Waterloo & City Line will be an option at LU's discretion.
Grab pole refurbishment is required to address the poor state of finish on the existing grab poles. This includes areas where the current coating is worn, discoloured or missing.
A consistent coating finish and specific coating colour are required to comply with the Rail Vehicle Accessibility Regulations (RVAR).
Some grab poles are expected to have damage to the grub screw fixing arrangement and / or are expected to have suffered corrosion damage (the bottom end of the central floor mounted grab poles in particular). This will require repairing as part of the refurbishment.
Due to tolerances and the likelihood of small levels of distortion, the grab poles must be re-fitted in the same location that they were removed from. A method of assigning a unique identifier to each grab pole must therefore be developed.
The grab pole refurbishment work is part of a large programme of works referred to as CLIP. The CLIP programme of works for the Central Line trains takes place on an 8-car train at the Acton Works site, whilst on the Waterloo & City Line trains, the work takes place on a 4-car train at Waterloo Depot.
The refurbishment scope is expected to include, but is not limited to;
• Collection from site
• Removal of the existing coating
• Inspection for damage against agreed criteria
• The repair of any damage in accordance with agreed processes
• The application of a new coating in accordance with agreed processes
• Return to site
More details are included with the attached documentation.
What changed
From the official release history
- Status changed to active
3 Feb 2021, 16:02 GMT - Official notice release published
3 Feb 2021, 16:02 GMT - Submission deadline changed to 10 Mar 2021, 13:00 GMT
3 Feb 2021, 16:02 GMT - Buyer information updated
3 Feb 2021, 16:02 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedactivePublished valueNot publishedThis requirement is for the refurbishment of the passenger grab poles currently installed within the saloon of 1992 Tube Stock (92TS) operating on the Central and Waterloo & City lines of London Underground (LU). The Waterloo & City Line will be an option at LU's discretion. Grab pole refurbishment is required to address the poor state of finish on the existing grab poles. This includes areas where the current coating is worn, discoloured or missing. A consistent coating finish and specific coating colour are required to comply with the Rail Vehicle Accessibility Regulations (RVAR). Some grab poles are expected to have damage to the grub screw fixing arrangement and / or are expected to have suffered corrosion damage (the bottom end of the central floor mounted grab poles in particular). This will require repairing as part of the refurbishment. Due to tolerances and the likelihood of small levels of distortion, the grab poles must be re-fitted in the same location that they were removed from. A method of assigning a unique identifier to each grab pole must therefore be developed. The grab pole refurbishment work is part of a large programme of works referred to as CLIP. The CLIP programme of works for the Central Line trains takes place on an 8-car train at the Acton Works site, whilst on the Waterloo & City Line trains, the work takes place on a 4-car train at Waterloo Depot. The refurbishment scope is expected to include, but is not limited to; • Collection from site • Removal of the existing coating • Inspection for damage against agreed criteria • The repair of any damage in accordance with agreed processes • The application of a new coating in accordance with agreed processes • Return to site More details are included with the attached documentation.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
3 Feb 2021, 16:02 GMT - Submission deadline
10 Mar 2021, 13:00 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Transport for London
Contracting authority GB-FTS-4286Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published