Find a TenderClosedTender notice
Published 27 Apr 2026, 10:02 BST

Official UK procurement notice

183592 CP7 Earthworks Asset Monitoring Capital Delivery Western Framework

Official notice

Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)

Framework agreementWorksCompetitive flexible procedureAbove thresholdUtilitiesSME suitableVCSE suitable
Framework ceiling (notional)£11,039,000framework ceiling, not attributable revenue
Submissions closed 3 Jul 2026
Framework period 3 yrs 2 moends 1 Oct 2029 · up to 1 Oct 2030 with extensions · starts 7 Aug 2026

What is being bought

Published requirement description

The project scope is for surveys and monitoring in the W&W route for Geotech. This will roughly consist of four key workstreams. The first work stream is the installation of Earthwork Failure detection systems, these are utilised to detect failures and inform Route Control of earthwork movement. The second is Cant and Twist Sensors, these are track sensors installed at rail level to detect movement in embankments. The third is survey works called Ground Investigation Assessments (GIA), this is pre renewals works to install monitoring such as Piezometers/inclinometer to detect movement or changes in earthworks, technical reports and further recommendations may be requested as part of this workstream. The final is the ongoing maintenance of existing assets, ensuring they are kept live, functional and the systems communicate with route control. For EFD sites this might mean vegetation clearance around cameras, replacement when they are damaged and similar with the Cant and Twist schemes.

  • How the procedure runs: The procurement will be conducted as a Competitive Flexible Procedure in accordance with the Procurement Act 2023. Suppliers will be required to submit both supplier selection information and tender responses as part of a single submission. Selection questions are included to enable the contracting authority to assess supplier eligibility, financial standing, and technical capability. Tender questions relate to the evaluation of the supplier’s proposed solution and pricing. Although these questions are issued within the same tender pack, the contracting authority will evaluate responses sequentially to ensure compliance with procurement law. The evaluation process will be conducted in the following order: 1. Assessment of exclusion grounds. PSQ 2. Assessment of supplier selection criteria (financial and technical capability). PSQ 3. Evaluation of tenders against the published award criteria. ITT Only the 4 highest scoring suppliers who meet the selection requirements will move forward to award evaluation. This approach is consistent with the competive flexible procedure permitted under the Procurement Act 2023 and ensures transparency, equal treatment, and proportionality in the procurement process. All Participants are required to review all tender documents for full details Ground for Participation Supplier Capability As part of the supplier selection assessment, suppliers must demonstrate that they possess the necessary technical capability and professional competence to deliver the contract. In order to participate in this procurement process, suppliers must demonstrate that they: • Hold appropriate Principal Contractor qualifications relevant to the delivery of the works and in accordance with applicable health and safety legislation. • Have demonstrable experience of acting as Principal Contractor on comparable projects. • Have the capability and competence to manage possessions and access arrangements safely and effectively where works are required within operational or controlled infrastructure environments. We need the ability for rail possessions to managed and instructed for contract award, no allowances will be made to obtain this post award this is a strict eligibility condition: if a bidder does not currently meet the requirement, they are automatically disqualified. . This requirement is mandatory, directly related to the subject matter of the contract, and will be applied fairly to all bidders. Safety-Critical Technical Capability Due to the safety-critical nature of the works, suppliers must demonstrate that they possess the necessary technical capability and relevant experience in delivering infrastructure monitoring solutions within operational environments. To participate in this procurement process, suppliers must demonstrate proven experience in the design, implementation, and/or management of monitoring systems used to detect and manage infrastructure risk. Suppliers must provide evidence of experience in one or more of the following areas: • Operation or deployment of Track Cant and Twist (C&T) automated monitoring systems. • Implementation or management of Earthwork Failure Detection (EFD) systems. • Delivery or operation of Remote Condition Monitoring (RCM) solutions for infrastructure or geotechnical assets. • Experience of delivering monitoring solutions within safety-critical transport or infrastructure environments, including the management of data alerts, thresholds, and escalation procedures. Suppliers must provide examples of at least two comparable projects delivered within the past five years demonstrating relevant capability. These requirements will be assessed at both PSQ and ITT. Please ensure you have you have experience in delivering these systems along the railway. Failure to evidence these requirements specifically will result in an PSQ failure and your ITT submission will not be evaluated.

CPV: Construction work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Places
up to 1 suppliers
Framework period
3 yrs 2 mo · up to 4 yrs 2 mo from 7 Aug 2026, N/A
Supplier levy on call-offs (max %)
N/A
Published description of the framework

Schedule of rates with each defined individual call off as a fixed price lump sum

The lotProcurement structure

single lot · value published
Lot #1Renewal 3 yrs 2 moSMEVCSEPublished value£11,039,000
Contract period: 7 Aug 2026 – 1 Oct 2029 (3 yrs 2 mo) · up to 1 Oct 2030 with extensionsValue: £11,039,000 exc. VAT · £13,246,800 inc. VAT
Delivery: UKEligibility: SME eligibleVCSE eligible
Extensions: 3 + 1 years extension subject to performance and any ad hoc or legacy work requirements
Pre-qualification & selection criteria (PQQ)3
  • Economic & financial standing
    1. Supplier Financial Health Model Score greater than or equal to 40%.
    2. Debarment Details
    3. The following insurances in place post contract award:
    • Employer’s (Compulsory) Liability Insurance = £10m
    • Public Liability Insurance = £10m
    • Professional Indemnity Insurance = £10m
    1. Registry with the CDP (Central Digital Platform)
  • Technical & professional ability

    Supplier Capability

    As part of the supplier selection assessment, suppliers must demonstrate that they possess the necessary technical capability and professional competence to deliver the contract.

    In order to participate in this procurement process, suppliers must demonstrate that they:

    • Hold appropriate Principal Contractor qualifications relevant to the delivery of the works and in accordance with applicable health and safety legislation.
    • Have demonstrable experience of acting as Principal Contractor on comparable projects.
    • Have the capability and competence to manage possessions and access arrangements safely and effectively where works are required within operational or controlled infrastructure environments.

    We need the ability for rail possessions to managed and instructed for contract award, no allowances will be made to obtain this post award this is a strict eligibility condition: if a bidder does not currently meet the requirement, they are automatically disqualified. . This requirement is mandatory, directly related to the subject matter of the contract, and will be applied fairly to all bidders.

    Safety-Critical Technical Capability

    Due to the safety-critical nature of the works, suppliers must demonstrate that they possess the necessary technical capability and relevant experience in delivering infrastructure monitoring solutions within operational environments.

    To participate in this procurement process, suppliers must demonstrate proven experience in the design, implementation, and/or management of monitoring systems used to detect and manage infrastructure risk.

    Suppliers must provide evidence of experience in one or more of the following areas:

    • Operation or deployment of Track Cant and Twist (C&T) automated monitoring systems.
    • Implementation or management of Earthwork Failure Detection (EFD) systems.
    • Delivery or operation of Remote Condition Monitoring (RCM) solutions for infrastructure or geotechnical assets.
    • Experience of delivering monitoring solutions within safety-critical transport or infrastructure environments, including the management of data alerts, thresholds, and escalation procedures.

    Suppliers must provide examples of at least two comparable projects delivered within the past five years demonstrating relevant capability.

    These requirements will be assessed at both PSQ and ITT. Please ensure you have you have experience in delivering these systems along the railway. Failure to evidence these requirements specifically will result in an PSQ failure and your ITT submission will not be evaluated.

  • Condition of participation

    open for PSQ

    shortlisting

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
  • Technical and Methodology: PSQ 100% Technical & Ability question 1 20% Technical & Ability question 2 20% Technical & Ability question 3 20% Reporting & Data Management 20% H&S - 20% ITT Technical: 50% Technical & Methodology 25% Outline Programme – PASS/FAIL Contract Org, key personnel & CV’s, Sub-Contractors and Suppliers -10% HSEA 5% Sustainability and Social Value- 10% Commercial & Pricing Evaluation – 50%
Conditions of participation3
  • Economic & financial standing
    1. Supplier Financial Health Model Score greater than or equal to 40%.
    2. Debarment Details
    3. The following insurances in place post contract award:
    • Employer’s (Compulsory) Liability Insurance = £10m
    • Public Liability Insurance = £10m
    • Professional Indemnity Insurance = £10m
    1. Registry with the CDP (Central Digital Platform)
  • Technical & professional ability

    Supplier Capability

    As part of the supplier selection assessment, suppliers must demonstrate that they possess the necessary technical capability and professional competence to deliver the contract.

    In order to participate in this procurement process, suppliers must demonstrate that they:

    • Hold appropriate Principal Contractor qualifications relevant to the delivery of the works and in accordance with applicable health and safety legislation.
    • Have demonstrable experience of acting as Principal Contractor on comparable projects.
    • Have the capability and competence to manage possessions and access arrangements safely and effectively where works are required within operational or controlled infrastructure environments.

    We need the ability for rail possessions to managed and instructed for contract award, no allowances will be made to obtain this post award this is a strict eligibility condition: if a bidder does not currently meet the requirement, they are automatically disqualified. . This requirement is mandatory, directly related to the subject matter of the contract, and will be applied fairly to all bidders.

    Safety-Critical Technical Capability

    Due to the safety-critical nature of the works, suppliers must demonstrate that they possess the necessary technical capability and relevant experience in delivering infrastructure monitoring solutions within operational environments.

    To participate in this procurement process, suppliers must demonstrate proven experience in th…

  • Condition of participation

    open for PSQ

    shortlisting
What this means for your bid
  • “183592 CP7 Earthworks Asset Monitoring Capital Delivery Western…” is a framework: the contest is a place on its panel, up to 1 suppliers, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA, CPTPP)
Recurring procurement
Unspecified in notice
First published
27 Apr 2026, 10:02 BST
Last source update
27 Apr 2026, 10:02 BST
Award evaluation window
Submission end – 20 Jul 2026
FTS notice number
2026/S 000-037859
Latest notice
Tender notice (UK4)
Classification (CPV)
Construction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-068b3d Find a Tender
Contract terms summary

NEC4 NR29 Contract agreement Apps and Certs

How it runs

The procurement will be conducted as a Competitive Flexible Procedure in accordance with the Procurement Act 2023. Suppliers will be required to submit both supplier selection information and tender responses as part of a single submission.

Selection questions are included to enable the contracting authority to assess supplier eligibility, financial standing, and technical capability. Tender questions relate to the evaluation of the supplier’s proposed solution and pricing.

Although these questions are issued within the same tender pack, the contracting authority will evaluate responses sequentially to ensure compliance with procurement law. The evaluation process will be conducted in the following order:

  1. Assessment of exclusion grounds. PSQ
  2. Assessment of supplier selection criteria (financial and technical capability). PSQ
  3. Evaluation of tenders against the published award criteria. ITT

Only the 4 highest scoring suppliers who meet the selection requirements will move forward to award evaluation. This approach is consistent with the competive flexible procedure permitted under the Procurement Act 2023 and ensures transparency, equal treatment, and proportionality in the procurement process.

All Participants are required to review all tender documents for full details

Ground for Participation

Supplier Capability

As part of the supplier selection assessment, suppliers must demonstrate that they possess the necessary technical capability and professional competence to deliver the contract.

In order to participate in this procurement process, suppliers must demonstrate that they:

  • Hold appropriate Principal Contractor qualifications relevant to the delivery of the works and in accordance with applicable health and safety legislation.
  • Have demonstrable experience of acting as Principal Contractor on comparable projects.
  • Have the capability and competence to manage possessions and access arrangements safely and effectively where works are required within operational or controlled infrastructure environments.

We need the ability for rail possessions to managed and instructed for contract award, no allowances will be made to obtain this post award this is a strict eligibility condition: if a bidder does not currently meet the requirement, they are automatically disqualified. . This requirement is mandatory, directly related to the subject matter of the contract, and will be applied fairly to all bidders.

Safety-Critical Technical Capability

Due to the safety-critical nature of the works, suppliers must demonstrate that they possess the necessary technical capability and relevant experience in delivering infrastructure monitoring solutions within operational environments.

To participate in this procurement process, suppliers must demonstrate proven experience in the design, implementation, and/or management of monitoring systems used to detect and manage infrastructure risk.

Suppliers must provide evidence of experience in one or more of the following areas:

  • Operation or deployment of Track Cant and Twist (C&T) automated monitoring systems.
  • Implementation or management of Earthwork Failure Detection (EFD) systems.
  • Delivery or operation of Remote Condition Monitoring (RCM) solutions for infrastructure or geotechnical assets.
  • Experience of delivering monitoring solutions within safety-critical transport or infrastructure environments, including the management of data alerts, thresholds, and escalation procedures.

Suppliers must provide examples of at least two comparable projects delivered within the past five years demonstrating relevant capability.

These requirements will be assessed at both PSQ and ITT. Please ensure you have you have experience in delivering these systems along the railway. Failure to evidence these requirements specifically will result in an PSQ failure and your ITT submission will not be evaluated.

Review and risk notes
Risks

The Contract used for this Framework is the NEC4 NR29 any changes to the Network T&C's will require Network Rail Legal approval prior to contract award. The draft NEC4 NR29 will be issued with the Tender Documentation.

KPI's are being established and will be issued at time of tender. The framework agreement will include clear provisions for managing supplier non-performance. Should the supplier fail to meet contractual obligations or KPIs, they will be given a defined period to implement corrective actions and rectify any identified issues. Should the supplier fail to corrective the non-compliance within this period, the contract will include termination for default clauses allowing Network Rail to end the agreement.

Emergency Procurement / Direct Award under Procurement Act 2023 – Should there be sufficient documentation to evidence urgency and risk.

Direct Award to the Runner-Up from the Tender – awarded through tender variation clause should the runner up evidence capability and readiness

How it was run

Official notice
Run through: Jaggaer · Who buys & how to bid on JAGGAER
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free; latest Chrome/Edge/Firefox only — corporate browsers fail
Requests to participate (first stage)
3 Jul 2026, 17:00 BST
Appointment period ends
3 Jul 2026, 17:00 BST
Clarification deadline
29 Jun 2026, 12:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · N/A
Detailed submission instructions & authority contactsFrom official release

To participate in the Earthworks Monitoring Framework, suppliers must be enrolled on our procurement system:

networkrail.bravosolution.co.uk/web/login.html ↗

Please ensure your organisation is fully registered before attempting to access the tender.

The first stage: PSQ reference is: pqq_3882 - 183592 CP7 Earthworks Asset Monitoring Capital Delivery W&W

This reference should allow you to add your supplier profile to the project within the portal.

If you experience any difficulties adding yourself to the project, please contact:

Margaret Powell – Senior Buyer

[email protected]

Rebecca Cronick – Senior Buyer

[email protected]

Timeline

27 Apr 2026 → 7 Aug 2026 · 5 dates
  1. Tender notice published185 days ago
    27 Apr 2026, 10:02 BST
  2. Clarification questions by122 days ago
    29 Jun 2026, 12:00 BST
  3. Admission / appointment period ends118 days ago · period end, not a bid countdown
    3 Jul 2026, 17:00 BST
  4. Award decision expected by100 days ago
    20 Jul 2026, 23:59 BST
  5. Contract starts83 days ago
    7 Aug 2026, 00:00 BST

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    27 Apr 2026, 10:02 BST
    UK4

Contracting authority & participating public bodies

NETWORK RAIL INFRASTRUCTURE LIMITED

Contracting authorityPublic authority - central government GB-PPON: PNZN-9524-VCQJ Waterloo General Office, London, London, SE1 8SWContact name, email, phone

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsAccess: Via PSQ

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender