Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 671–680

  1. Ends · in 321 daysFramework re-letPanel · 11 suppliers

    Anti-ligature Doors, Windows and Furniture

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: Anti-Ligature Shop Ltd, Bridge Contract Solutions LTD, CSF Building Contractors Ltd +8 more

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £150mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  2. Ends · in 321 daysPanel · 5 suppliers

    B947 (2018) Excavation, Cable laying and Reinstatement

    Northern Ireland Electricity Networks Limited · Northern Ireland

    Panel: ADMAN CIVIL PROJECTS LIMITED, FP McCann Ltd, KN Network Services Ltd +2 more

    • Ancillary works for electricity power lines
    • Ancillary works for pipelines and cables
    • Construction work
    Contract value
    £140m
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-06c21a
  3. Ends · in 321 daysFramework re-letPanel · 6 suppliers

    Specialist Doors, Windows and Furniture

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: CSF Building Contractors Ltd, Hollmark Ltd, Inspired Glazing +3 more

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £100mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  4. Ends · in 321 daysFramework re-letPanel · 6 suppliers

    General Doors, Windows and Furniture

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: CSF Building Contractors Ltd, D M HABENS (THE BUILDER) LTD, Hollmark Ltd +3 more

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £100mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  5. Ends · in 321 daysFramework re-letPanel · 7 suppliers

    Bespoke

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: D M HABENS (THE BUILDER) LTD, Hollmark Ltd, Inspired Glazing +4 more

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £100mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  6. Ends · in 321 daysFramework re-letPanel · 3 suppliers

    Consultancy and Professional Services

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: Custom Group Limited, Nationwide Fire Door Services, Protects Plus Ltd

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £50mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  7. Ends · in 321 days

    B947 (2020) Excavation, Cable laying and Reinstatement

    Northern Ireland Electricity Networks Limited · Northern Ireland

    Incumbent: Morrow Contracts Ltd

    • Ancillary works for electricity power lines
    • Ancillary works for pipelines and cables
    • Construction work
    Contract value
    £37m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-06c21e
  8. Ends · in 321 daysExtension option · up to 31 May 2028

    Core Valley Lines (CVL) Transformation: Complex track works with associated level boarding works

    Transport for Wales (TFW) · Other public body · Wales (Cymru)

    Incumbent: Amey Infrastructure Wales (AIW)

    • Railway construction works
    • Railway-track construction materials and supplies
    Contract value
    £9.8m
    Annual run-rate
    £7.1mvalue ÷ published term
    Term
    13 Apr 2026 → 31 Aug 2027 · 1.3 yrs · up to 31 May 2028 with extensions
    Reference
    ocds-h6vhtk-059e3f
  9. Ends · in 321 daysFramework re-letPanel · 6 suppliers

    Lot 1 - Supply and Installation of Curtains and Blinds

    ESPO · Nationwide (UK)

    Panel: Bridge Contract Solutions LTD, Custom Group Limited, SIR JACOB BEHRENS AND SONS LIMITED +3 more

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £3.8mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  10. Ends · in 321 days

    Netherhall School - Replacement External Doors and Windows

    Cumberland Council · Local authority · North West England

    Incumbent: Thomas Armstrong (Construction) Ltd

    • Construction work
    Contract value
    £859k
    Annual run-rate
    £406kvalue ÷ published term
    Term
    21 Jul 2025 → 31 Aug 2027 · 2.1 yrs
    Reference
    ocds-h6vhtk-050b2f
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.