Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 12 months

Showing 10,271–10,280

23,940 contracts

  1. Ends · in 158 daysExtension option

    Navtex (NAVigational TELeX) and DSC (Digital Selective Calling) Managed Service

    Maritime and Coastguard Agency · Central government · Nationwide (UK)

    Incumbent: I.C.S. ELECTRONICS LIMITED

    12 month contract for the managed service of NAVTEX, including Digital Selective Calling (DSC) and NAVTEX Cloud, to the incumbent supplier of these services. This is a direct award. The MCA is currently implementing a new Navtex and DSC sol…

    Published value
    £193k
    Annual run-rate
    £193kpublished value ÷ term, exc. VAT
    Term
    1 Apr 2026 → 31 Mar 2027 · 1 yr
    Reference
    ocds-h6vhtk-0605f2
  2. Ends · in 158 days

    UKRI-5617 VOPPEL Refurbishment

    UK Research and Innovation · Central government · South East England

    Incumbent: PHOTONIC SOLUTIONS LIMITED

    Purchase of 1x Pharos-4mj-20W, with <250 fs, 20W 4 mJ Specifications and 1x Repetition Rate Locking Capability for synchronisation with the Vulcan 20-20 Front-End. VOPPEL is a petawatt-level laser system that is presently being refurbished …

    Published value
    £193k
    Annual run-rate
    £165kpublished value ÷ term, exc. VAT
    Term
    30 Jan 2026 → 31 Mar 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-0601b2
  3. Ends · in 158 days

    Installation and Connection of a new upgraded electrical supply at Kendal Leisure Centre

    Westmorland and Furness Council · Local authority · North West England

    Incumbent: Electricity North West (Construction and Maintenance) Limited

    The Installation and connection of a new upgraded electrical supply at Kendal Leisure Centre.

    Published value
    £193kinc. VAT as published
    Annual run-rate
    £230kpublished value ÷ term, inc. VAT
    Term
    30 May 2026 → 31 Mar 2027 · 10 months
    Reference
    ocds-h6vhtk-06a863
  4. Ends · in 158 days

    Cheshire Archives - Short Films

    Cheshire west and Chester Borough Council · Education · North West England

    Incumbent: HERITAGE INTERACTIVE LTD

    Short films for the Cheshire Archives buildings

    Published value
    £192kinc. VAT as published
    Annual run-rate
    £379kpublished value ÷ term, inc. VAT
    Term
    28 Sept 2026 → 31 Mar 2027 · 6 months
    Reference
    ocds-h6vhtk-077e87
  5. Ends · in 158 days

    Hydraulic Water press for HMP Elmley

    Ministry of Justice · Central government · Nationwide (UK)

    Incumbent: Girbau UK Ltd

    The supply, installation and commissioning of a Hydraulic Water Press to HMP Elmley. Note due to a technical issues with FTS platform we were unable to publish this notice and subsequent notices within the timeframes prescribed in the Procu…

    Published value
    £192k
    Annual run-rate
    £294kpublished value ÷ term, exc. VAT
    Term
    6 Aug 2026 → 31 Mar 2027 · 8 months
    Reference
    ocds-h6vhtk-06dd28
  6. Ends · in 158 days

    RCT Asset and Property Management System

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: CIVICA UK LIMITED

    Provision of software support and maintenance of Asset and Property Management System

    Published value
    £191kinc. VAT as published
    Annual run-rate
    £96kpublished value ÷ term, inc. VAT
    Term
    1 Apr 2025 → 31 Mar 2027 · 2 yrs
    Reference
    ocds-h6vhtk-054eff
  7. Ends · in 158 days

    Asset and Property Management System

    Rhondda Cynon Taf CBC · Other public body · Wales (Cymru)

    Incumbent: CIVICA UK LIMITED

    Provision of software support and maintenance of Asset and Property Management System

    Published value
    £191kinc. VAT as published
    Annual run-rate
    £96kpublished value ÷ term, inc. VAT
    Term
    1 Apr 2025 → 31 Mar 2027 · 2 yrs
    Reference
    ocds-h6vhtk-0550dd
  8. Ends · in 158 days

    Provision of specialist zero carbon/timber /supply chain related support to Tai ar y Cyd project

    Llywodraeth Cymru / Welsh Government · Central government · Wales (Cymru)

    Incumbent: Woodknowledge Wales Ltd

    Management, oversight and provision of additional net zero standard related house designs, alongside architect support for Registered Social Landlord teams - bringing forward prototyping schemes.

    Published value
    £191k
    Annual run-rate
    £208kpublished value ÷ term, exc. VAT
    Term
    1 May 2026 → 31 Mar 2027 · 11 months
    Reference
    ocds-h6vhtk-067879
  9. Ends · in 158 daysCall-offPanel · 3 suppliers

    Lot 3 - Construction Materials

    ESPO · Nationwide (UK)

    Panel: ARTSTRAWS MFG LTD, DRYAD CREATIVE LIMITED (Previously DRYAD EDUCATION LIMITED), Major Brushes Limited · Last contest: 8 bids (8 SME)

    Framework for the supply of Air Drying and Kiln Drying Modelling Clays and Glazes, Soft Modelling Dough, Silver and Modelling Sand and Construction Materials including Foam, Wood for educational use for delivery to the ESPO Distribution Cen…

    • Sand and clay
    Published value
    £190kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0487fc
  10. Ends · in 158 daysExtension option · up to 31 Mar 2028

    Connect to Work

    Dudley Metropolitan Borough Council · Local authority · West Midlands

    Incumbent: Pilot IMS · Last contest: awarded at the estimate

    Dudley MBC is commissioning a Connect to Work delivery partner to contribute to a single, borough wide supported employment system, rather than standalone or parallel services. The Council is seeking locally embedded organisations with an e…

    Published value
    £190k
    Annual run-rate
    £265kpublished value ÷ term, exc. VAT
    Term
    13 Jul 2026 → 31 Mar 2027 · 9 months · up to 31 Mar 2028 with extensions
    Reference
    ocds-h6vhtk-06981f

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,152 contracts and agreements end within 24 months, 60,676 in total · £43bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,762
  2. 3–6 months8,030
  3. 6–12 months10,148
  4. 12–24 months14,212

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.