Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the all future end dates
Showing 60,361–60,375
- Estimated end · in 5,110 days
Procurement for the provision, maintenance and operation of on-street Electric Vehicle (EV) Charging Infrastructure
Reading Borough Council · Local authority · South East England
Incumbent: Char.gy Limited · Last contest: 5 bids · awarded 7% over the estimate
The contract is for the installation of a minimum of 1,500 standard speed on-street EV chargers that utilise the existing on-street lamp column network for power where possible.
- Published value
- £203m
- Annual run-rate
- —start date not published
- Term
- Estimated end 19 Oct 2040 · start not published
- Reference
ocds-h6vhtk-04d782
- Ends · in 5,125 days
Visual Field Analyser
South Tyneside and Sunderland NHS Foundation Trust · NHS & health · North East England
Incumbent: HAAG STREIT UK LTD
Visual Field Analyser and full life maintenance for Sunderland Eye Infirmary
- Published value
- £38k
- Annual run-rate
- £3kpublished value ÷ term, exc. VAT
- Term
- 12 Nov 2025 → 2 Nov 2040 · 15 yrs
- Reference
ocds-h6vhtk-065911
- Ends · in 5,128 daysFramework recordPanel · 4 suppliers
Decommissioning Nuclear Waste Partnership (DNWP)
Sellafield Limited · Other public body · North West England
Panel: A2R (Altrad Support Services Limited and AtkinsRéalis UK Limited), Amentum Clean Energy Ltd, NDS (Altrad Support Services Ltd, Cavendish Nuclear Ltd, Shepley Engineers Ltd) +1 more
- Published value
- £4.6bnpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 5 Nov 2040 · start not published
- Reference
ocds-h6vhtk-03ebdd
- Ends · in 5,153 days
NCC202500253 - Installation of 19 on-street Electric Vehicle (EV) ChargePoint's
Newport City Council · Local authority · Wales (Cymru)
Incumbent: Lot 3 - Urban Fox Networks (UK) Limited
NCC has been granted funding to complete the remaining EV chargepoint installations.Previously, NCC ran a mini competition via the Oxford Council DPS, which they managed. This resulted in two contracts being awarded: One for on-street charg…
- Published value
- £400k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 8 Dec 2025 → 30 Nov 2040 · 15 yrs
- Reference
ocds-h6vhtk-05e156
- Estimated end · in 5,157 days
The Supply and Maintenance of Street Furniture with or without Advertising
City of York Council · Local authority · Yorkshire and the Humber
Incumbent: Clear Channel UK Ltd · Last contest: 3 bids · awarded at the estimate
Place Based Advertising exclusive arrangement with a media owner to provide and maintain small format place-based advertising across the Council’s geography on Council-owned land, providing internally illuminated and digital Advertising and…
- Published value
- £3.2m
- Annual run-rate
- —start date not published
- Term
- Estimated end 5 Dec 2040 · start not published
- Reference
ocds-h6vhtk-049b52
- Estimated end · in 5,164 days
Residual Waste Contract – Lot 1
London Borough of Barking and Dagenham · Local authority · Greater London
Incumbent: Cory Topco Ltd · Last contest: 1 bid
- Published value
- £291m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Dec 2040 · start not published
- Reference
ocds-h6vhtk-03f9d7
- Estimated end · in 5,164 days
Residual Waste Contract – Lot 1
East London Waste Authority · Greater London
Incumbent: Cory Topco Ltd · Last contest: 1 bid
- Published value
- £291m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Dec 2040 · start not published
- Reference
ocds-h6vhtk-03f9d7
- Estimated end · in 5,164 days
Residual Waste Contract – Lot 2
London Borough of Barking and Dagenham · Local authority · Greater London
Incumbent: Cory Topco Ltd · Last contest: 1 bid
- Published value
- £194m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Dec 2040 · start not published
- Reference
ocds-h6vhtk-03f9d7
- Estimated end · in 5,164 days
Residual Waste Contract – Lot 2
East London Waste Authority · Greater London
Incumbent: Cory Topco Ltd · Last contest: 1 bid
- Published value
- £194m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Dec 2040 · start not published
- Reference
ocds-h6vhtk-03f9d7
- Estimated end · in 5,164 days
Residual Waste Contract – Lot 3
London Borough of Barking and Dagenham · Local authority · Greater London
Incumbent: Cory Topco Ltd · Last contest: 3 bids
- Published value
- £162m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Dec 2040 · start not published
- Reference
ocds-h6vhtk-03f9d7
- Estimated end · in 5,164 days
Residual Waste Contract – Lot 3
East London Waste Authority · Greater London
Incumbent: Cory Topco Ltd · Last contest: 3 bids
- Published value
- £162m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Dec 2040 · start not published
- Reference
ocds-h6vhtk-03f9d7
- Estimated end · in 5,173 days
Contract
Derry City and Strabane District Council · Local authority · Northern Ireland
Incumbent: Weev.ie Ltd · Last contest: 5 bids (1 SME)
Derry City and Strabane District Council, as Lead Council of the Northern Ireland Electric Vehicle (EV) Consortium, is issuing this Invitation to Tender ("ITT") as an Open Tender exercise. This invitation to tender is to appoint a single su…
- Published value
- £2.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Dec 2040 · start not published
- Reference
ocds-h6vhtk-046f40
- Estimated end · in 5,174 days
CONCESSION CONTRACT FOR A STRATEGIC PARTNER TO DELIVER CHESHIRE EAST'S LOCAL ELECTRIC VEHICLE INFRASTRUCTURE (LEVI) PROJECT
Cheshire East Council · Local authority · North West England
Incumbent: Qwello Uk Ltd · Last contest: 5 bids · awarded 3% over the estimate
This contract is for a strategic partnership and for the installation, maintenance, and operation of electric vehicle charge points across the borough utilising LEVI funding.
- Published value
- £62m
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Dec 2040 · start not published
- Reference
ocds-h6vhtk-04e28a
- Estimated end · in 5,181 days
South East & Coast, and Greater London
The Guinness Partnership · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, Greater London
Incumbent: Axis Europe · Last contest: 7 bids
The Guinness Partnership Limited are entering into contract with regional contractors to deliver its Planned Investment and Major Works programmes for our portfolio of properties over a period of up to 15 years in length. The contracts will…
- Published value
- £390m
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Dec 2040 · start not published
- Reference
ocds-h6vhtk-04b400
- Estimated end · in 5,181 days
North West and Greater Manchester
The Guinness Partnership · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, East of England, Greater London
Incumbent: United Living Property Services · Last contest: 6 bids
The Guinness Partnership Limited are entering into contract with regional contractors to deliver its Planned Investment and Major Works programmes for our portfolio of properties over a period of up to 15 years in length. The contracts will…
- Published value
- £330m
- Annual run-rate
- —start date not published
- Term
- Estimated end 29 Dec 2040 · start not published
- Reference
ocds-h6vhtk-04b400
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,087 contracts and agreements end within 24 months, 60,556 in total · £224bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
By sector, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services7,32760Transport services (except waste transport)3,15745Construction work2,43779Business services: law, marketing, consulting1,99250Repair and maintenance services1,74690Sewage, refuse, cleaning and environmental1,62533Medical equipments, pharmaceuticals1,36071Architectural, construction, engineering1,335
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.