Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the next 6 months

Showing 1,036–1,050

  1. Ends · in 111 days

    PR342024 Refurbishment works to King William Street Bridge

    Exeter City Council · Local authority · South West England

    Incumbent: Taziker Industrial · Last contest: awarded 1% under the estimate

    Exeter City Council seeks to appoint a contractor to undertake essential refurbishment works to King William Street Bridge, a steel truss pedestrian bridge connecting Sidwell Street and the John Lewis Car Park across a two-lane, one-way car…

    Published value
    £139k
    Annual run-rate
    £139kpublished value ÷ term, exc. VAT
    Term
    18 Feb 2026 → 17 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-05ce0f
  2. Ends · in 111 days

    Construction work

    Cambridge University Hospitals NHS Foundation Trust · Central government · East of England

    Incumbent: Pentaco Construction Ltd

    1102 - Increased works associated with the Coordination Centre scheme during the construction period associated with client change requests and infrastructure requirements.

    Published value
    £30k
    Annual run-rate
    £30kpublished value ÷ term, exc. VAT
    Term
    18 Feb 2026 → 17 Feb 2027 · 1 yr
    Reference
    ocds-h6vhtk-06569c
  3. Ends · in 112 days

    Brighton Marina to River Adur Coastal Scheme

    Brighton and Hove City Council · Local authority · South East England

    Incumbent: Van Oord UK Ltd.

    The Council is sharing this Invitation to Tender to obtain professional, properly defined and priced propositions for the construction of coastal protection works along Brighton and Hove coastline. The works require the removal of existing …

    Published value
    £16minc. VAT as published
    Annual run-rate
    £11mpublished value ÷ term, inc. VAT
    Term
    26 Aug 2025 → 18 Feb 2027 · 1.5 yrs
    Reference
    ocds-h6vhtk-050c6e
  4. Ends · in 112 days

    Brighton Marina to River Adur Coastal Scheme – Phase 2

    Brighton and Hove City Council · Local authority · South East England

    Incumbent: Van Oord UK Ltd.

    Published value
    £14m
    Annual run-rate
    £9.5mpublished value ÷ term, exc. VAT
    Term
    16 Sept 2025 → 18 Feb 2027 · 1.4 yrs
    Reference
    ocds-h6vhtk-050c6e
  5. Ends · in 113 days

    Window Renewal at Stephen Sanders Court

    London Borough of Wandsworth · Local authority

    Incumbent: HILTON ABBEY LTD

    Replacement of existing windows including extract fans to kitchens and bathrooms at Stephen Sanders Court, Salcott Road, SW11 6DQ.

    Published value
    £520k
    Annual run-rate
    —term under 6 months
    Term
    5 Oct 2026 → 19 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-077b3a
  6. Ends · in 113 days

    Purbrook Park School - Windows and Door Replacement

    Hampshire County Council · Local authority · South East England

    Incumbent: Joedan Manufacturing (UK) Ltd

    Replacement of single glazed timber and metal windows and external doors with aluminium.

    Published value
    £396k
    Annual run-rate
    —term under 6 months
    Term
    23 Nov 2026 → 19 Feb 2027 · 3 months
    Reference
    ocds-h6vhtk-0789cf
  7. Ends · in 113 days

    England Coastal Paths IOW2

    Isle of Wight NHS Trust · Local authority · South East England

    Incumbent: M.C.M. CONSTRUCTION LIMITED

    the provision of works to the England coastal path section IOW2, Wootton Bridge to Culver. The King Charles III England Coast Path (ECP) is a nationwide initiative to provide a 2,700-mile National Trail and is being funded through Natural E…

    Published value
    £313k
    Annual run-rate
    —term under 6 months
    Term
    14 Sept 2026 → 19 Feb 2027 · 5 months
    Reference
    ocds-h6vhtk-065ddb
  8. Ends · in 113 days

    57 Chase Vale Refurb

    Lichfield District Council · Local authority · West Midlands

    Incumbent: Tyrer Building Contractors Ltd

    Reconfiguration to create a more accessible bungalow. The bungalow will have a level access shower, accessible kitchen and door widenings throughout.

    Published value
    £87k
    Annual run-rate
    —term under 6 months
    Term
    26 Oct 2026 → 19 Feb 2027 · 4 months
    Reference
    ocds-h6vhtk-078e9e
  9. Estimated end · in 114 days

    East Region (Moray and Aberdeenshire)

    Forestry and Land Scotland · Scotland

    Incumbent: CR Contractors Tain Limited · Last contest: 2 bids (2 SME)

    • Road-maintenance works
    Published value
    £3.0mlist or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 20 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-0316a7
  10. Estimated end · in 114 days

    East Region (Moray and Aberdeenshire)

    Forestry and Land Scotland · Scotland

    Incumbent: CR Contracting North LTD · Last contest: 2 bids (2 SME)

    • Road-maintenance works
    Published value
    £3.0mlist or panel total repeated on every provider; not this contract's value
    Annual run-rate
    —list or panel total, not a run-rate
    Term
    Estimated end 20 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-0316a7
  11. Estimated end · in 115 daysCall-offPanel · 9 suppliers

    South East England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 16 bids (0 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £1.5bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  12. Estimated end · in 115 daysCall-offPanel · 9 suppliers

    London

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 17 bids (1 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £1.5bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  13. Estimated end · in 115 daysCall-offPanel · 11 suppliers

    South West England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: BAM CONSTRUCTION LIMITED, Bouygues UK, Galliford Try Construction Limited +8 more · Last contest: 11 bids (0 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £1.1bnvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  14. Estimated end · in 115 daysCall-offPanel · 7 suppliers

    West Region of SW England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: AJC Developments (South) Ltd, Halsall Construction Ltd, Kier Construction Ltd +4 more · Last contest: 10 bids (6 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £200mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785
  15. Estimated end · in 115 daysCall-offPanel · 6 suppliers

    East Region of SW England

    Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England

    Panel: E.W. Beard Limited, Halsall Construction Ltd, Kier Construction Ltd +3 more · Last contest: 12 bids (5 SME)

    To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…

    • Construction work
    Published value
    £200mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 21 Feb 2027 · start not published
    Reference
    ocds-h6vhtk-033785

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

2,848 contracts and agreements end within 24 months, 4,753 in total · £3.2bn published GBP values end in the next 6 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months928
  2. 3–6 months583
  3. 6–12 months597
  4. 12–24 months740

Top sectors, next 6 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.