Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 3 months
Showing 1–10
- Ends · tomorrow
Lighting replacement projects
University of Bedfordshire · Education · East of England
Incumbent: HACEL LIGHTING LIMITED
Lighting replacement projects-uOb
- Published value
- £108k
- Annual run-rate
- —term under 6 months
- Term
- 1 Sept 2026 → 30 Oct 2026 · 2 months
- Reference
ocds-h6vhtk-06f79d
- Ends · tomorrow
UKRI-6134 BAS - 200KVA Generator Sets
UK Research and Innovation · Central government · East of England
Incumbent: Prior Power Solutions Ltd
UKRI has appointed a supplier for the supply of 200KVA Generator Sets to the British Antarctic Survey.
- Published value
- £92k
- Annual run-rate
- —term under 6 months
- Term
- 29 Jun 2026 → 30 Oct 2026 · 4 months
- Reference
ocds-h6vhtk-06c072
- Ends · tomorrowExtension option · up to 30 Oct 2027
Seasonal Christmas light Installation, removal & maintenance
Ipswich Borough Council · Local authority
Incumbent: J Mccann & Co Limited · Last contest: awarded 21% under the estimate
Ipswich Borough Council is inviting Quotes for the installation, removal and maintenance of the seasonal Christmas Lights for Ipswich Town Centre.
- Published value
- £87k
- Annual run-rate
- £86kpublished value ÷ term, exc. VAT
- Term
- 30 Oct 2025 → 30 Oct 2026 · 1 yr · up to 30 Oct 2027 with extensions
- Reference
ocds-h6vhtk-058b8b
- Ends · tomorrow
CSP26182
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Ian Webb Engineering Ltd
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Contract details notice for the supply of Generator for R75 and delivery to …
- Published value
- £41k
- Annual run-rate
- £57kpublished value ÷ term, exc. VAT
- Term
- 13 Feb 2026 → 30 Oct 2026 · 9 months
- Reference
ocds-h6vhtk-06548e
- Ends · tomorrow
CSP26260
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Rigaku Europe SE
***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded without competition due to an absence of competition for technical reasons, only a particular supplier can supply the goods, servi…
- Published value
- €13,428
- Annual run-rate
- —not a GBP value
- Term
- 27 Feb 2026 → 30 Oct 2026 · 8 months
- Reference
ocds-h6vhtk-065f33
- Ends · in 2 days
COV - Palmer Lane External Lighting
Coventry City Council · Local authority
Incumbent: Candela Traditional Lighting Limited
Lighting Design, Product Selection, Supply of Products, Installation of Lighting Products and Electrical Testing & Certification for Palmer Lane
- Published value
- £90k
- Annual run-rate
- £66kpublished value ÷ term, exc. VAT
- Term
- 19 Jun 2025 → 31 Oct 2026 · 1.3 yrs
- Reference
ocds-h6vhtk-05509a
- Ends · in 2 days
SUPPLY OF LED PRODUCTION LIGHTING
Royal Welsh College of Music and Drama · Education · Wales (Cymru)
Incumbent: Adlib Audio · Last contest: awarded 1% under the estimate
The Royal Welsh College of Music and Drama (RWCMD) is seeking to reduce the energy consumption and upgrade its performance and teaching spaces through the expansion of its LED Production Lighting inventory, and subsequent Mains/Data distrib…
- Published value
- £206k
- Annual run-rate
- —term under 6 months
- Term
- 13 Aug 2026 → 31 Oct 2026 · 3 months
- Reference
ocds-h6vhtk-06ae98
- Ends · in 3 days
Purchase of Festoon Lighting
Southend-on-Sea City Council · Local authority · East of England
Incumbent: LIGHTING & ILLUMINATION TECHNOLOGY EXPERIENCE LIMITED
Purchase of festoon equipment for Southend Pier £56,164.69
- Published value
- £56k
- Annual run-rate
- —term under 6 months
- Term
- 17 Jul 2026 → 1 Nov 2026 · 4 months
- Reference
ocds-h6vhtk-06d1bc
- Ends · in 6 days
to supply 1 off MODULE:INNER, DRG PV1344210,
Sellafield Limited · Other public body · North West England
Incumbent: Induchem UK Ltd
MODULE:INNER, DRG PV1344210, ITEM L6013/2, MANUFACTURER DRG 55209300, FOR SIZE 50MM EASI-SLEEVE 2-WAY 1314 STRAINER VALVE, SIZE 40 x 80 x 40MM, 304L/PFA WITH 1000 MICRON STRAINER. (MANUFACTURER - XOMOX) TO BE SUPPLIED WITH - 3.1 MATERIAL CE…
- Published value
- £46k
- Annual run-rate
- £70kpublished value ÷ term, exc. VAT
- Term
- 11 Mar 2026 → 4 Nov 2026 · 8 months
- Reference
ocds-h6vhtk-067fc1
- Ends · in 11 days
Contract for the provision of a battery energy storage system (BESS) for Cheltenham Ice Rink
Cheltenham Borough Council · Local authority · South West England
Incumbent: John F Hunt limited
Contract for the provision of a battery energy storage system (BESS) for Cheltenham Ice Rink
- Published value
- £28k
- Annual run-rate
- £28kpublished value ÷ term, exc. VAT
- Term
- 10 Nov 2025 → 9 Nov 2026 · 1 yr
- Reference
ocds-h6vhtk-060ee0
When contracts end · Electrical machinery i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
215 contracts and agreements end within 24 months, 325 in total · £4.1m published GBP values end in the next 3 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 3 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 44 divisions shown.
45Construction work92879Business services: law, marketing, consulting74185Health and social work services47271Architectural, construction, engineering39672IT services: consulting, software, internet39650Repair and maintenance services28439Furniture, furnishings, domestic appliances26548Software package and information systems219
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.