← Back to search results

AwardedFind a Tender · award

Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator

Buyer: Minister for the Cabinet Office Acting through Crown Commercial Service →

BuyerMinister for the Cabinet Office Acting through Crown Commercial Service
StatusAwarded
DeadlineNot published
ValueValue not published
Published28 Feb 2023

What is being bought

The ‘Ventilator Challenge’ was created by the UK government and delivered across several government departments (Department of Health and Social Care, Cabinet Office and Ministry of Defence) as part of the drive to increase ventilator supply and support the UK National Health Service (NHS) in its response to the Coronavirus disease global pandemic (Covid-19). In March 2020, the Prime Minister called on manufacturers to help the UK to step up production of ventilators to support the UK’s response to the virus and save lives. This included working on new or adapted ventilator designs, as well the Government's work to buy ventilators from abroad. A contract award Notice was published on 25 May 2020 (reference 2020/S 100-243206) covering contracts awarded pursuant to the RMVS programme. This is a second contract award notice that covers contracts awarded thereafter. This contract was awarded as a result of the RMVS project. RMVS CANs Existing CANs relating to the RMVS project are 2020/S 100-243206, 2020/S 167-406004 and 2021/S 002-003456 (RMVS CANs). Due to the need to respond rapidly to the emerging situation, some design work, testing, developing and manufacturing was undertaken before a formalised contract with known costs and outputs was put in place between Cabinet Office and those RMVS suppliers at the time of the RMVS CANs. Instead Cabinet Office gave commitments to those RMVS suppliers to enable those suppliers to support the RMVS project at significant pace and to mitigate those suppliers operating entirely at risk during extremely turbulent and changing circumstances. The RMVS CANs reflected the estimated values as best known at the time and cost caps within which suppliers were operating. At the time of the RMVS CANs, in order to be as transparent as possible with the market, information available at the time of entering into those commitments was provided, notwithstanding that it was expected to take several months to settle on the final output and resulting contracts. The RMVS CANs were therefore published to notify the market of the estimated and maximum limits of the commitments Cabinet Office had entered into to support the RMVS project. Where a supplier appears on more than one RMVS CAN, this reflects an increase to the estimate or cost cap previously notified to the market. This contract is the Ventilator Challenge: Provision of Rapid Manufacture Ventilator Systems (RMVS) resulting from the support by T.J.Smith and Nephew Ltd to the RMVS project and which is the output of T.J.Smith and Nephew Ltd appearing on 2020/S 167-406004 of the RMVS CANs.

Delivery location

UK

Categories

Anaesthesia and resuscitation 33170000

Lot details

Lot 1

The ‘Rapid Manufacture Ventilator Systems (RMVS) programme’ is a workstream within the ventilator challenge progressing novel and modified designs for ventilator devices, manufactured on a rapid basis to ensure sufficient capacity within the NHS. Cabinet Office, who are running the RMVS programme on behalf of the UK government, engaged with a wide range of suppliers, including designers, manufacturers and component suppliers, to progress a number of ventilator models (by taking forward existing designs through licencing agreements and by developing new products based on existing products and based on new original designs) resulting in the manufacturer of ventilators to meet the identified need.

Statuscancelled

Award criteria
Quality — 100
price — 0

What is included

ItemCategoryQuantity
1Not publishedNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 33. The category anchor is Anaesthesia and resuscitation (33170000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 334,8542 median · 122.5 average (2,277 of 4,854 with a bid count)5.8 average (2,723 of 4,854 with named award suppliers)Not published
Same buyer231 median · 1 average (23 of 23 with a bid count)1.3 average (23 of 23 with named award suppliers)Not published
Delivery region: UK1,4327 median · 323.6 average (651 of 1,432 with a bid count)10 average (787 of 1,432 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleThe COVID-19 outbreak is a Public Health Emergency of International Concern as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised COVID-19 as a pandemic on 11 March 2020. The use of ventilator equipment is critical in treating patients with COVID-19 to take over the body’s breathing process when the disease has caused the lungs to fail and allow the patient time to fight off the infection and recover. In March the NHS across the UK had access to approximately 8,000 ventilators. Modelling based the trajectory of other European countries forecast the need for significant and extremely rapid increase in the UK ventilator capacity. The Prime Minister set the ambition on 16 March 2020 for industry to manufacture as many new ventilators as possible, recognising that coronavirus is the biggest threat this country had seen for decades and that we faced a moment of national emergency. Significant quantities of extra ventilators would be required to treat seriously ill patients during the first wave of infections. Similar shortfalls in ventilator stocks were identified globally. Pressure to increase manufacturing capacity of ventilators was immense, requiring novel designs and new supply chains to be rapidly created to meet that demand. In these circumstances a procurement following the usual timescales under the PCR 2015, including accelerated options, was impossible. Ventilator manufacturers and supply chains were under immediate and unprecedented global pressure to provide products. A delay in engaging with the market by running a usual procurement process ran the risk of failing to acquire the necessary stock of ventilator equipment and presenting a significant risk to life. Cabinet Office is satisfied the tests permitting use of the Negotiated procedure without prior publication (Regulation 32(2)(c)) are met: 1. As far as is strictly necessary: The Ventilator Challenge was identified as strictly necessary to meet anticipated demand on the NHS during the first wave of cases in the UK. 2. There are genuine reasons for extreme urgency: It is responding to COVID-19 immediately because of public health risks presenting a genuine emergency. 3. The events that have led to the need for extreme urgency were unforeseeable: The Commission itself confirmed: “The current coronavirus crisis presents an extreme and unforeseeable urgency – precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.” (Commissioner Breton, Internal Market, 01.04.2020). 4. It is impossible to comply with the usual timescales in the PCR: There was no time to run an accelerated procurement under the open, restricted or competitive procedures with negotiation that would allow it to secure delivery of products, particularly in light of the corresponding delays to timelines associated with securing increased manufacturing capacity and component supply within the required timescales. 5. The situation is not attributable to the contracting authority: It has not done anything to cause or contribute to the need for extreme urgency.
Rationale classificationsThe procurement falls outside the scope of application of the directive
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator

Statusactive

Contracts

Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator

Statusactive
Value£6,608,651

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-03acde
Latest release ID005855-2023
Latest release timestampTue Feb 28 2023 14:03:03 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodlimited
Procurement method detailsAward procedure without prior publication of a call for competition
Main procurement categorygoods
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
28 Feb 2023award, contract005855-2023

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "005855-2023",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 1,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "2",
        "value": 1,
        "measure": "electronicBids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2023-02-28T14:03:03Z",
  "ocid": "ocds-h6vhtk-03acde",
  "buyer": {
    "id": "GB-FTS-76307",
    "name": "Minister for the Cabinet Office Acting through Crown Commercial Service"
  },
  "links": [
    {
      "rel": "prev",
      "href": "https://ted.europa.eu/udl?uri=TED:NOTICE:406004-2020:TEXT:EN:HTML"
    }
  ],
  "awards": [
    {
      "id": "005855-2023-1",
      "title": "Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-76351",
          "name": "T.J.Smith and Nephew Ltd"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-03acde",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "The ‘Rapid Manufacture Ventilator Systems (RMVS) programme’ is a workstream within the ventilator challenge progressing novel and modified designs for ventilator devices, manufactured on a rapid basis to ensure sufficient capacity within the NHS.\nCabinet Office, who are running the RMVS programme on behalf of the UK government, engaged with a wide range of suppliers, including designers, manufacturers and component suppliers, to progress a number of ventilator models (by taking forward existing designs through licencing agreements and by developing new products based on existing products and based on new original designs) resulting in the manufacturer of ventilators to meet the identified need.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "description": "100"
            },
            {
              "type": "price",
              "description": "0"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ]
      }
    ],
    "title": "Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The ‘Ventilator Challenge’ was created by the UK government and delivered across several government departments (Department of Health and Social Care, Cabinet Office and Ministry of Defence) as part of the drive to increase ventilator supply and support the UK National Health Service (NHS) in its response to the Coronavirus disease global pandemic (Covid-19).\nIn March 2020, the Prime Minister called on manufacturers to help the UK to step up production of ventilators to support the UK’s response to the virus and save lives. This included working on new or adapted ventilator designs, as well the Government's work to buy ventilators from abroad.\nA contract award Notice was published on 25 May 2020 (reference 2020/S 100-243206) covering contracts awarded pursuant to the RMVS programme. This is a second contract award notice that covers contracts awarded thereafter.\nThis contract was awarded as a result of the RMVS project. \nRMVS CANs\nExisting CANs relating to the RMVS project are 2020/S 100-243206, 2020/S 167-406004 and 2021/S 002-003456 (RMVS CANs).\nDue to the need to  respond rapidly to the emerging situation, some design work, testing, developing and manufacturing was undertaken before a formalised contract with known costs and outputs was put in place between Cabinet Office and those RMVS suppliers at the time of the RMVS CANs.\nInstead Cabinet Office gave commitments to those RMVS suppliers to enable those suppliers to support the RMVS project at significant pace and to mitigate those suppliers operating entirely at risk during extremely turbulent and changing circumstances. The RMVS CANs reflected the estimated values as best known at the time and cost caps within which suppliers were operating. \nAt the time of the RMVS CANs, in order to be as transparent as possible with the market, information available at the time of entering into those commitments was provided, notwithstanding that it was expected to take several months to settle on the final output and resulting contracts. \nThe RMVS CANs were therefore published to notify the market of the estimated and maximum limits of the commitments Cabinet Office had entered into to support the RMVS project. Where a supplier appears on more than one RMVS CAN, this reflects an increase to the estimate or cost cap previously notified to the market. \nThis contract is the Ventilator Challenge: Provision of Rapid Manufacture Ventilator Systems (RMVS) resulting from the support by T.J.Smith and Nephew Ltd to the RMVS project and which is the output of T.J.Smith and Nephew Ltd appearing on 2020/S 167-406004 of the RMVS CANs.",
    "classification": {
      "id": "33170000",
      "scheme": "CPV",
      "description": "Anaesthesia and resuscitation"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "goods",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "The COVID-19 outbreak is a Public Health Emergency of International Concern as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised COVID-19 as a pandemic on 11 March 2020. The use of ventilator equipment is critical in treating patients with COVID-19 to take over the body’s breathing process when the disease has caused the lungs to fail and allow the patient time to fight off the infection and recover.\nIn March the NHS across the UK had access to approximately 8,000 ventilators. Modelling based the trajectory of other European countries forecast the need for significant and extremely rapid increase in the UK ventilator capacity. The Prime Minister set the ambition on 16 March 2020 for industry to manufacture as many new ventilators as possible, recognising that coronavirus is the biggest threat this country had seen for decades and that we faced a moment of national emergency. Significant quantities of extra ventilators would be required to treat seriously ill patients during the first wave of infections. Similar shortfalls in ventilator stocks were identified globally. Pressure to increase manufacturing capacity of ventilators was immense, requiring novel designs and new supply chains to be rapidly created to meet that demand. In these circumstances a procurement following the usual timescales under the PCR 2015, including accelerated options, was impossible. Ventilator manufacturers and supply chains were under immediate and unprecedented global pressure to provide products. A delay in engaging with the market by running a usual procurement process ran the risk of failing to acquire the necessary stock of ventilator equipment and presenting a significant risk to life. \nCabinet Office is satisfied the tests permitting use of the Negotiated procedure without prior publication (Regulation 32(2)(c)) are met:\n1. As far as is strictly necessary: The Ventilator Challenge was identified as strictly necessary to meet anticipated demand on the NHS during the first wave of cases in the UK. \n2. There are genuine reasons for extreme urgency: It is responding to COVID-19 immediately because of public health risks presenting a genuine emergency.\n3. The events that have led to the need for extreme urgency were unforeseeable: The Commission itself confirmed: “The current coronavirus crisis presents an extreme and unforeseeable urgency – precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.” (Commissioner Breton, Internal Market, 01.04.2020). \n4. It is impossible to comply with the usual timescales in the PCR: There was no time to run an accelerated procurement under the open, restricted or competitive procedures with negotiation that would allow it to secure delivery of products, particularly in light of the corresponding delays to timelines associated with securing increased manufacturing capacity and component supply within the required timescales. \n5. The situation is not attributable to the contracting authority: It has not done anything to cause or contribute to the need for extreme urgency.",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-76307",
      "name": "Minister for the Cabinet Office Acting through Crown Commercial Service",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UK",
        "locality": "Liverpool",
        "postalCode": "L3 9PP",
        "countryName": "United Kingdom",
        "streetAddress": "The Capital Building, Old Hall Street"
      },
      "details": {
        "url": "https://www.gov.uk/ccs",
        "classifications": [
          {
            "id": "MINISTRY",
            "scheme": "TED_CA_TYPE",
            "description": "Ministry or any other national or federal authority, including their regional or local subdivisions"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Minister for the Cabinet Office Acting through Crown Commercial Service"
      },
      "contactPoint": {
        "email": "cco@cabinetoffice.gov.uk",
        "telephone": "+44 08009981098"
      }
    },
    {
      "id": "GB-FTS-76351",
      "name": "T.J.Smith and Nephew Ltd",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Watford",
        "postalCode": "WD18 8YE",
        "countryName": "United Kingdom",
        "streetAddress": "Building 5 Hatters Lane"
      },
      "details": {
        "url": "https://www.smith-nephew.com/uk/",
        "scale": "large"
      },
      "identifier": {
        "legalName": "T.J.Smith and Nephew Ltd"
      }
    },
    {
      "id": "GB-FTS-46789",
      "name": "The Minister for the Cabinet Office acting through Crown Commercial Service",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Liverpool",
        "postalCode": "L3 9PP",
        "countryName": "United Kingdom",
        "streetAddress": "The Capital, Old Hall Street"
      },
      "details": {
        "url": "https://www.gov.uk/ccs"
      },
      "identifier": {
        "legalName": "The Minister for the Cabinet Office acting through Crown Commercial Service"
      },
      "contactPoint": {
        "email": "cco@cabinetoffice.gov.uk",
        "telephone": "+44 08009981098"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "005855-2023-1",
      "title": "Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator",
      "value": {
        "amount": 6608650.55,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "005855-2023-1",
      "dateSigned": "2020-07-13T00:00:00+01:00"
    }
  ],
  "description": "Link to Contracts Finder notice: https://www.contractsfinder.service.gov.uk/Notice/445e70d6-7692-4ccf-932c-be50f7e8db11",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
28 Feb 2023 · 005855-2023 · award, contract
{
  "id": "005855-2023",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 1,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "2",
        "value": 1,
        "measure": "electronicBids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2023-02-28T14:03:03Z",
  "ocid": "ocds-h6vhtk-03acde",
  "buyer": {
    "id": "GB-FTS-76307",
    "name": "Minister for the Cabinet Office Acting through Crown Commercial Service"
  },
  "links": [
    {
      "rel": "prev",
      "href": "https://ted.europa.eu/udl?uri=TED:NOTICE:406004-2020:TEXT:EN:HTML"
    }
  ],
  "awards": [
    {
      "id": "005855-2023-1",
      "title": "Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-76351",
          "name": "T.J.Smith and Nephew Ltd"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-03acde",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "The ‘Rapid Manufacture Ventilator Systems (RMVS) programme’ is a workstream within the ventilator challenge progressing novel and modified designs for ventilator devices, manufactured on a rapid basis to ensure sufficient capacity within the NHS.\nCabinet Office, who are running the RMVS programme on behalf of the UK government, engaged with a wide range of suppliers, including designers, manufacturers and component suppliers, to progress a number of ventilator models (by taking forward existing designs through licencing agreements and by developing new products based on existing products and based on new original designs) resulting in the manufacturer of ventilators to meet the identified need.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Quality",
              "type": "quality",
              "description": "100"
            },
            {
              "type": "price",
              "description": "0"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ]
      }
    ],
    "title": "Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The ‘Ventilator Challenge’ was created by the UK government and delivered across several government departments (Department of Health and Social Care, Cabinet Office and Ministry of Defence) as part of the drive to increase ventilator supply and support the UK National Health Service (NHS) in its response to the Coronavirus disease global pandemic (Covid-19).\nIn March 2020, the Prime Minister called on manufacturers to help the UK to step up production of ventilators to support the UK’s response to the virus and save lives. This included working on new or adapted ventilator designs, as well the Government's work to buy ventilators from abroad.\nA contract award Notice was published on 25 May 2020 (reference 2020/S 100-243206) covering contracts awarded pursuant to the RMVS programme. This is a second contract award notice that covers contracts awarded thereafter.\nThis contract was awarded as a result of the RMVS project. \nRMVS CANs\nExisting CANs relating to the RMVS project are 2020/S 100-243206, 2020/S 167-406004 and 2021/S 002-003456 (RMVS CANs).\nDue to the need to  respond rapidly to the emerging situation, some design work, testing, developing and manufacturing was undertaken before a formalised contract with known costs and outputs was put in place between Cabinet Office and those RMVS suppliers at the time of the RMVS CANs.\nInstead Cabinet Office gave commitments to those RMVS suppliers to enable those suppliers to support the RMVS project at significant pace and to mitigate those suppliers operating entirely at risk during extremely turbulent and changing circumstances. The RMVS CANs reflected the estimated values as best known at the time and cost caps within which suppliers were operating. \nAt the time of the RMVS CANs, in order to be as transparent as possible with the market, information available at the time of entering into those commitments was provided, notwithstanding that it was expected to take several months to settle on the final output and resulting contracts. \nThe RMVS CANs were therefore published to notify the market of the estimated and maximum limits of the commitments Cabinet Office had entered into to support the RMVS project. Where a supplier appears on more than one RMVS CAN, this reflects an increase to the estimate or cost cap previously notified to the market. \nThis contract is the Ventilator Challenge: Provision of Rapid Manufacture Ventilator Systems (RMVS) resulting from the support by T.J.Smith and Nephew Ltd to the RMVS project and which is the output of T.J.Smith and Nephew Ltd appearing on 2020/S 167-406004 of the RMVS CANs.",
    "classification": {
      "id": "33170000",
      "scheme": "CPV",
      "description": "Anaesthesia and resuscitation"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "goods",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "The COVID-19 outbreak is a Public Health Emergency of International Concern as declared by the World Health Organisation on 30 January 2020. The WHO Director General characterised COVID-19 as a pandemic on 11 March 2020. The use of ventilator equipment is critical in treating patients with COVID-19 to take over the body’s breathing process when the disease has caused the lungs to fail and allow the patient time to fight off the infection and recover.\nIn March the NHS across the UK had access to approximately 8,000 ventilators. Modelling based the trajectory of other European countries forecast the need for significant and extremely rapid increase in the UK ventilator capacity. The Prime Minister set the ambition on 16 March 2020 for industry to manufacture as many new ventilators as possible, recognising that coronavirus is the biggest threat this country had seen for decades and that we faced a moment of national emergency. Significant quantities of extra ventilators would be required to treat seriously ill patients during the first wave of infections. Similar shortfalls in ventilator stocks were identified globally. Pressure to increase manufacturing capacity of ventilators was immense, requiring novel designs and new supply chains to be rapidly created to meet that demand. In these circumstances a procurement following the usual timescales under the PCR 2015, including accelerated options, was impossible. Ventilator manufacturers and supply chains were under immediate and unprecedented global pressure to provide products. A delay in engaging with the market by running a usual procurement process ran the risk of failing to acquire the necessary stock of ventilator equipment and presenting a significant risk to life. \nCabinet Office is satisfied the tests permitting use of the Negotiated procedure without prior publication (Regulation 32(2)(c)) are met:\n1. As far as is strictly necessary: The Ventilator Challenge was identified as strictly necessary to meet anticipated demand on the NHS during the first wave of cases in the UK. \n2. There are genuine reasons for extreme urgency: It is responding to COVID-19 immediately because of public health risks presenting a genuine emergency.\n3. The events that have led to the need for extreme urgency were unforeseeable: The Commission itself confirmed: “The current coronavirus crisis presents an extreme and unforeseeable urgency – precisely for such a situation our European rules enable public buyers to buy within a matter of days, even hours, if necessary.” (Commissioner Breton, Internal Market, 01.04.2020). \n4. It is impossible to comply with the usual timescales in the PCR: There was no time to run an accelerated procurement under the open, restricted or competitive procedures with negotiation that would allow it to secure delivery of products, particularly in light of the corresponding delays to timelines associated with securing increased manufacturing capacity and component supply within the required timescales. \n5. The situation is not attributable to the contracting authority: It has not done anything to cause or contribute to the need for extreme urgency.",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-76307",
      "name": "Minister for the Cabinet Office Acting through Crown Commercial Service",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UK",
        "locality": "Liverpool",
        "postalCode": "L3 9PP",
        "countryName": "United Kingdom",
        "streetAddress": "The Capital Building, Old Hall Street"
      },
      "details": {
        "url": "https://www.gov.uk/ccs",
        "classifications": [
          {
            "id": "MINISTRY",
            "scheme": "TED_CA_TYPE",
            "description": "Ministry or any other national or federal authority, including their regional or local subdivisions"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Minister for the Cabinet Office Acting through Crown Commercial Service"
      },
      "contactPoint": {
        "email": "cco@cabinetoffice.gov.uk",
        "telephone": "+44 08009981098"
      }
    },
    {
      "id": "GB-FTS-76351",
      "name": "T.J.Smith and Nephew Ltd",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "Watford",
        "postalCode": "WD18 8YE",
        "countryName": "United Kingdom",
        "streetAddress": "Building 5 Hatters Lane"
      },
      "details": {
        "url": "https://www.smith-nephew.com/uk/",
        "scale": "large"
      },
      "identifier": {
        "legalName": "T.J.Smith and Nephew Ltd"
      }
    },
    {
      "id": "GB-FTS-46789",
      "name": "The Minister for the Cabinet Office acting through Crown Commercial Service",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Liverpool",
        "postalCode": "L3 9PP",
        "countryName": "United Kingdom",
        "streetAddress": "The Capital, Old Hall Street"
      },
      "details": {
        "url": "https://www.gov.uk/ccs"
      },
      "identifier": {
        "legalName": "The Minister for the Cabinet Office acting through Crown Commercial Service"
      },
      "contactPoint": {
        "email": "cco@cabinetoffice.gov.uk",
        "telephone": "+44 08009981098"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "005855-2023-1",
      "title": "Ventilator Challenge: Consultancy Work and materials to Develop the OxVent Ventilator",
      "value": {
        "amount": 6608650.55,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "005855-2023-1",
      "dateSigned": "2020-07-13T00:00:00+01:00"
    }
  ],
  "description": "Link to Contracts Finder notice: https://www.contractsfinder.service.gov.uk/Notice/445e70d6-7692-4ccf-932c-be50f7e8db11",
  "initiationType": "tender"
}