Official UK procurement notice
University of East Anglia Contractor Framework
Authority: University of East Anglia (Education)
What is being bought3 lots · detail below
Published requirement descriptionThe University of East Anglia (UEA) has appointed Principal Contractors to carry out construction and refurbishment works over the duration of the Framework.
The Framework consists of three lots based on the value of the proposed works contracts:
Lot 1 - Mid Works >£1m to ≤£5m
Lot 2 - Minor Works £0k to ≤£1m
Lot 3 - Mechanical and Electrical Works £0k to ≤£900k
The UEA has established the framework so that it has a pool of contractors from whom it can call-off directly or seek tenders (via mini-competitions) for specific projects as they arise.
This will not necessarily guarantee a contractor work during the 3-year life-time (note there is an option for the University to extend the Framework by up to 2 years but this is at the sole
discretion of UEA) of the Framework; neither will UEA be restricted exclusively to using Contractors from the Framework.
CPV: Construction work
How this framework works
From the published notice- Places
- up to 9 suppliers · 4 bids on the busiest of 3 lots (0.4 per place) · 7 appointed
Lots and requirements (3)Procurement structure
3 lots · all with a published value · a supplier may bid for at most 2 and win at most 2 of themLot #1Mid WorksAwardedPublished value£33,500,000
This Lot is for works with a construction value of >£1m to ≤£5m GBP. Estimated spend on this Lot over a 5 year framework period is anticipated to be 8 500 000 GBP to 33 500 000
GBP. The UEA does not bind itself in any way to this expenditure nor to procuring the listed works from this Framework. The Framework will be for a period of three (3) years with an
option for an extension for up to an additional two (2) years (which will be at the discretion of the UEA). In addition to the UEA, The
Norfolk and Norwich University Hospital (NNUH) will have the option to use the Framework.
Lot #2Minor WorksAwardedPublished value£45,750,000
This Lot is for works with a construction value of £0k to ≤£1m GBP. Estimated spend on this
Lot over a 5 year framework period is anticipated to be 10 500 000 GBP to 45 750 000 GBP.
The UEA does not bind itself in any way to this expenditure nor to procuring the listed works from this Framework. The Framework will be for a period of three (3) years with an option for an extension for up to an additional two (2) years (which will be at the discretion of the UEA).
In addition to the UEA, The Norfolk and Norwich University Hospital (NNUH) will have the option to use the Framework.
Lot #3Mechanical and Electrical WorksAwardedPublished value£17,000,000
This Lot is for mechanical and electrical works with a construction value of £0k to ≤£900kGBP. Estimated spend on this Lot over a 5 year framework period is anticipated to be
up to 17 000 000 GBP. The UEA does not bind itself in any way to this expenditure nor to procuring the listed works from this Framework. The Framework will be for a period of three
(3) years with an option for an extension for up to an additional two (2) years (which will be at the discretion of the UEA). In
addition to the UEA, The Norfolk and Norwich University Hospital (NNUH) will have the option to use the Framework.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “University of East Anglia Contractor Framework” is a framework: the contest is a place on its panel, up to 9 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 27 Nov 2023, 14:47 GMT
- Last source update
- 13 Jun 2024, 12:33 BST
- Authority reference
PURCON1090- FTS notice number
2024/S 000-018314- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-041d07Find a Tender
- Electronic trading
- e-invoicing allowed
Publisher note: This procurement was conducted via In-Tend, our e-tendering portal.
How it was run
Official notice- Appointment period ends
- 12 Jan 2024, 12:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 120 days from the deadline
Timeline
12 Jan 2024 → 13 Jun 2024 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown12 Jan 2024, 12:00 GMT
- Invitations to tender expected1 Feb 2024
- Notice published13 Jun 2024, 12:33 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete13 Jun 2024, 12:33 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast8 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 3 of these contracts carry the same published figure, £45,750,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Contract 018314-2024-1
- Signed
- 3 Jun 2024
- Value
- £33,500,000
- Status
- active
Contract 018314-2024-2
- Signed
- 3 Jun 2024
- Value
- £33,500,000
- Status
- active
Contract 018314-2024-3
- Signed
- 3 Jun 2024
- Value
- £33,500,000
- Status
- active
Contract 018314-2024-4
- Signed
- 3 Jun 2024
- Value
- ceiling above
- Status
- active
Contract 018314-2024-5
- Signed
- 3 Jun 2024
- Value
- ceiling above
- Status
- active
Contract 018314-2024-6
- Signed
- 3 Jun 2024
- Value
- ceiling above
- Status
- active
Contract 018314-2024-7
- Signed
- 3 Jun 2024
- Value
- £17,000,000
- Status
- active
Contract 018314-2024-8
- Signed
- 3 Jun 2024
- Value
- £17,000,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Mid Works | 4bids | — | — | — |
| 2 · Minor Works | 4bids | — | — | — |
| 3 · Mechanical and Electrical Works | 2bids | — | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High Court of England and WalesReview body
Framework contractors & participating bidders
8 commercial parties on the notice- Cocksedge Buildings Contractors LimitedFramework contractor
- Eastern Power Systems LtdFramework contractor
- Empower Services LimitedFramework contractor
- MJS Projects (March) LimitedFramework contractor
- MJS Projects (March) LtdFramework contractor
- NCL Contractors LtdFramework contractor
- Pentaco Construction LtdFramework contractor
- R G Carter LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria