Find a Tender
cancelled
Official procurement procedure
Transport for Wales Rail Mk4 Rebranding
Railway engineering services
UK
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Transport for Wales Rail Limited (Utility Buyer): "Transport for Wales Rail Mk4 Rebranding". Published status: cancelled. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Transport for Wales Rail Limited (Utility Buyer) | Scope & Categories | Not published | Submission Window | cancelled No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Transport for Wales Rail Limited (Utility Buyer)
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Transport for Wales Rail Limited (Utility Buyer). These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
2.1Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 21 active published awards; 9 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityTransport for Wales Rail Limited (Utility Buyer) | Procedure methodNot published | Procurement categoryNot published |
Statuscancelled | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published25 Jul 2023, 11:19 BST | Last source update25 Jul 2023, 11:19 BST | Recurring procurementNot published |
ClassificationRailway engineering services | ||
Delivery area UK | ||
OCIDocds-h6vhtk-036ab6 | ||
What is being bought
The Mk-4 Rolling Stock is a mixture of passenger and driver trailer vehicles. TfWR has purchased the following types:
- Tourist Open End (TOE);
- Tourist Open (TO);
- Tourist Open Disabled (TOD);
- Service Vehicle (SV);
- Premium Open Disabled (POD); and
- Driver Van Trailer (DVT).
The rolling stock was purchased in two (2) tranches:
- Tranche 1 – most recently operated by LNER; and
- Tranche 2 – most recently operated by Grand Central.
The Mk 4 vehicles have been formed into rakes consisting of one of each type of vehicle together with a Class 67 Vehicle.
The current livery of the combined fleet will be mixed and not instantly recognisable as TfWR operated trains. There are also issues with compliance of the Grand Central fleet with regards to PRM regulations.
In addition to this the LNER vehicles are vinyl wrapped and are already showing signs of aging with a dull appearance, blemishes and breaks in the vinyl.
To address the brand identity and PRM issues TfWR contracted DG8, a rail industrial design consultancy, to facilitate and produce concepts, designs and costings based upon the working groups requirements and compliance with industry standards.
The current re-branding exclude the Class 67 locomotive that is used to haul the Mk-4 Rolling Stock.
TfWR are now seeking a supplier or suppliers that can provide the services stated in the RfP.
What changed
From the official release history
- Status changed to cancelled
25 Jul 2023, 11:19 BST - Official notice release published
25 Jul 2023, 11:19 BST - Status changed to published status
12 Oct 2022, 12:38 BST - Official notice release published
12 Oct 2022, 12:38 BST - Submission deadline changed to published date
12 Oct 2022, 12:38 BST - Status changed to active
22 Sept 2022, 16:53 BST - Official notice release published
22 Sept 2022, 16:53 BST - Submission deadline changed to 13 Oct 2022, 17:00 BST
22 Sept 2022, 16:53 BST - Buyer information updated
22 Sept 2022, 16:53 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedThe Mk-4 Rolling Stock is a mixture of passenger and driver trailer vehicles that were originally built in 1989 by Metro-Cammell as part of the IC225 fleet operated on the East Coast Mainline. TfWR has purchased the following types: - Tourist Open End - (TOE); - Tourist Open - (TO); - Tourist Open Disabled - (TOD); - Service Vehicle - (SV); - Premium Open Disabled – (POD); and - Driver Van Trailer (DVT). The rolling stock was purchased in two (2) tranches: - Tranche 1 – most recently operated by LNER; and - Tranche 2 – most recently operated by Grand Central. The Mk 4 vehicles have been formed into rakes consisting of one of each type of vehicle together with a Class 67 Vehicle. Branding and PRM Compliance The current livery of the combined fleet will be mixed and not instantly recognisable as TfWR operated trains. There are also issues with compliance of the Grand Central fleet with regards to PRM regulations. In addition to this the LNER vehicles are vinyl wrapped and are already showing signs of aging with a dull appearance, blemishes and breaks in the vinyl. To address the brand identity and PRM issues TfWR contracted DG8, a rail industrial design consultancy, to facilitate and produce concepts, designs and costings based upon the working groups requirements and compliance with industry standards. The current re-branding exclude the Class 67 locomotive that is used to haul the Mk-4 Rolling Stock.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
25 Jul 2023, 11:19 BST - Award unsuccessful
Not published · Not published
Commercial outcome and competition
Awards Awarded supplier not published Not published · Not published · unsuccessful |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Transport for Wales Rail Limited (Utility Buyer)
Contracting authority GB-FTS-12368Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published