Official UK procurement notice
Toilet Demolition, Design and Rebuild
Authority: Wareham Town Council (Local council)
What is being bought
Published requirement descriptionWareham Town Council invites tenders from experienced and qualified contractors for the demolition, design, and construction of the public toilets located in Howard's Lane, Wareham, BH20 4HU.
This project must meet the Council's requirements for modern
public amenities, be sensitive to the historic character of the area, and include pay-to use functionality, as well as disability-friendly provisions.
The contract value for this project is £140,000, inclusive of all works, in accordance with UK public procurement legislation and the Public Contracts Regulations 2015, which govern this tender process.
CPV: Construction work
The lotProcurement structure
single lot · value publishedLot #1SCOPE OF WORKPublished value£140,000
SCOPE OF WORK
Demolition Works
- Safe demolition and removal of the existing public toilet structure.
- Disposal of all waste materials in accordance with environmental and regulatory standards.
- Ensuring practicable measures to minimise disruption to the surrounding area and residents during demolition.
- Ensuring and arranging cap off work for utilities on site for the required duration.
3.2 Potential for Rectification of Structural Integrity Issues
Wareham Town Council will also consider tenders proposing works which will rectify existing structural integrity issues within the building such as rising damp in place of a demolition.
Should the tender proposal rectify the building's structural integrity issues, the redesign of the facilities within the building must still be in-keeping with the Council's vision for the facility outlined below.
Design Requirements
- Architectural Design: The new toilet block must reflect the character and heritage of the Wareham Conservation Area. The design must incorporate traditional materials (e.g., brick, stone, timber) and be sensitive to the heritage of the area, as outlined in the Wareham Neighbourhood Plan.
Functional Layout: The facility must be well-planned to offer:
- Unisex, self-contained toilet facilities integrated with accessibility features such as wide doorways, grab rails, and accessible cubicles.
- A pay-to-use entry system, designed to ensure ease of use for all visitors, including those with disabilities.
- Baby changing facilities in all sections.
- Durable fixtures and fittings that are vandal-resistant and easy to clean.
Pay-to-Use System: A pay-to-use entry mechanism must be installed. This system should:
- Be modern and robust allowing contactless payments (e.g., via card or mobile payment).
- Be fully accessible for individuals with disabilities.
- Include appropriate signage and user instructions.
Sustainability and Accessibility: The facility should be energy and water efficient, incorporating low-flush toilets, sensor-activated lighting, and eco-friendly materials where practicable, cost-effective and in keeping with planning requirements. The toilets
must comply with UK building regulations, including Part M (Access to and Use of Buildings), and should ideally avoid the need for a separate disabled cubicle by incorporating accessibility into the main male and female sections.
Construction Works
- Construction of the toilet block in line with approved designs and compliance with all relevant building regulations.
- Installation of utilities (water, drainage, electricity), the pay-to-use system, and fixtures.
- External landscaping, if required, to integrate the building within its surroundings.
- Ensuring the safety of the site throughout construction and minimising disruption to the public.
Health and Safety
The contractor must submit a detailed Health and Safety Plan covering both the demolition and construction phases of the project. This plan must include:
- Measures for ensuring worker and public safety on and around the site.
- Compliance with the Construction (Design and Management) Regulations 2015 (CDM Regulations) and provision of a Construction Phase Plan to be approved by the Town Council prior to work commencing on-site.
Planning Permission and Building Regulations
The successful contractor will be responsible for ensuring that all works comply with the planning permissions and building regulations applicable to the project. The design
and construction must adhere to:
The Wareham Neighbourhood Plan and guidelines for the Wareham Conservation Area.
- Relevant sections of the Town and Country Planning Act 1990.
- UK Building Regulations, particularly Part M (Access to and Use of Buildings) and any additional local conservation requirements.
The contractor carries the onus and final responsibility for securing planning and any other required permissions.
Sustainability and Accessibility The design and construction of the new public toilets must promote environmental sustainability and full accessibility for all users. In line with best practices, the contractor must:
- Utilise eco-friendly materials and construction methods, including the use of recycled materials where feasible and low VOC paints.
- Wareham Town Council favours designs and constructions which incorporate or include sustainable energy generation features such as solar panels, photovoltaic equipment, etc.
- Incorporate energy-efficient technologies, such as low-flush toilets, sensor activated lighting, and other water- and energy-saving devices.
- Ensure compliance with Part M of the Building Regulations, providing wide doorways, grab rails, and accessible cubicles integrated within the male and female facilities. Tactile signage should be installed for visually impaired users.
These sustainability and accessibility features should be clearly outlined in the contractor's design proposal and will be a key evaluation criterion.
Defects Liability Period
The successful contractor will be required to provide a Defects Liability Period of 12 months from the date of practical completion of the works. During this period, the contractor shall be responsible for rectifying any defects or faults arising from the
construction at their own cost.
Retention
The retention amount to be held over the Rectification Period will be 2.5% of the contract sum. Subject to the satisfactory remedying of all defects the retention will be released to the contractor at the expiry of the Rectification Period which shall be
mutatis mutandis the Due Date for Payment.
Defects Correction
During the Defects Liability Period, any defects identified must be corrected by the contractor within a reasonable timeframe, not exceeding 14 days from notification. Persistent failure to correct defects may result in the council seeking remedial action at
the contractor's expense.
Warranties and Guarantees
The contractor shall provide a minimum two-year warra…
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 18 Oct 2024, 16:51 BST
- Last source update
- 18 Oct 2024, 16:51 BST
- Award evaluation window
- 5 Feb 2025 – …
- FTS notice number
2024/S 000-033839- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04af47Find a Tender
How it was run
Official notice- Submission deadline
- 31 Jan 2025, 23:59 GMT
- Submission channel
- {"written"}
- Accepted languages
- en
- Bids opened
- 5 Feb 2025, 10:00 GMT
Timeline
18 Oct 2024 → 31 Mar 2025 · 4 dates- Notice published18 Oct 2024, 16:51 BST
- Submission deadline31 Jan 2025, 23:59 GMT
- Bids opened5 Feb 2025, 10:00 GMT
- Contract starts31 Mar 2025, 00:00 BST
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.