Find a TenderPlanned procurementPreliminary market engagement notice
Published 27 Jan 2026, 12:06 GMT

Official UK procurement notice

Thermal Buffer Technology · UK public procurement notice

Authority: UK Fusion Energy Ltd (Public body)

ServicesAbove threshold
Planned pipeline value£0pipeline notice, not a live tender
Tender notice expected Date not publishedfrom the planned procurement notice
Contract term 4 yrsends 31 Mar 2033 · starts 1 Apr 2029

What is being bought

Published requirement description

The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification.

UKIFS is seeking experts to support the design and development of a thermal storage system that integrates with the STEP power cycle. While the power cycle is designed to efficiently integrate heat from the tokamak device during a high power steady state scenario, the power cycle and cooling systems must also be highly flexible to adapt to uncertain prototypic operations e.g. the systems must have the ability to switch on and off and ramp up and down at the start and end of operational periods. Significant thermal power will be generated from the tokamak device during the ‘rapid density rise phase’ of the reactor plasma ramp up, lasting a few minutes. This is an effective ramp of 2GWth generated from the tokamak during these few minutes.

To manage this very immediate and sudden generation of heat from the tokamak, a minimum amount of thermal storage will be needed to increase the thermal inertia of the primary coolant loops, allowing the power cycle to ramp up to 100% load in a timely manner. Further, thermal storage may be needed to enable partial operation of the power cycle during the transition between the initial pre-heat to part load operational period.

The thermal storage system will be expected to extract heat from a hot CO2 primary coolant during the ramp up phase and deliver heat back to the CO2 primary coolant (or to a separate secondary working fluid) during the ramp down phase. The proposed technical operating conditions of the thermal storage system and load requirements are:

-CO2 primary coolant operating pressure: 50 to 150 bar.

-CO2 primary coolant operating temperature: 550°C to 650°C.

-Thermal duty in the region of 800MW.

-Required energy storage of 150MWh.

-Required fast ramping duration in a few minutes.

Systems of interest & key words:

-Thermal energy storage

-Latent heat storage

-Sensible heat storage

-Thermochemical heat storage

-Thermal battery

-Molten salt storage systems

-Molten salt heat exchangers/ steam generators

-Phase change materials

-Metallic phase change materials

-Solid state energy storage

-Packed bed storage

-Concrete battery

-Sand battery

Please note that the CPV codes given in this notice have now been corrected.

To view this notice, please click here:

ukifs.delta-esourcing.com/delta/viewNotice.html ↗

CPV: Construction works for power plants and heating plants · Design and execution of research and development · Thermal power plant construction work

The lotProcurement structure

single lot · no lot value published

Pipeline intelligence · planning stage: how this market runs before the tender is published

How UK Fusion Energy Ltd buys Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry (CPV 4525), and who usually turns up

UK Fusion Energy Ltd’s own published record, next to the published market for the same work. Frameworks and DPS are kept out: they attract a different number of bids. Whole-market view: Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry (CPV 4525) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 12 of 42 known-size awards · market: CPV 4525 · South East England (authority’s region), n=6
29%33%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means registered in South East England (authority’s region).

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 11 of 17 known-location awards · market: CPV 4525 · South East England (authority’s region), n=13
65%38%

Most of this buyer’s recorded winners are registered in South East England.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 25 decided notices · market: CPV 4525 · UK-wide, n=18
26 days37 days

Half of these awards were announced within 26 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

Both shares are minimums: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: at least 37 of 66 procurements with awards had no recorded rival · market: CPV 4525 · South East England (authority’s region), n=16
56%63%

Direct awards or one recorded bid are common here. Check the route before spending time on a bid.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer21 lots with bid counts · all categories
10% had one bid
The market20 lots with bid counts · CPV 4525 · UK-wide
10% had one bid
Buyer / market · select a colour for counts
1 bid10% / 10%
Buyer: 2 of 21 lots with published bid counts. Market: 2 of 20 lots with published bid counts.
2–357% / 20%
Buyer: 12 of 21 lots with published bid counts. Market: 4 of 20 lots with published bid counts.
4–610% / 50%
Buyer: 2 of 21 lots with published bid counts. Market: 10 of 20 lots with published bid counts.
7+24% / 20%
Buyer: 5 of 21 lots with published bid counts. Market: 4 of 20 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

Past prices are a guide, not a bid price.

Last 36 months.

This buyer20 lots with estimate and award · all categories
30% below estimate
The market11 lots with estimate and award · CPV 4525 · UK-wide
55% below estimate
Buyer / market · select a colour for counts
Below estimate30% / 55%
Buyer: 6 of 20 lots with an estimate and award. Market: 6 of 11 lots with an estimate and award.
Within ±2%65% / 27%
Buyer: 13 of 20 lots with an estimate and award. Market: 3 of 11 lots with an estimate and award.
Above estimate5% / 18%
Buyer: 1 of 20 lots with an estimate and award. Market: 2 of 11 lots with an estimate and award.
2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 452548 monthsNo real estimate
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 311 past lots.

A forecast, not a list of bidders.

—No model forecast yet12% single-bid risk
Past bids on 311 similar lots
1 bid12%
37 of 311 similar past lots received 1 bid (12%).
2–324%
75 of 311 similar past lots received 2–3 (24%).
4–628%
86 of 311 similar past lots received 4–6 (28%).
7+36%
113 of 311 similar past lots received 7+ (36%).
Comparable past lots usually drew 5 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—No real estimate
The buyer published £0 as the estimate (a placeholder, not the contract’s value), so there is nothing to forecast against.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
27 Jan 2026, 12:06 GMT
Last source update
28 Jan 2026, 10:05 GMT
Authority reference
PP-UKIFS-529
FTS notice number
2026/S 000-007421
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Construction works for power plants and heating plantsDesign and execution of research and developmentThermal power plant construction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-060f8f Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

27 Jan 2026 → 1 Apr 2029 · 3 dates
  1. Planning notice published266 days ago
    27 Jan 2026, 12:06 GMT
  2. Market engagement206 days ago
    27 Mar 2026, 23:59 GMT

    To participate in this exercise, please complete and submit Appendix 1: Questionnaire and return any documents via the Delta portal. We are conscious of your time (and grateful to you for taking the time to complete the questionnaire), therefore we suggest you limit your responses to a maximum of 5 pages. If there are any areas you would like to expand on, please add a note to the relevant section for future discussion.

    If you experience any difficulties with the portal, please contact the portal helpdesk [email protected] cc [email protected]

    Information obtained from responses to Appendix 1: Questionnaire will help UKIFS understand current market capabilities and may shape the scope, direction, and design of the future procurement activities.

    If you have any questions about this Preliminary Market Engagement, please contact UKIFS through the Delta portal. We are keen to engage with suppliers to assist with the questionnaire if needed, to ensure quality responses enabling us to shape the future requirement and procurement.

    Following the submission and review of questionnaires, UKIFS intends to run an online conference call meeting/seminar/Q&A. The closing date for the pre-market engagement is Friday 27th March 2026, 1 pm.

    Please note the CPV codes in this notice are now correct.

  3. Today
    20 Oct 2026
  4. Contract starts
    1 Apr 2029, 00:00 BST

Notice history

2 events · 2 releases on Find a Tender · since 27 Jan 2026
  1. Preliminary market engagement notice published
    27 Jan 2026, 12:06 GMT
    UK2
  2. Preliminary market engagement notice published
    28 Jan 2026, 10:05 GMT
    UK2

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

United Kingdom Industrial Fusion Solutions

Contracting authorityPublic undertaking GB-PPON: PCRM-7973-DCBL Culham Science Centre, Abingdon, Culham, South East, OX14 3DBContact name, email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure