Find a Tender
active
Official procurement procedure
Terminal and Amenities Building Expansion
Building construction work
Construction work
Published value
Not published
Submission deadline 26 Jul 2022, 23:59 BST
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: London Gateway Port Limited: "Terminal and Amenities Building Expansion". Published status: active. Published value: Value not published. 1 published lot. Recorded submission deadline: 26 Jul 2022, 23:59 BST. See the official notice for participation instructions.
| Contracting Authority | London Gateway Port Limited | Scope & Categories | Not published | Submission Window | Closed 26 Jul 2022, 23:59 BST |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: London Gateway Port Limited
Market Analytics
Derived from OCDS awards & bid statistics
Published history for London Gateway Port Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 0 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityLondon Gateway Port Limited | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published20 Jun 2022, 16:06 BST | Last source update20 Jun 2022, 16:06 BST | Recurring procurementNo |
ClassificationBuilding construction work, Construction work | ||
Delivery area | ||
OCIDocds-h6vhtk-03487b | ||
What is being bought
London Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of “Very Good” under the NC2011 technical standard.
The Terminal Building extension includes but is not limited to
- a four-storey extension of circa total 1,200 sq.m. floor area to office area;
- two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop;
- two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop;
- an overhead crane to the external repair bays;
- an oil storage extension;
- a new grease pit;
- extension of existing climate controlled room;
- modification of existing office areas.
The Amenities Building extension includes but is not limited to
- a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building.
The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.
What changed
From the official release history
- Status changed to active
20 Jun 2022, 16:06 BST - Official notice release published
20 Jun 2022, 16:06 BST - Submission deadline changed to 26 Jul 2022, 23:59 BST
20 Jun 2022, 16:06 BST - Buyer information updated
20 Jun 2022, 16:06 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedactivePublished valueNot publishedLondon Gateway Port Limited is planning to extend the existing Terminal Building and Amenities Building at the Port. The two buildings are located within the operational area of the Port and they shall continue to be occupied and operational during construction stage. Access for people and port vehicles/cranes/equipment to both buildings shall be maintained. The existing Terminal Building (TB) is a steel framed building comprises a four-storey office area located at the centre of the TB. To the north of the TB is a single-storey Internal Mobile Vehicle (IMV) workshop with a two-storey store and to the south is a single-storey Shuttle Carrier (SHC) workshop. The existing Amenities Building (AB) is a three-storey steel framed building that provides toilets, changing rooms/locker facilities, canteen, gym and office. Both of TB and AB have a BREEAM rating of “Very Good” under the NC2011 technical standard. The Terminal Building extension includes but is not limited to - a four-storey extension of circa total 1,200 sq.m. floor area to office area; - two repair bays of one-storey 15m high circa 650 sq.m. floor area to IMV workshop; - two repair bays of one-storey 20m high circa 650 sq.m. floor area to SHC workshop; - an overhead crane to the external repair bays; - an oil storage extension; - a new grease pit; - extension of existing climate controlled room; - modification of existing office areas. The Amenities Building extension includes but is not limited to - a three-storey extension of circa total 600 sq.m. floor area to the east of the Amenities Building. The tentative commencement of site works will be October 2022. The time for completion of the works is 8 months.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
20 Jun 2022, 16:06 BST - Submission deadline
26 Jul 2022, 23:59 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
London Gateway Port Limited
Contracting authority GB-FTS-13225Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published