TEO 2926458 Concept Design and Cost Input Framework to Outline Business Cases

Official notice

Authority: The Executive Office

Framework agreementServicesRestricted procedureSME suitable
Framework ceiling (notional)Value not publishedframework ceiling, not attributable revenue
Awarded 29 Apr 2022

What is being bought

Published requirement description

This commission is for an Integrated Consultant Team (ICT) to provide concept design and cost input services to outline business cases. The services are to be provided in accordance with RIBA Plan of Work 2013, Stages 0-2 only, for a number of proposed Urban Villages Capital projects located in Belfast and Derry/Londonderry. The specific stage input is Stage 0 Strategic Definition, Stage 1 Preparation and Brief and Stage 2 Concept Design, for a number of Urban Villages Initiative projects including various community related building types, parks, public realm environmental schemes, vacant/derelict sites etc. Specific Employer Tasks are provided in the tender documentation Scope of Service Annex A – currently provided in draft for information purposes. The contract will operate for a period of two years with the option for the Employer to extend annually, subject to satisfactory ongoing performance, for a further two periods of one year each up to a maximum of four years.

CPV: Architectural design services · Civil engineering consultancy services

How this framework works

From the published notice
Bids received
13 bids received · 1 suppliers appointed

The lotProcurement structure

single lot · no lot value published

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 30%Price: 70%
Published award criteria (2)
  • Quality: 30
  • Price: 70
What this means for your bid
  • Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
  • “TEO 2926458 Concept Design and Cost Input Framework to Outline…” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Restricted procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Services
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
29 Apr 2022, 14:52 BST
Last source update
29 Apr 2022, 14:52 BST
Authority reference
2926458
FTS notice number
2022/S 000-011180
Classification (CPV)
Architectural design servicesCivil engineering consultancy services
Delivery area
Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-033249 Find a Tender
Review and risk notes
Review procedure

Precise information on deadline(s) for review procedures: This procurement is governed by the Public Contract Regulations 2015 and provides for Economic Operators who have suffered or who risk suffering loss or damage as a consequence of an alleged breach of duty owned in accordance with Regulation 91 to start proceedings in the High Court. A standstill period will commence at the point information on the award of the contract is communicated to tenderers .That notification will provide information on the award decision .The standstill period, which will be for a minimum of 10 calendar days ,provides time for unsuccessful tenderers to challenge the required decision before the contract is entered into. Any proceedings relating to any perceived non-compliance with the relevant law must be started within 30 days, beginning with the date when the Economic Operator first knew or ought to have known that grounds for starting the proceedings had arisen.( A court may extend the time to 3 months where the court considers that there is a good reason for doing so).

Publisher note: CPD, in its capacity as a Central Purchasing Body, is administering this procurement on behalf of the Contracting Authority.. The Contracting Authority expressly reserves the right to award one, some, all or no Lots; . ii. not to award any contract/framework agreement as a result of the procurement process commenced by publication of this notice or to cancel the procurement at any stage;. and. iii. to make whatever changes it may see fit to the content and structure of the tendering competition and in no circumstances will the Authority be liable for any costs incurred by Economic Operators or Candidates. Any expenditure, work or effort undertaken prior to contract award is accordingly at the sole risk of the Economic Operator or Candidate participating in this procurement process. No business whatsoever is guaranteed under any resulting framework agreement or contract, indeed there is no guarantee that any framework agreement or contract will be put in place in relation to this notice. No compensation etc. will be paid if a contract or framework agreement is withdrawn for any reason. Economic Operators should take part in this process only on the basis that they fully understand and accept this position

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 1admitted to the panel · see the list ↓
Bids received 131 from SMEs
Contracts signed 1latest 29 Apr 2022

1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract

    Signed
    29 Apr 2022
    Value
    £90,507
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
13bids · 13 electronic · 1 from abroad1——

Contracting authority & participating public bodies

The Executive Office

Contracting authorityBody governed by public lawGeneral public services Castle Buildings Stormont Estate BELFAST, UK, BT4 3GContact name, email, phone

Dispute resolution & review bodies

  • Department of Finance, Construction Procurement Delivery, Procurement Operations BranchReview body Belfast

Framework contractors & participating bidders

1 commercial party on the notice
  • MCCARTAN MULDOON ARCHITECTS LTDFramework contractor McCartan Muldoon Architects, Studio 1, The Marina Centre, 135A Shore Road, Ballyronan, Magherafelt, UK, BT45 6JAContact email, phone

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.