T322 NIEN Transmission Substation Turnkey (Amended)
Authority: Northern Ireland Electricity Networks Limited (Public body)
What is being bought2 lots · detail below
Published requirement descriptionIt is proposed to establish a Multi-Party Framework which will consist of two lots,
- Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £25 to £100m.
- Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £25m
- The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site.
- NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models.
- The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.
- The authority expects to re-tender this requirement around 31 Jan 2033, 23:59 GMT.
- How the procedure runs: It is intended to procure the Framework Agreement via a multi-stage process. First stage will involve the Conditions of Participation (Pre-Qualification). Suppliers will be required to complete the Pre-Qualification Questionnaire and submit with supporting documentation requested in the Questionnaire. Following an evaluation of the submissions NIE Networks will invite up to six Suppliers for Lot 1 and to six Suppliers for Lot 2. These shortlisted Suppliers will be invited to tender (second stage) and following receipt of tenders NIE Networks at its sole discretion reserves the right to commence negotiations or invite Best and Final Offers (third stage) and the final stage will be establish the framework agreement and award the initial drawdown contracts Ballylumford (lot 1) and Tureagh (lot 2). Full details are available in the Pre-Qualification Instructions.
CPV: Substation construction work
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Places
- up to 6 suppliers · 5 appointed
- Framework period
- 5 yrs · up to 8 yrs from 1 Apr 2026
- Supplier levy on call-offs (max %)
- n/a
Published description of the framework
Minicompetition or direct award
Lots and requirements (2)Procurement structure
2 lots · all with a published value · same conditions of participation on every lot · same evaluation weights on every lotEvery one of these 2 lots carries the same published figure, £362,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Larger scale transmission substationsAwardedRenewalceiling above
The source published no individual description for this lot.
- Economic & financial standing
Specified in the Pre-Qualification Instructions available for downloading
- Technical & professional ability
Specified in the Pre-Qualification Instructions available for downloading
Lot #2Medium Scale SubstationsAwardedRenewalceiling above
The source published no individual description for this lot.
- Economic & financial standing
Specified in the Pre-Qualification Instructions available for downloading
- Technical & professional ability
Specified in the Pre-Qualification Instructions available for downloading
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical: 60%
- Price: 40%
Published award criteria (2)
- Price: NIE Networks envisage that the cost criteria to be used in the assessment of tendered proposals will relate to the following • Project Price • Framework Fee Percentage & Key Rates NIE Networks are in the process of developing the pricing strategy and in accordance with Section 24 of the 2023 Procurement Act NIE Networks will refine the above listed criteria by adding detail/sub-criteria and allocating weightings which will be made available to successful Suppliers who are shortlisted and invited to the tender stage of this multi-stage process. Full details relating to the award criteria will be published in the Instructions to Tender and will thereafter remain unchanged throughout the remaining stages of the process While the Percentage weighting in the Notice states 40%, please note this is stated solely for the purpose of publishing the Notice. The actual cost ratio and weightings will be refined and confirmed at tender stage, where the Cost Criteria will be weighted in the range of 30% - 50%.
- Technical: NIE Networks envisage that the quality criteria to be used in the assessment of tendered proposals will relate to the following • Framework Management & Collaboration • Project Design • Project Construction • Project Programme • Project Management • Project Health, Safety & Environmental NIE Networks are in the process of developing the technical specifications relating to the initial projects to be awarded following this tender competition and as referenced in the Pre-Qualification Instructions. In accordance with Section 24 of the 2023 Procurement Act NIE Networks will refine the above listed criteria by adding detail/sub-criteria and allocating weightings which will be made available to successful Suppliers who are shortlisted and invited to the tender stage of this multi-stage process. Full details relating to the award criteria will be published in the Instructions to Tender and will thereafter remain unchanged throughout the remaining stages of the process. While the Percentage weighting in the Notice states 60%, please note this is stated solely for the purpose of publishing the Notice. The actual quality ratio and weightings will be refined and confirmed at tender stage, where the Quality Criteria will be weighted in the range of 50% - 70%.
- Economic & financial standing
Specified in the Pre-Qualification Instructions available for downloading
- Technical & professional ability
Specified in the Pre-Qualification Instructions available for downloading
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “T322 NIEN Transmission Substation Turnkey (Amended)” is a framework: the contest is a place on its panel, up to 6 suppliers, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Utilities
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes · next expected 31 Jan 2033
- First published
- 22 Jun 2026, 16:21 BST
- Last source update
- 22 Jun 2026, 16:21 BST
- Award evaluation window
- Submission end – 2 Feb 2026
- Authority reference
T322- FTS notice number
2025/S 000-013259- Latest notice
- Contract award notice (UK6)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04fdbeFind a Tender- Contract terms summary
Original Notice.
Notice identifier: 2025/S 000-013259
Procurement identifier (OCID): ocds-h6vhtk-04fdbe
Published 6 April 2025, 8:50pm
- How it runs
It is intended to procure the Framework Agreement via a multi-stage process. First stage will involve the Conditions of Participation (Pre-Qualification). Suppliers will be required to complete the Pre-Qualification Questionnaire and submit with supporting documentation requested in the Questionnaire. Following an evaluation of the submissions NIE Networks will invite up to six Suppliers for Lot 1 and to six Suppliers for Lot 2. These shortlisted Suppliers will be invited to tender (second stage) and following receipt of tenders NIE Networks at its sole discretion reserves the right to commence negotiations or invite Best and Final Offers (third stage) and the final stage will be establish the framework agreement and award the initial drawdown contracts Ballylumford (lot 1) and Tureagh (lot 2). Full details are available in the Pre-Qualification Instructions.
How it was run
Official notice- Requests to participate (first stage)
- 23 May 2025, 12:00 BST
- Appointment period ends
- 23 May 2025, 12:00 BST
- Clarification deadline
- 30 Apr 2025, 12:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
- Supplier levy on call-offs (max %)
- call-off levy · n/a
The procurement documents for T322 are available for unrestricted and full access, free of charge , at:
e-sourcingni.bravosolution.co.uk ↗
Tenders or requests to participate must be submitted electronically also via:
Timeline
6 Apr 2025 → 22 Jun 2026 · 7 dates- Tender notice published6 Apr 2025, 20:50 BST
- Clarification questions by30 Apr 2025, 12:00 BST
- Admission / appointment period endsperiod end, not a bid countdown23 May 2025, 12:00 BST
- Award decision expected by261 days ago2 Feb 2026, 23:59 GMT
- Contract starts204 days ago1 Apr 2026, 00:00 BST
- Assessment summaries sent122 days ago22 Jun 2026, 00:00 BST
- Latest notice published122 days ago22 Jun 2026, 16:21 BST
Notice history
6 events · 1 release on Find a Tender · since 6 Apr 2025- Tender notice published6 Apr 2025, 20:50 BSTUK4
- Tender notice published18 Apr 2025, 14:38 BSTUK4
- Tender notice published18 Apr 2025, 14:58 BSTUK4
- Tender notice published15 May 2025, 10:37 BSTUK4
- Contract award notice published22 Jun 2026, 16:21 BSTUK6
- Contract signature expected2 Jul 2026, 23:59 BSTscheduled
Published amendments (3)
Additional information relating to the award criteria that will be utilised in Stge 2 of this Multi Stage Procedure (Competitive Flexible Procedure.
Additional information relating to the award criteria that will be utilised in Stge 2 of this Multi Stage Procedure (Competitive Flexible Procedure.
Additional information relating to the award criteria that will be utilised in Stge 2 of this Multi Stage Procedure (Competitive Flexible Procedure. Return date for submission of Qualification Questionnaires has been extended from the 16.05.2025 to the new return date of 23.05.2025 @ 12:00 noon. The Pre-Qualification Instructions have been updated with a new section being inserted relating to the …
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Larger scale transmission substations1 award | |||
| ADMAN CIVIL PROJECTS LIMITED, H&MV Engineering Services Limited, SIEMENS ENERGY LIMITEDT322 Lot 12 Jul 2026 – 30 Jun 2031 · up to 30 Jun 2034Extensions: The framework agreement will be awarded for a period of five years, with the option to extend by a further three years ( eight years in total) subject to contractors' agreement. | £234,000,000 | 22 Jun 2026 | Awarded |
| Lot 2 · Medium Scale Substations1 award | |||
| ADMAN CIVIL PROJECTS LIMITED, KELTBRAY ENERGY LIMITED, Murphy International LimitedT332 Lot 22 Jul 2026 – 30 Jun 2031 · up to 30 Jun 2034Extensions: The framework agreement will be awarded for a period of five years, with the option to extend by a further three years ( eight years in total) subject to contractors' agreement. | £128,400,000 | 22 Jun 2026 | Awarded |
Contracting authority & participating public bodies
Framework contractors & participating bidders
5 commercial parties on the notice- Adman Civil Projects LtdFramework contractor
- Aureos Energy LtdFramework contractor
- H&MV Engineering Services LimitedFramework contractor
- Murphy International LimitedFramework contractor
- Siemens Energy LtdFramework contractor
Official documents & specifications (7)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specificationsAccess: https://e-sourcingni.bravosolution.co.uk
Notices published for this procedure
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender