Find a TenderAwarded
Published 10 May 2021, 22:55 BST

Official UK procurement notice

Supply of Whole Blood Collection System and Ancillary Processing Systems

Official notice

Authority: NHS Blood and Transplant (Central government)

Framework agreementGoods
Sectors: Medical Devices & Pharma (33) Delivery: UK
Framework ceiling (notional)Value not publishedframework ceiling, not attributable revenue
Awarded 9 Jun 2017
Framework period 5 yrs 10 moends 31 Mar 2023 · starts 9 Jun 2017

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: Blood bags · Blood plasma filters

How this framework works

From the published notice
Framework period

5 yrs 10 mo from 9 Jun 2017, Need for modification brought about by circumstances which a diligent contracting authority could not foresee. See sections VII2.1 and VII2.2

The lotProcurement structure

single lot · no lot value published
Lot #1Whole Blood Collection Systems (Lot 1) and Ancillary Processing Systems (Lot2) 5 yrs 10 mo

The EuroBloodPack 2(EBP2) framework agreement has a duration of four years and is due to expire on the 9th June 2021. This Modification will extend the EBP2 Framework Agreement to 31st March 2023.

Contract period: 9 Jun 2017 – 31 Mar 2023 (5 yrs 10 mo)
Delivery: UK · United Kingdom, Ireland, Australia, and New Zealand

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Supply of Whole Blood Collection System and Ancillary Processing Systems” is a framework: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
10 May 2021, 22:55 BST
Last source update
10 May 2021, 22:55 BST
Authority reference
NHSBT0763
FTS notice number
2021/S 000-010192
Classification (CPV)
Blood bagsBlood plasma filters
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02af41 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

9 Jun 2017 → 10 May 2021 · 2 dates
  1. Contract starts
    9 Jun 2017, 00:00 BST
  2. Notice published
    10 May 2021, 22:55 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast

1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract 010192-2021-NHSBT0763-1

    Signed
    9 Jun 2017
    Value
    £104,000,000
    Period
    9 Jun 2017 – 31 Mar 2023
    Status
    active
    • Change The EuroBloodPack 2(EBP2) framework agreement has a duration of four years and is due to expire on the 9th June 2021. This Modification will extend the EBP2 Framework until 31st March 2023. Due to the impact of Covid-19 and the support for the Convalescent Plasma (CVP) programme there has been a significant delay in the retendering the new supply and in developing the replacement International Blood Pack 1 (IBP1) Framework on time., Need for modification brought about by circumstances which a diligent contracting authority/entity could not foresee: This Modification Notice is to provide notice that the EBP2 is being modified in accordance with Regulation 72 .1. B and /or 72.1.C of the Public Contracts Regulations 2015. This is because of the continuing focus of the contracting authorities on the Covid-19 crisis (which no diligent contracting authority could have foreseen) has significantly reduced the technical support for a retender. The length of this time has been chosen so that the replacement Framework IBP1can be completed. The length of time of this extension is because any other interim arrangements would be in place for such a short duration that it would cause significant inconvenience and/ or substantial duplication of costs; along with causing significant technical barriers such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the initial procurement.

Contracting authority & participating public bodies

NHS Blood & Transplant

Contracting authorityCentral Government North Bristol Park, Filton, Bristol, UKContact email, phone

Dispute resolution & review bodies

  • High Courts of JusticeReview body London

Framework contractors & participating bidders

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.