Find a TenderAwarded without competition
Published 20 Jan 2021, 23:08 GMT

Official UK procurement notice

Supply of raw materials for the production of non-medical face coverings

Official notice

Authority: The Minister for the Cabinet Office acting through the Cabinet Office

GoodsAward procedure without prior publication of a call for competition
Awarded value£2,982,6305 contracts · exc. VAT
Awarded 23 Jul 2020no call for competition
Awarded to Textile Enterprises Ltd +4 more5 awards

What is being bought

Published requirement description

The Cabinet Office will purchase raw materials for use in the production of UK-compliant non-medical face coverings (Type IIR medical-grade masks in extremis), which are required to support the national effort to combat Covid-19.

CPV: Leather and textile fabrics, plastic and rubber materials · Textile fabrics and related items

The lotProcurement structure

single lot · no lot value published
Lot #1Materials required for the production of Face CoveringsAwarded

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
20 Jan 2021, 23:08 GMT
Last source update
20 Jan 2021, 23:08 GMT
FTS notice number
2021/S 000-001208
Classification (CPV)
Leather and textile fabrics, plastic and rubber materialsTextile fabrics and related items
Delivery area
UK
Official registry OCID
ocds-h6vhtk-028c0e Find a Tender
Why no open competition

Extreme urgency brought about by events unforeseeable for the contracting authority/entity and in accordance with the strict conditions stated in the directive

Published justification
  1. The COVID-19 outbreak is a Public Health Emergency of International Concern as declared by the World Health Organisation on 30 January 2020. The WHO Director-General characterised COVID-19 as a pandemic on 11 March 2020. As of 6 April 2020, scientific knowledge regarding the disease and its transmission was still emerging, however the WHO advised that COVID-19 transmission can occur via ‘infective respiratory droplets’ and wearing a mask represented one prevention measure that can limit the spread of viral diseases such as COVID-19.
  2. In April 2020 the UK did not possess any face covering manufacturing capability and was reliant on securing supplies from overseas producers. Problems were experienced in obtaining reliable supplies of medical PPE-grade masks in a global market due to increased global demand and the disruption to the supply chain caused by the pandemic. There was a concern that insufficient volumes of non-medical masks would become available or, if available, they would be of inferior quality or charged at exorbitant prices.
  3. In May 2020 Cabinet Office (CO) considered it crucial in the public interest to source initial supplies of face covering raw materials as part of a wider Face Coverings Programme in order to secure the UK’s domestic manufacturing capacity to:

a. produce medical grade masks immediately (if necessary);

b. create an immediate and reliable supply of high-quality non-medical face coverings at affordable prices for the domestic market; and

c. create national resilience to supply chain shocks within a global market.

This was because in April 2020 there was a considerable shortage of medical and non-medical PPE globally, there was real fear that items available would be impounded at borders so domestic production was urgently required to mitigate the impact of COVID-19.

  1. In May 2020 CO purchased 10 non-automated production machinery lines (see CAN 141-348171). This was followed later by the purchase of automated producion machinery lines (see CAN 2020-S/1430352966). In light of the urgent requirement to place the machinery with identified producers as soon as practicable and to commence their prompt operation, the CO also procured 13 weeks’ supply of the necessary raw materials to enable the immediate domestic production of non-medical face coverings. Due to the heightened international demand for raw materials utilised in the production of face masks/coverings, the long lead times, and the price volatility in the global market due to COVID-19, the CO procured the raw materials in order for them to be immediately available to the domestic producers. Waiting for the identified producers to be appointed and then for them to procure the raw materials individually would have caused delays of up to a month to the production commencement date, which would have severely impacted HMG’s effort to stimulate the urgent production of face coverings for the domestic market.
  2. An accelerated PCR procurement was impossible if the supplies of raw materials were to be available in sufficient quantities in time for the domestic production of face coverings to commence. Any delay caused by having to engage the market through an open competition or restricted procedure ran the risk of failing to secure the necessary raw materials in the required timeframe (given the international demand for such materials and the lead times involved in procuring them). That would have caused knock-on delays to other aspects of the Face Coverings Programme, such as the manufacturers commencing production of the face coverings and their ability to produce sufficient volumes for the anticipated domestic demand, which would undermine HMG efforts to mitigate Covid-19 risks in the UK.
  3. CO is satisfied the tests permitting use of the urgent direct award procedure (Regulation 32(2)(c)) t as set out in section VI 1.3 (Additional Information) above are met.

Publisher note: The text below is a continuation of paragraph 6 of Annex D1 a. There are genuine reasons for extreme urgency: CO has responded to Covid-19 immediately due to public health risks presenting a genuine emergency. The raw materials were critical for the production of face coverings, it would not be possible to commence production without the raw materials. b. The events that have led to the need for extreme urgency were unforeseeable: The European Commission (Commissioner Breton – April 2020) has confirmed that the coronavirus crisis presents an extreme and unforeseeable urgency. c. It is impossible to comply with the usual timescales in the PCR: There was no time to run an accelerated procurement under the open, restricted or competitive procedures with negotiation that would allow CO to secure all of the raw materials in the immediate term. That is particularly so in light of the likely delays to any procurement timeline – for example, drafting the technical documents required for the ITT stage – and the operational and commercial risks for the other inter-related aspects of the Face Coverings Programme that would arise as a result of any hold-up with sourcing the raw materials. Each individual component would require a separate tender process and delays to one element could delay production entirely. d. The situation is not attributable to the Contracting Authority: It has not done anything to cause or contribute to the need for extreme urgency. e. As far as is strictly necessary: The CO needed to act promptly as there is a substantial lead in time for the sourcing and delivery all of the raw materials, with some materials procured from China. A delay in sourcing and delivery of any of the raw materials has the risk of delaying production entirely. There was also price volatility to contend with due to international demand for face mask/covering associated raw materials, therefore CO needed to secure orders as soon as possible.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 5
Awarded value £2,982,6305 contracts exc. VAT
Bids received 1
Contracts signed 5latest 23 Jul 2020
Awarded toValueDateStatus
Textile Enterprises Ltd15 million metres of 2.5mm round elastic (Polyester and Spandex) for face covering production£337,500 †—Awarded
Tame Valley Padding Co. Limited t/a Holden LaminatesSupply of a total of 15 million meters of spun bond (“Spun Bond”)£1,350,000 †—Awarded
National Flexible Limited3 month supply of recyclable clear film to package face coverings£138,403 †—Awarded
NPS Worldwide – UK LimitedSupply of meltblown polypropylene width 175mm at 30gsm (“Meltblown”)£1,130,141 †—Awarded
Shenzhen Sinrui Technology Co., LtdSupply of 3.0mm wide and 0.45mm single ferric core PE nose wire (“Nose Bridges”)£26,585 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids———

Contracting authority & participating public bodies

The Minister for the Cabinet Office acting through the Cabinet Office

Contracting authorityMinistry or any other national or federal authority, including their regional or local subdivisionsHealth 1 Horse Guards Road, London, UK, SW1A 2HQContact email, phone

Bidders & participating suppliers

5 commercial parties on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.