Published requirement descriptionSevern Trent Water are working on reducing design time, carbon efficiency and construction time for several key assets over the current Asset Management Plan (AMP8). Storage tanks have been identified as an asset used widely across the business, from storm tanks to distribution service reservoirs.
Severn Trent Water have developed a Plug and Play modular precast concrete tank system that can be used in several applications which allow standardisation of assets, reduce costs and improve carbon efficiencies and now are looking to develop a supply chain to work with in supplying this asset, both directly as STW and also indirectly through the STW capital supply chain.
The technical specification details the requirements for the supply of precast concrete panels for the Plug & Play tank solution. The tank solution is intended to be used across both potable drinking water assets and wastewater assets.
It is expected that the split between clean water and wastewater will be unequal; most tank panels will be required for wastewater assets, demonstrated in the following volumes.
The overall Framework will include a number of different product lines. These are:
- Above ground square/rectangular tanks
- Below ground square/rectangular tanks
- Above ground circular tanks
- Below ground circular tanks
The first design completed, and included in theis tender document, will be for the product line "Above ground rectangular tanks 6m high". The designs for the remaining product lines are yet to be completed.
As a result, Severn Trent intends to award the initial phase of the Pre-cast Concrete Framework to a single supplier. Only one supplier will be awarded the delivery of these initial phase and will be considered the primary supplier.
As part of this tender process, Severn Trent will also select up to three secondary suppliers.
- How the procedure runs: Two stage process: 1st Stage) Prequalification Questionnaire(PQQ) Following evaluation of these responses, the top scoring bidders will be invited to progress to the next stage and participate in a Request for Proposal (RFP) process. We expect to shortlist a maximum of the top 8 ranking bidders against the criteria outlined in the PQQ Briefing Pack which is a mixture of scored and pass/fail questions. 2nd Stage) Request for Proposal(RFP) Prequalified bidders are now invited to submit a RFP which will be evaluated as a weighted percentage split between Specification/Technical/Sustainability(60%) & Commercial (40%) Once the questions and price have been evaluated and weightings applied against the criteria outlined in the RFP Briefing Pack, these scores will be added together, and bidders will be ranked on the combined weighting. Once this initial assessment has been completed against the criteria outlined in the RFP Briefing Pack, there may be a further short listing of the top 5 scoring suppliers. These top 5 suppliers will be asked to present, and the final negotiations will be undertaken with only these final 5 suppliers. This shortlisting will be based on the top 5 suppliers. Suppliers who are not successfully shortlisted will be notified through SAP Ariba. Final scores only will be included in the tender outcome letters. The top scoring supplier be declared the Primary Supplier for the product line tendered on in the bid sheet (square/rectangular above ground precast tank panels). The subsequent three suppliers will be declared the Secondary Suppliers for this product.
CPV: Concrete products
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Places
- up to 4 suppliers · 4 appointed (full)
- Framework period
- 2 yrs · up to 5 yrs from 31 Jan 2026
Published description of the framework
Client Requirements
The Client identifies the need and which product line covered under the Framework is required and then will raise a Works order with all the relevant project details using a template.
Supplier Selection - Existing Product Line
The primary supplier is contacted first for availability, lead time & overall project costs. Key dates will be agreed in the Works Order between the client and the supplier.
If the primary supplier is unable to meet the requirement (e.g., due to stock issues, lead time constraints, or quality concerns), the Secondary Supplier may be engaged and mobilised.
If a secondary supplier is mobilised for a product line, then that secondary supplier will become a primary supplier for the product line (details further below).
If there are multiple Primary Suppliers, then all will be contacted to establish ability to achieve project delivery requirements. All suppliers that can achieve the delivery program will be approached for project costs, with the lowest cost being allocated the order.
ANY DEVIATION FROM THIS PROCEDURE MUST BE APPROVED BY THE CATEGORY MANAGER.
Supplier Selection - New Product Lines
For new requirements, all Framework (primary and secondary) suppliers will be contacted for the opportunity to put a cost and mobilisation time forward to become primary supplier for the new product line.
Technical details will be shared with all Framework providers and details as to information required and submission timescales will be given to all to allow for
Should the mobilisation time be within the Clients requirement, then lowest cost put forward will be chosen as the Primary Supplier for the new product line.
The framework Schedule of Rates will be updated to reflect this new pricing arrangement.
In the event that new product lines have efficiencies with current product lines already allocated to a Supplier. The utility reserves the right to directly allocate a production line to that supplier without approaching all framework suppliers.
If a product line needs a new mould - it is a new product line. If an existing mould can be used then the design will be considered an existing product.
Secondary Supplier Mobilisation on Existing Line
In the event of the following:
- Primary supplier(s) fail to meet KPIs
- Primary supplier(s) fail to upscale to meet capacity
- Secondary suppliers have a technological innovation giving them a product benefit
- Benchmarking existing product line prices (i.e in the case of a same mould required for an additional product line)
Then an additional primary supplier may be required/added to an existing product line following the process outlined in Section 2. New Product Lines.
This will be done on a case by case basis.
The lotProcurement structure
single lot · value publishedLot #1AwardedRenewalPublished value£6,000,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Commerical: 40%
- Specification/Technical/Sustainability: 60%
Published award criteria (2)
- Specification/Technical/Sustainability
- Commerical
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “Supply of Precast Concrete Tank Panels” is a framework: the contest is a place on its panel, up to 4 suppliers, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Goods
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Utilities
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 11 Apr 2025, 14:37 BST
- Last source update
- 30 Mar 2026, 16:57 BST
- Award evaluation window
- Submission end – 19 Jan 2026
- FTS notice number
2025/S 000-062321- Latest notice
- Contract award notice (UK6)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0501acFind a Tender
- How it runs
Two stage process:
1st Stage) Prequalification Questionnaire(PQQ)
Following evaluation of these responses, the top scoring bidders will be invited to progress to the next stage and participate in a Request for Proposal (RFP) process. We expect to shortlist a maximum of the top 8 ranking bidders against the criteria outlined in the PQQ Briefing Pack which is a mixture of scored and pass/fail questions.
2nd Stage) Request for Proposal(RFP)
Prequalified bidders are now invited to submit a RFP which will be evaluated as a weighted percentage split between Specification/Technical/Sustainability(60%) & Commercial (40%)
Once the questions and price have been evaluated and weightings applied against the criteria outlined in the RFP Briefing Pack, these scores will be added together, and bidders will be ranked on the combined weighting.
Once this initial assessment has been completed against the criteria outlined in the RFP Briefing Pack, there may be a further short listing of the top 5 scoring suppliers. These top 5 suppliers will be asked to present, and the final negotiations will be undertaken with only these final 5 suppliers.
This shortlisting will be based on the top 5 suppliers. Suppliers who are not successfully shortlisted will be notified through SAP Ariba. Final scores only will be included in the tender outcome letters.
The top scoring supplier be declared the Primary Supplier for the product line tendered on in the bid sheet (square/rectangular above ground precast tank panels).
The subsequent three suppliers will be declared the Secondary Suppliers for this product.
How it was run
Official notice- Appointment period ends
- 3 Nov 2025, 23:59 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Timeline
11 Apr 2025 → 10 Apr 2026 · 9 dates- Planning notice published11 Apr 2025, 14:37 BST
- Market engagement30 Apr 2025, 23:59 BST
STW have a requirement for the ongoing supply of Precast Concrete Tank Panels
We are keen to engage with interested suppliers to help design and tailor a sourcing strategy and procurement process that meets our requirement but is also suitable to the widest group of suppliers. Any future Tender Notice will be published and response to this pre market engagement is optional and does not contribute to any procurement process.
We invite suppliers to complete the following form and we will be in touch:
- Tender notice published385 days ago3 Oct 2025, 17:10 BST
- Admission / appointment period ends353 days ago · period end, not a bid countdown3 Nov 2025, 23:59 GMT
- Award decision expected by276 days ago19 Jan 2026, 23:59 GMT
- Contract starts265 days ago31 Jan 2026
- Assessment summaries sent207 days ago30 Mar 2026, 00:00 BST
- Latest notice published207 days ago30 Mar 2026, 16:57 BST
- Standstill ends195 days ago10 Apr 2026, 23:59 BST
Notice history
11 events · 4 releases on Find a Tender · since 11 Apr 2025- Preliminary market engagement notice published11 Apr 2025, 14:37 BSTUK2
- Preliminary market engagement notice published11 Apr 2025, 14:38 BSTUK2
- Tender notice published3 Oct 2025, 17:10 BSTUK4
- Published value updated3 Oct 2025, 17:10 BST
- Status changed to active3 Oct 2025, 17:10 BST
- Procurement method changed3 Oct 2025, 17:10 BST
- Deadline published: 3 Nov 2025, 23:59 GMT3 Oct 2025, 17:10 BST
- Contract award notice published30 Mar 2026, 16:57 BSTUK6
- Status changed to complete30 Mar 2026, 16:57 BST
- Procurement method changed30 Mar 2026, 16:57 BST
- Contract signature expected13 Apr 2026, 23:59 BSTscheduled
Routine re-releases (4)
- 2025-04: 1 release · 11 Apr 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| FLI PRECAST SOLUTIONS UK LIMITED, KILNBRIDGE STRUCTURES LTD, Marshalls Mono, Shay Murtagh (Precast) Ltd13 Apr 2026 – 13 Apr 2028 · up to 13 Apr 2031Extensions: Initial award period of 2 years with options to extend 1+1+1. | £5,000,000 | 30 Mar 2026standstill to 10 Apr 2026 | Standstill |
Contracting authority & participating public bodies
Framework contractors & participating bidders
4 commercial parties on the notice- FLI PRECAST SOLUTIONS UK LIMITEDFramework contractor
- KILNBRIDGE STRUCTURES LTDFramework contractor
- MARSHALLS MONO LIMITEDFramework contractor
- Shay Murtagh (Precast) LtdFramework contractor
Official documents & specifications (4)
Official links; attachments are not copiedNotices published for this procedure
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender