Supply of One New Towage Boat (Design and Build)

Boats
Specialised boats
Tug boats
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Orkney Islands Council: "Supply of One New Towage Boat (Design and Build)". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityOrkney Islands CouncilScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Orkney Islands Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Orkney Islands Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
2.7Bids / Report
41.5% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 53 active published awards; 53 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityOrkney Islands Council
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published28 Sept 2022, 11:05 BST
Last source update28 Sept 2022, 11:05 BST
Recurring procurementNot published
ClassificationBoats, Specialised boats, Tug boats
Delivery area
OCIDocds-h6vhtk-036c0c
What is being bought
Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas.
What changed
From the official release history
  1. Status changed to complete
    28 Sept 2022, 11:05 BST
  2. Official notice release published
    28 Sept 2022, 11:05 BST
  3. Buyer information updated
    28 Sept 2022, 11:05 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Supply of One New Tug Boat (Design and Build) - Currently Under Construction
    cancelled
    Published valueNot published
    The Basic Specification is given as a guide as to the specific requirements of the Owner. 1.1. The principal dimensions of the vessel are expected to be approximately as follows:- Length overall : +/- 32 metres Breadth extreme : 12 to 14 metres Operating draft : MAXIMUM of 5.50 metres (navigational draft), when fully loaded with fuel and FW 1.2. The vessel is to be constructed, equipped and outfitted in accordance with the latest Rules and Regulations of Lloyd’s Register or other IACS member society, for Unrestricted Service. 1.3. The vessel is to be constructed under survey of Lloyd’s Register or other IACS member society, and delivered in Class. As a minimum, Class Notations assigned should be the following (or equivalent according to the Classification Society):- +100A1 Escort Tug UMS +LMC Firefighting 1 with water spray *IWS 1.4. The Gross Tonnage should be less than 500. 1.5. The design, construction and fitout of the vessel is to be in compliance with all statutory international regulations and MCA requirements for a vessel of UK Class IX. 1.6. Crew accommodation to be provided in 6 single cabins, two of which to also have folding or pull-out bunks for occasional use. Lifesaving appliances to be provided for 16 persons, 1.7. Vessel to be delivered UK flagged. Contractors to arrange for MCA inspection, in order to issue ‘Record of Inspection of Safety Equipment’ (MSF1102). 1.8. The vessel’s stability and freeboard should be suitable to permit carrying one 20- foot container on the main deck, of gross weight up to 10 tonnes, whilst the vessel is fully loaded with fuel and fresh water. The provision (design and build contract) of one new build tug to meet the Council’s specification, Lot 1 will be for a new build tug that is currently under construction with a Contract duration and delivery timescale following successful sea trials, of within 6 months. The Authority already operates tug vessels in which the main engines are of Caterpillar manufacture type 3516C or equivalent and as such has requested two engine cost options be provided in respect of main engine emissions criteria - only where the following circumstance applies: If the Contractor can offer a vessel already under construction i.e. keel laid before 1st January 2021. IMO Tier II (keel laid before 1st January 2021) Caterpillar 3516C or equivalent Tier II being achieved in-engine and no exhaust after treatment required. With part completion / ready for owners sea trials due within six months of the issue of this ITT 1.10. Fuel tank capacity to be a minimum of 120 cubic metres. 1.11. Fresh water capacity to be no less than 20 cubic metres. The anticipated Contract Duration from award of Contract (Lot 1) to delivery of the vessel, following successful sea trials, will be from August 2022 to 31 January 2023 Additional information: The anticipated Contract Duration from award of Contract (Lot 1) to delivery of the vessel, following successful sea trials, will be from August 2022 to 31 January 2023.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    28 Sept 2022, 11:05 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 8 Sept 2022, 00:00 BST · £6,990,000
Commercial outcome and competition
Awards
SANMAR Shipyards
Not published · Not published · active
Contracts
Supply of One New Tug Boat (Design and Build) - Currently Under Construction
£6,990,000 · signed 8 Sept 2022, 00:00 BST · active
Bid statistics
bids: 1 (lot 1)
electronicBids: 1 (lot 1)
foreignBidsFromEU: 0 (lot 1)
foreignBidsFromNonEU: 1 (lot 1)
smeBids: 1 (lot 1)
Buyer and organisations in this procedure

Orkney Islands Council

Contracting authority GB-FTS-4848
View buyer profile
  • Orkney Islands Council
    buyer

    Council Offices, School Place, Kirkwall, UKM65, KW15 1NY
    +44 1856873535
  • Kirkwall Sherriff Court
    reviewBody

    Watergate, Kirkwall, KW15 1PD
    +44 1856872110
  • SANMAR Shipyards
    supplier

    Aydintepe Mh. Güzin Sok. No: 31 , Icmeler / Tuzla, ISTANBUL, UKM65, 34947
    +90 5320689041
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published