Stopped Vehicle Detection (SVD) 2020 (Lot 1)

Official notice

Authority: Highways England

Goods
Awarded value£25,750,000published contract · exc. VAT
Awarded 7 Aug 2020
Awarded to Navtech Radar Limited

What is being bought

Published requirement description

No description was published on the notice. See the official documents.

CPV: Miscellaneous transport equipment and spare parts

The lotProcurement structure

single lot · no lot value published
Lot #1As described in Section II2.4
Delivery: UK · England

Procedure terms & legal framework

From the official record
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
8 Apr 2021, 22:55 BST
Last source update
8 Apr 2021, 22:55 BST
FTS notice number
2021/S 000-007325
Classification (CPV)
Miscellaneous transport equipment and spare parts
Delivery area
UK
Official registry OCID
ocds-h6vhtk-02a40e Find a Tender

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £25,750,0001 contract exc. VAT
Contracts signed 1latest 7 Aug 2020
Awarded toValueDateStatus
Navtech Radar LimitedSVD Retrofit£25,750,000 †—Awarded

Contracts

  • SVD Retrofit · Navtech Radar Limited

    Signed
    7 Aug 2020
    Value
    £25,750,000
    Status
    active
    • Change Nature and extent of the modifications (with indication of possible earlier changes to the contract): The current framework for the provision of a Lot 1 Stopped Vehicle Detection (SVD) solution was awarded on 16 July 2020 for a 4-year term with an expiry date of 15 July 2024. The original scope and estimated value for the supply of SVD radar under this framework was determined based on the understanding that radar units would be sited on average 500m apart on the Strategic Road Network (SRN). Since the award of this framework, a detailed technical review was undertaken to determine the optimal spacing of radar. This review determined that it was optimal to locate SVD radar technology to make use of as much existing infrastructure as possible whilst still delivering the required degree of effectiveness of detection on the road network, and therefore units would be sited on average 300 metres apart in all future installations. As a result of the decision, additional radar units and associated commissioning and support services have become necessary under this framework. The estimated value of the additional supplies and services is £7.75m. A modification to the framework is therefore required in accordance with Regulation 72(1)(b) of the Public Contracts Regulations 2015 for additional services and supplies by the original contractor that have become necessary and were not included in the original procurement, where a change of contractor: cannot be made for economic or technical reasons such as such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the initial procurement; and would cause significant inconvenience or substantial duplication of costs for the contracting authority; And the increase in price does not exceed 50 % of the value of the original contract., Need for additional works, services or supplies by the original contractor/concessionaire: In order to meet the increased density requirements, additional radar units are required and these will need to be inter-operable with the existing Navtech radar supplied under the current framework. No other provider could supply the Navtech radar without the agreement of Navtech, and even if Navtech gave its agreement for another provider to supply its radar, no other provider could supply the Navtech radar and associated commissioning and support services without a considerable increase in price compared to Navtech supplying its radar directly. These are the economic and technical reasons why a change of contractor cannot be made. Furthermore, if it were possible it would cause substantial inconvenience and duplication of costs to engage any other contractor to provide the additional supplies and services, when the majority of the radar units, commissioning and support will be provided by the existing supplier under this framework.

Contracting authority & participating public bodies

Highways England

Contracting authority The Cube, 199 Wharfside Street, Birmingham, UK, B1 1RNContact name, email

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.