Find a TenderAwardedContract award notice
Published 24 Dec 2025, 14:01 GMT

Official UK procurement notice

Responsive Repairs and Void Works Framework

Official notice

Authority: Irwell Valley Housing Association (Housing)

Open framework schemeServicesCompetitive flexible procedureAbove thresholdSME suitable
Framework ceiling (notional)£3,600,000framework ceiling, not attributable revenue
Submissions closed 9 Feb 2026awarded 18 Sept 2026
Awarded to ADVANCED BUILDING NW LTD +2 more
Framework period 2 yrsends 12 Apr 2028 · up to 12 Apr 2029 with extensions · starts 13 Apr 2026

What is being bought

Published requirement description

Irwell Valley Homes (IVH) is seeking to establish an open framework for the provision of repairs and maintenance services in property owned, controlled or occupied by IVH. IVH provides a wide range of inhouse maintenance and repair services but also requires a reliable supplier network to support the IVH repairs team.

The Framework will have one (1) Lot, with options to add further Lots in the future.

Lot 1 - Responsive Repairs and Void Works

Responsive Repairs - Day to Day Responsive Repairs including Emergency Work arising during the normal working hours of the day

Void Works - Any repairs, renewals, reinstatement, replacement, internal redecoration, upgrading, cleaning and clearing out ordered in accordance with the provisions of the Contract arising as a result of a change of tenancy. IVH will carry out "Void Property Inspections". This means inspection of the Void Property to establish what Works are required. Once scoped and priced the Work would then be passed to the Supplier to complete with a target completion date.

The framework will appoint three contractors to deliver services over a two (2) year term, with an optional one (1) year extension, with options to re-open annually. Any decision regarding the re-opening of the framework remains entirely at the discretion of IVH and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the framework.

  • How the procedure runs: Stage 1 - Invitation to Participate: Procurement Specific Questionnaire - This includes conditions of participation which suppliers must meet in order to proceed to the next stage of the procurement process Stage 2: (Part 1) - Invitation to Submit a Tender - This includes an assessment of all tenders (Quality and Price) in order to identify the Supplier which has submitted the most advantageous tender in accordance with the assessment methodology and award criteria set out in the Tender Notice and described in the Invitation to Tender. Stage 2: (Part 2) - Inviting a maximum of six (6) of the highest scoring bidders to deliver presentations. The scores obtained at Stage 2 (Part 2) will be combined with those obtained at Stage 2 (Part 1) to produce an overall score out of 100% This stage has been introduced to reduce the barriers that SMEs face when bidding for contracts. This stage gives the opportunity for bidders to enhance their written responses. Only suppliers who would benefit from the scores in Stage 2 (Part 2) will be invited to take part.

CPV: Building completion work · Building installation work · Repair and maintenance services of building installations

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 3 suppliers · 6 bids received (2.0 per place) · 3 appointed (full)
Framework period
2 yrs · up to 3 yrs from 13 Apr 2026
Scheme runs until
13 Apr 2029
Published description of the framework

This tender is an opportunity to submit a discounted percentage rate against M3NHF Schedule of Rates (SORs) (version 8) which will be fixed for the duration of the contract.

The framework will appoint three contractors to deliver services over a two-year term, with an optional one-year extension, with options to re-open annually. Any decision regarding the re-opening of the framework remains entirely at the discretion of IVH and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the framework.

If the framework is reopened, any new suppliers will follow the same process detailed in the Procurement Specific Questionnaire and ITT. Existing suppliers on the framework can choose to submit a new tender to be assessed or maintain the assessment score from their previous submission.

IVH reserves the right to appoint a replacement contractor(s) in the event of the contractor(s) initially being appointed withdrawing from the Framework, or in the event that IVH terminates the agreement with the contractor(s) initially appointed. If a contractor is withdrawn, the next highest scoring bidder will be contacted with a view to them being appointed as a replacement contractor.

Framework allocation will be based on ranking:

  • 1st place: approx. 50% of total value
  • 2nd place: approx. 40%
  • 3rd place: approx. 10%

All allocations, including ranking, remain subject to performance monitoring and compliance with agreed KPIs.

Contractors will be evaluated throughout the duration of the contract, and IVH reserves the right to re-allocate percentages to other contractors on the framework if the contractor fails to meet KPI / SLA targets for 2 successive months.

IVH intends to call off under this framework by issuing work orders via our Housing Management system, Contractor Portal or by email. As such, the framework terms and conditions will apply to each work order issued.

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 2 yrsPublished value£3,600,000
Contract period: 13 Apr 2026 – 12 Apr 2028 (2 yrs) · up to 12 Apr 2029 with extensionsValue: £3,600,000 exc. VAT · £3,600,000 inc. VAT
Delivery: North West
Extensions: Optional 1 year extension

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
  • Simple description: 40% Price 30% Quality 30% Interview/Presentation
What this means for your bid
  • “Responsive Repairs and Void Works Framework” is a framework: the contest is a place on its panel, up to 3 suppliers, not a single contract: call-offs may be direct or by further competition.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
24 Dec 2025, 14:01 GMT
Last source update
19 Sept 2026, 16:36 BST
Award evaluation window
Submission end – 10 Apr 2026
FTS notice number
2025/S 000-086159
Latest notice
Contract award notice (UK6)
Classification (CPV)
Building completion workBuilding installation workRepair and maintenance services of building installations
Delivery area
North West (UKD3)
Official registry OCID
ocds-h6vhtk-05fd5a Find a Tender
How it runs

Stage 1 - Invitation to Participate: Procurement Specific Questionnaire - This includes conditions of participation which suppliers must meet in order to proceed to the next stage of the procurement process

Stage 2: (Part 1) - Invitation to Submit a Tender - This includes an assessment of all tenders (Quality and Price) in order to identify the Supplier which has submitted the most advantageous tender in accordance with the assessment methodology and award criteria set out in the Tender Notice and described in the Invitation to Tender.

Stage 2: (Part 2) - Inviting a maximum of six (6) of the highest scoring bidders to deliver presentations. The scores obtained at Stage 2 (Part 2) will be combined with those obtained at Stage 2 (Part 1) to produce an overall score out of 100%

This stage has been introduced to reduce the barriers that SMEs face when bidding for contracts. This stage gives the opportunity for bidders to enhance their written responses.

Only suppliers who would benefit from the scores in Stage 2 (Part 2) will be invited to take part.

Review and risk notes
Risks

IVH may exercise the following options while the contract is valid:

Suppliers may deliver additional services/works or location that are in keeping with the nature of the contract for presently unknown variables, such as:

> to support other departments within IVH

> to help to meet carbon net zero objectives

> supporting any incoming or new regulatory and legislative changes

> in cases of urgency

> in cases of an alternative contract failure or termination

> in cases of IVH staff absence or illness

How it was run

Official notice
Run through: In-tend · Who buys & how to bid on In-tend
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · one account per buying organisation's portal · reCAPTCHA on signup
Requests to participate (first stage)
9 Feb 2026, 23:59 GMT
Appointment period ends
9 Feb 2026, 23:59 GMT
Clarification deadline
19 Jan 2026, 23:59 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

24 Dec 2025 → 19 Sept 2026 · 7 dates
  1. Tender notice published305 days ago
    24 Dec 2025, 14:01 GMT
  2. Clarification questions by279 days ago
    19 Jan 2026, 23:59 GMT
  3. Admission / appointment period ends258 days ago · period end, not a bid countdown
    9 Feb 2026, 23:59 GMT
  4. Award decision expected by198 days ago
    10 Apr 2026, 23:59 BST
  5. Contract starts196 days ago
    13 Apr 2026, 00:00 BST
  6. Assessment summaries sent38 days ago
    18 Sept 2026, 00:00 BST
  7. Latest notice published36 days ago
    19 Sept 2026, 16:36 BST

Notice history

6 events · 4 releases on Find a Tender · since 24 Dec 2025
  1. Tender notice published
    24 Dec 2025, 14:01 GMT
    UK4
  2. Tender notice published
    2 Jan 2026, 17:06 GMT
    UK4
  3. Tender notice published
    16 Jan 2026, 08:39 GMT
    UK4
  4. Contract award notice published
    19 Sept 2026, 16:36 BST
    UK6
  5. Status changed to complete
    19 Sept 2026, 16:36 BST
  6. Contract signature expected
    1 Oct 2026, 23:59 BST
    scheduled
Published amendments (2)

Added more detail to descriptions

Added more detail to descriptions

Routine re-releases (4)
  • 2025-12: 1 release · 24 Dec 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awarded toValueDateStatus
ADVANCED BUILDING NW LTDSME, Proactive FM LtdSME, Vision Property Experts LtdSME1 Oct 2026 – 30 Sept 2028 · up to 30 Sept 2029Extensions: Optional 1 year extension£3,600,000 inc. VAT18 Sept 2026Awarded

Bid statistics published by the authority

BidsSMEVCSEValid bid range
6final-stage tenders · 14 at stage one60—

Contracting authority & participating public bodies

IRWELL VALLEY HOUSING ASSOCIATION LIMITED

Contracting authorityPublic undertaking GB-COH: IP20684R 1st floor Soapworks, Colgate Lane, Salford, North West, M5 3LZContact email

Framework contractors & participating bidders

3 commercial parties on the notice
  • ADVANCED BUILDING NW LTDFramework contractorGB-COH: 05346602 HARRISON STREET, MANCHESTER, North West, M38 9APContact email
  • Pro ActiveFramework contractorGB-COH: 09149024 184 Worsley Rd, Manchester, North West, M27 5SNContact email
  • Vision Property Experts LtdFramework contractorGB-COH: 10031752 Office 7, 56 Manchester Road, Manchester, North West, WA14 4PJContact email

Official documents & specifications (5)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender