Official UK procurement notice
Renewable Energy Framework - Wind
Authority: Associated British Ports
What is being bought
Published requirement descriptionThis Framework Contract is for Wind technology only. Two main stages of delivery to be catered under the framework: (1) Feasibility: the services to include, but will not be limited to, likelihood of planning consent, outline design considerations including grid connection informal discussions with DNO, location, scale, surveys, capex, opex, likely components (annual yield MWh (ac) outline delivery plan, re-validation of Development phase costs, potential tip height, hub height and machine size that balances commercial value with likelihood of planning consent, etc.; (2) Development: the services to include, but will not be limited to, many of the above and in more detail, planning consent, grid connection application, Design (in enough detail for others to price against), delivery plan, etc.
CPV: Engineering design services · Project and design preparation, estimation of costs
How this framework works
From the published notice- Places
- up to 4 suppliers · 6 bids received (1.5 per place) · 3 appointed
The lotProcurement structure
single lot · no lot value publishedLot #1ABP currently has 26 MW of operational onshore wind and solar generation as of Q1…Awarded
ABP currently has 26 MW of operational onshore wind and solar generation as of Q1 2021, with installations in 17 of its 21 UK ports. By Q3 2021 the installed capacity is expected to be approximately 29 MW given construction projects already contracted. ABP’s objective is to significantly increase its renewable asset base over the next five years above this initial 29MW. In order to achieve this, ABP are seeking Developer Partners to assist with the development of the projects. ABP key objective in appointing Developer Partners is:(1) The selected Developer Partners to take projects through the feasibility, development stages, gaining planning consent and preparing the project for construction.(2) The selected Developer Partner will lead the development activity and will essentially be working for a fee; they will not hold any equity stakes in the projects or assets.Two main stages of delivery to be catered under the framework:(A) Feasibility: the services to include, but will not be limited to, likelihood of planning consent, outline design considerations including grid connection informal discussions with DNO, location, scale, surveys, capex, opex, likely components (annual yield MWh (ac) outline delivery plan, re-validation of Development phase costs, potential tip height, hub height and machine size that balances commercial value with likelihood of planning consent, etc.(B) Development: the services to include, but will not be limited to, many of the above and in more detail, planning consent, grid connection application, Design (in enough detail for others to price against), delivery plan, etc.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “Renewable Energy Framework - Wind” is a framework: the contest is a place on its panel, up to 4 suppliers, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 27 Apr 2021, 07:15 BST
- Last source update
- 11 Oct 2021, 09:24 BST
- Authority reference
GRP-FRA-21/009- FTS notice number
2021/S 000-025316- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02aa6eFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
Official notice- Appointment period ends
- 21 May 2021, 12:00 BST
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Supplier levy on call-offs (max %)
- document
Timeline
21 May 2021 → 11 Oct 2021 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown21 May 2021, 12:00 BST
- Invitations to tender expected7 Jun 2021, 00:00 BST
- Notice published11 Oct 2021, 09:24 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete11 Oct 2021, 09:24 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Wind - Feasibility & Development
- Signed
- 28 Sept 2021
- Value
- —
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 6bids · 6 electronic · 6 from abroad | — | — | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
3 commercial parties on the notice- Aecom LimitedFramework contractor
- Green Cat Renewables LimitedFramework contractor
- Locogen Consulting LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria