Published requirement descriptionDescription of Works
The Site
Location: Calf of Eday Minor Light is situated on the small island of Eday, to the Northeast of mainland Orkney (Latitude 59o 14.2’ N, Longitude 2o 45.7’ W).
Lighthouse Site: Access to the site is through an agreed right of access with the owner of Carrick Farm, Eday. This consists of a rough footpath through grazing fields (pasture and rough grazing), approx. 870m in length. The topography is relatively flat, with some sections of steeper ground across small burns. There are steep cliffs immediately to the seaward side of the access track.
On the landward side of the site, there is a small solar array bounded by a post and wire fence, and a set of concrete steps with galvanised steel handrail down to the lighthouse access walkway. This walkway itself is formed of galvanised steel which sits on stone piers.
The lighthouse itself is built on a concrete base within the intertidal zone and sits approximately 18.0m out from high tide level.
This project is to refurbish the lighthouse structure including replacement of the existing access ladder, balcony and lightroom with GRP equivalent, and full electrical re-work. There are minor repairs required to the existing access walkway and solar array.
Site Access
Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Ship and Helicopter. See sections of NLB Helicopter manual for details of working with the helicopter included as an Appendix to the tender documents. There will additionally be a requirement to bring some sections of the new lightroom to site using a ‘multicat’ style low draught vessel with crane attachment.
The site can be accessed by boat, subject to local weather conditions, and on foot, as above. An agreement may be reached with the landowner regarding access through their fields using small ATVs, but this is not currently in place.
The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract.
All materials for site establishment to be delivered to NLB Oban no later than 17 April 2026.
NLV Pharos and NLB Helicopter to deliver materials to site starting 28 April 2026, with block ending 3 May 2026, latest.
A mid-visit by NLV Pharos and NLB Helicopter is scheduled for 28-30 June 2026, inclusive.
Project works to be completed ahead of scheduled clearance by NLV Pharos and NLB Helicopter 29 August to 1 September 2026, inclusive.
Main elements of project as follows:
•Carry out full asbestos survey of buildings where work will take place
•Delivery of all plant/materials to site, and establish site
•Establishment of site camp, to include welfare and accommodation for site staff for duration of the project
•Erection of scaffolding or other suitable access to allow for works to existing lightroom
•Demolition and removal from site of existing lightroom, balcony and access ladder
•Template made of existing fixing holes in top of octagonal tower section
•Fabrication, delivery to site (using multicat vessel or other suitable means) and install of new GRP lightroom, aluminium balcony and access ladder
•Full electrical strip, including optic and solar panels, and install of new system
•Full internal and external redecoration of the tower, including removal of lightning conductor system
•Works to upgrade access bridge, including replacement of cross beams where corroded, infill of voids on masonry piers and replacement of some handrail elements
•Rewire of solar array boundary fence
•Demobilisation
Programme
All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 28 April 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works.
It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 11 February 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.
CPV: Electrical installation work · Electrical wiring and fitting work · Painting work · Works for complete or part construction and civil engineering work
The lotProcurement structure
single lot · value publishedWhat it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Capability & Project Information: 60%
- Project Costs - Bill of Quantities: 40%
Published award criteria (2)
- Project Costs - Bill of Quantities
- Capability & Project Information
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Below threshold - open competition
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Below threshold
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 15 Jan 2026, 19:06 GMT
- Last source update
- 13 Mar 2026, 19:33 GMT
- Authority reference
ENPR/LCDY/2526- FTS notice number
2026/S 000-003664- Latest notice
- Contract award notice (UK6)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-060715Find a Tender
How it was run
Official notice- Submission deadline
- 24 Feb 2026
- Clarification deadline
- 5 Feb 2026
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
Timeline
15 Jan 2026 → 17 Apr 2026 · 5 dates- Tender notice published285 days ago15 Jan 2026, 19:06 GMT
- Clarification questions by265 days ago5 Feb 2026
- Submission deadline246 days ago24 Feb 2026
- Latest notice published228 days ago13 Mar 2026, 19:33 GMT
- Contract starts194 days ago17 Apr 2026, 00:00 BST
Notice history
4 events · 2 releases on Find a Tender · since 15 Jan 2026- Tender notice published15 Jan 2026, 19:06 GMTUK4
- Contract award notice published13 Mar 2026, 19:33 GMTUK6
- Status changed to complete13 Mar 2026, 19:33 GMT
- Contract signature expected13 Mar 2026, 23:59 GMTscheduled
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Accted LtdSME17 Apr 2026 – 4 Sept 2026 | £303,640 | 11 Mar 2026 | Awarded |
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 2final-stage tenders | 2 | 0 | — |
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Accted LimitedAwarded supplier
Official documents & specifications (2)
Official links; attachments are not copiedNotices published for this procedure
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender