What is being bought
Published requirement descriptionProvision of new incoming electrical capacity to the Wessex fields site to the East of Royal Bournemouth Hospital site including installation of new 11kV cables from Boscombe East primary substation to a new secondary substation on Wessex Fields, and all attendant roads and street works and liaison with SSEN for design approval
CPV: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork · Installation services of electricity distribution and control equipment
The lotProcurement structure
single lot · value publishedLot #1Phase 4 of the Royal Bournemouth Hospital electrical infrastructure upgrade works is…Published value£4,000,000
Phase 4 of the Royal Bournemouth Hospital electrical infrastructure upgrade works is to provide new incoming electrical capacity to the Wessex Fields site to the east of the existing Healthcare site. This capacity is required to allow both redevelopment projects already in progress and some of those planned by the Trust for the next fifteen years.<br/><br/>The Trust have secured 10MVA of capacity on a n+1 basis from the SSEN network in 2022, with two 11kV 630A feeders referenced E5 and E6, confirmed from Boscombe East primary. This proposal was accepted by the Trust and SSEN in October 2022 with a partial payment of the non-contestable elements already paid by the Trust.<br/><br/>The ICP / IDNO shall install the new Path A / Path B parallel 11kV feeder cables, from Boscombe East primary substation to a new secondary substation on Wessex Fields. This substation will be referenced Bournemouth Hospital North ISS. The ICP/IDNO will be required to provide all necessary design proposals for SSEN and UHD acceptance prior to commencing works and will do so without delay or provide any reason for SSEN withdrawal of capacity.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Price
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 15 Aug 2023, 09:26 BST
- Last source update
- 5 Feb 2024, 11:22 GMT
- Award evaluation window
- 5 Feb 2024 – …
- FTS notice number
2024/S 000-003661- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03efbcFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
Official noticeTender documents are also served through a separate tool: https://health-family.force.com/s/Welcome ↗
- Submission deadline
- 13 Feb 2024, 14:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Bids opened
- 5 Feb 2024, 14:00 GMT
Timeline
11 Sept 2023 → 16 Apr 2024 · 5 dates- Next notice expected11 Sept 2023, 00:00 BST
- Notice published5 Feb 2024, 11:22 GMT
- Bids opened5 Feb 2024, 14:00 GMT
- Submission deadline13 Feb 2024, 14:00 GMT
- Contract starts16 Apr 2024, 00:00 BST
Notice history
4 events · 3 releases on Find a Tender · since 18 Dec 2023- Published value updated to £4,000,00018 Dec 2023, 14:44 GMTwas £15,000,000
- Status changed to active18 Dec 2023, 14:44 GMT
- Procurement method changed18 Dec 2023, 14:44 GMT
- Deadline published: 5 Feb 2024, 14:00 GMT18 Dec 2023, 14:44 GMT
Published amendments (1 · 2 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | DeadlineIV.2.2.1 | 5 Feb 2024 | 13 Feb 2024 | +9 d |
| — | DeadlineIV.2.2.1 | 5 Feb 2024 | 13 Feb 2024 | +9 d |
1 amendment published without a description.
Contracting authority & participating public bodies
Dispute resolution & review bodies
- The High CourtReview body
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.