Find a Tender
planned
Official procurement procedure
Procurement of Contractor(s) to design and build new gas-compression asset project(s) at National Gas Transmission sites: (LOT1) Wormington Compressor Site; (LOT2) St Fergus Terminal
Construction work for the oil and gas industry
UK
Published value
£120,000,000
Submission deadline Not published
Lots published2
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: NATIONAL GAS TRANSMISSION PLC: "Procurement of Contractor(s) to design and build new gas-compression asset project(s) at National Gas Transmission sites: (LOT1) Wormington Compressor Site; (LOT2) St Fergus Terminal". Published status: planned. Published value: £120,000,000. 2 published lots. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | NATIONAL GAS TRANSMISSION PLC | Scope & Categories | Not published | Submission Window | planned No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £120,000,000 |
Bidder Intelligence · Authority Profile: NATIONAL GAS TRANSMISSION PLC
Market Analytics
Derived from OCDS awards & bid statistics
Published history for NATIONAL GAS TRANSMISSION PLC. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 1 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNATIONAL GAS TRANSMISSION PLC | Procedure methodNot published | Procurement categoryNot published |
Statusplanned | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published2 Apr 2024, 13:07 BST | Last source update2 Apr 2024, 13:07 BST | Recurring procurementNot published |
ClassificationConstruction work for the oil and gas industry | ||
Delivery area UK | ||
OCIDocds-h6vhtk-044ed0 | ||
What is being bought
Following the RIIO-2 Re-opener mechanism submitted to Ofgem and their subsequent Compressor Emissions Final Option Selection, National Gas Transmission (NGT) intends to invite suitable Economic Operators to pre-qualify and tender for the delivery of new compressor installation projects at high-pressure gas compression sites. The procurements relate to two UK locations, Wormington Compressor Site and St Fergus Terminal to ensure compliance with MCPD legislation (Medium Combustion Plant Directive) by 2030. The purpose of this PIN is to alert the market of National Gas Transmission's intention to formally commence procurement using lots (one for each location), subject to the further issue of a Contract Notice under UCR (2016).
What changed
From the official release history
- Published value updated to £120,000,000
2 Apr 2024, 13:07 BST - Status changed to planned
2 Apr 2024, 13:07 BST - Official notice release published
2 Apr 2024, 13:07 BST - Buyer information updated
2 Apr 2024, 13:07 BST
Lots and requirements (2)
Published by the contracting authority
- Lot 1 · #1WormingtonplannedPublished valueNot publishedNational Gas Transmission (NGT) intends to invite interest from suitable Economic Operators to pre-qualify and tender for the delivery of new compressor installation at high-pressure gas compression sites. The procurement relates to new compressor installation required at Wormington Compressor Site to ensure compliance with MCPD legislation (Medium Combustion Plant Directive) by 2030. The procurement will consist of a pre-qualification of Applicants, shortlisting those to be invited to tender for lots and then a competitive tender of those shortlisted for each lot. The future works will include but not be limited to; early feasibility design, detailed design, engineering procurement, construction and commissioning of *1 new compressor unit at Wormington. New compressor train equipment will be procured separately by National Gas Transmission and free-issued to the installation contractors procured via this procurement event. Following the completion of the tender evaluation period, Contracts will be awarded for the Works (Design-and-Build) to the successful Contractor(s) LOT 1 for Wormington. Additional information: *National Gas Transmission reserve the right to include an additional new compressor train in the scope of Wormington Compressor Site - increasing the requirement from one new unit to two new units at Wormington. This is predicated on further development and agreement from National Gas Transmission and the Energy Regulator (Ofgem). Economic Operators who participate in the procurement and successfully pre-qualify for the future contract works at Wormington will also be deemed to have pre-qualified to be invited to tender for the additional (second) unit works if National Gas Transmission and Ofgem agree to progress that additional scope in the future as part of these works at Wormington.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
- Lot 2 · #2St FergusplannedPublished valueNot publishedNational Gas Transmission (NGT) intends to invite interest from suitable Economic Operators to pre-qualify and tender for the delivery of new compressor installation at high-pressure gas compression sites. The procurement relates to new compressor installation required at St Fergus Terminal to ensure compliance with MCPD legislation (Medium Combustion Plant Directive) by 2030. The procurement will consist of a pre-qualification of Applicants, shortlisting those to be invited to tender for lots and then a competitive tender of those shortlisted for each lot. The future works will include but not be limited to; early feasibility design, detailed design, engineering procurement, construction and commissioning of 3 new compressor unit(s) at St Fergus. New compressor train equipment will be procured separately by National Gas Transmission and free-issued to the installation contractors procured via this procurement event. Following the completion of the tender evaluation period, Contracts will be awarded for the Works (Design-and-Build) to the successful Contractor for LOT 2 St Fergus.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
2 Apr 2024, 13:07 BST
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
NATIONAL GAS TRANSMISSION PLC
Contracting authority GB-COH-02006000Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published