Official UK procurement notice
Procurement of a Contractor for the replacement of Diesel Rotary Uninterrupted Power Supply (DRUPS) at two FCDO UK locations
Authority: Foreign, Commonwealth and Development Office (Central government)
What is being bought2 lots · detail below
Published requirement descriptionThe Foreign Commonwealth and Development Office (“FCDO”) intend to engage the market in relation to this project as part of market engagement activity in accordance with Regulation 40 of the Public Contracts Regulations 2015. The purpose of this PIN is to initiate market engagement and is not being used as a call for competition. This PIN is intended to:
- Engage with and inform the market of the FCDO’s requirements, enabling potential contractors to better understand the scope of the requirement and the approach to the procurement process; and
- Provide detail of the market engagement event which will be hosted online on 28 June 2024 date may be subject to change. Details on how to register for this event is provided in section VI.3 (Additional Information). Please refer to section II.2.4 Description of the Procurement for details in relation to the requirement.
CPV: Construction work · Installation services of electrical and mechanical equipment · Installation services of electrical equipment · Installation services of electricity distribution and control equipment · Installation services of mechanical equipment
Lots and requirements (2)Procurement structure
2 lots · no lot values published · win at most 2 of themLot #1DRUPS replacement - King Charles StreetPlanned
Resilience of power supply to King Charles Street (KCS). The operation of all the departments and services located at KCS requires electrical power for the most critical of systems to be provided without interruption.
This project seeks to change the existing DRUPS critical electrical infrastructure to:
- In the case of KCS a UPS that provides power via a battery system that provides power to the NO BREAK assets.
- Diesel generators that provides power to SHORT BREAK & NO BREAK assets power demands.
The works involves the removal of existing diesel rotary uninterruptible power supplies (DRUPS) and the replacement of them with traditional diesel generators and uninterruptible power supply (UPS) system’s along with the supporting cabled infrastructure, fire protection & detection, mechanical cooling services, control and monitoring system
Activity to Date
Based on the primary and critical recommendations of an initial condition assessment, a feasibility study was conducted in April 2021 as a follow-on activity from the initial electrical infrastructure assessment. Within this feasibility exercise was an intrusive load assessment of the key power nodes of the site to ascertain the sizing requirements of the additional generator and support systems.
An initial stage 3 design was completed in June 2022 based on the recommendations of the preceding feasibility study.
A peer review was then conducted by FCDO MEP leadership team, following this peer review the design was then updated to incorporate the comments made to enhance the central 11kV switchgear and central generator provision. Design to RIBA stage 3 on this revised scheme has now been completed.
The procurement of the Contractor will be a Restricted above threshold tender procedure. We are exploring options to run the procurement as a ‘lotted’ structure and have the market bid for one or both projects. The recommended route to market is a 2 stage Design and Build from RIBA 4 onwards. These aspects of the project will be further explored in the market engagement exercise.
The FCDO are looking for Contractors with experience in this specialist field and with a proven track record of projects dealing with key critical infrastructure of this nature and this scale.
Case studies and in-house technical expertise will need to be demonstrated in terms of scale, technology and similar critical environments (e.g. financial, Government, or data centre)
Lot #2DRUPS replacement - Hanslope Park, Milton KeynesPlanned
Resilience of power supply to Hanslope Park (HSP). The operation of all the departments and services located at HSP requires electrical power for the most critical of systems to be provided without interruption.
This project seeks to change the existing DRUPS critical electrical infrastructure to:
- A BESS system that provides stored power to the NO BREAK assets via battery technology.
- A diesel generator that provides power to SHORT BREAK & NO BREAK assets power demands
- Install 2 new 11kV switchgear panels with modern intelligent controls. The existing main electrical building will be extended.
- New mechanical cooling provided to the four main data rooms in building 38 with free cooling for energy savings.
The works involve the removal of existing DRUPS and the replacement of them with traditional diesel generators and battery energy storage system’s (BESS) along with the supporting cabled infrastructure, fire protection & detection, mechanical cooling services, PLC control and monitoring system. Additionally, a new 11kV central facility will be constructed and installed as part of these works, and a new critical cooling system to one of the data centre buildings on campus
Activity to Date
Based on the primary and critical recommendations of an initial condition assessment, a feasibility study was conducted in April 2021 as a follow-on activity from the initial electrical infrastructure assessment. Within this feasibility exercise was an intrusive load assessment of the key power nodes of the site to ascertain the sizing requirements of the additional generator and support systems.
An initial stage 3 design was completed in June 2022 based on the recommendations of the preceding feasibility study.
A peer review was then conducted by FCDO MEP leadership team, following this peer review the design was then updated to incorporate the comments made to enhance the central 11kV switchgear and central generator provision. Design to RIBA stage 3 on this revised scheme has now been completed.
The procurement of the Contractor will be a Restricted above threshold tender procedure. We are exploring options to run the procurement as a ‘lotted’ structure and have the market bid for one or both projects. The recommended route to market is a 2 stage Design and Build from RIBA 4 onwards. These aspects of the project will be further explored in the market engagement exercise.
The FCDO are looking for Contractors with experience in this specialist field and with a proven track record of projects dealing with key critical infrastructure of this nature and this scale.
Case studies and in-house technical expertise will need to be demonstrated in terms of scale, technology and similar critical environments (e.g. financial, Government, or data centre)
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 14 Jun 2024, 14:23 BST
- Last source update
- 14 Jun 2024, 14:23 BST
- Authority reference
ESND-10915 -2024- FTS notice number
2024/S 000-018476- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-047019Find a Tender
Publisher note: This notice is being published to advertise a forthcoming early market engagement webinar, which will be held on 28 June 2024. The Webinar is scheduled for a 10:30am start and will last approximately 1 hour. Suppliers wishing to attend the forthcoming market engagement event should register their interest by email to [email protected]. You will be sent details of the event and how to join. For the avoidance of doubt, this market approach is not part of a formal procurement process. The FCDO reserves the right to change the process at any stage and to undertake this procurement using alternative routes. Participation or non-participation in this market engagement exercise shall not prevent any supplier participating in the future procurement, nor is it intended that any information supplied as part of this exercise shall place any supplier at an advantage in a procurement process. No formal assessment of capability or down selection of bidders will be carried out in relation to any responses received as a result of this. The requirement will be procured via the Foreign, Commonwealth and Development Office's e-procurement portal: https://fcdo.bravosolution.co.uk. Suppliers, not currently registered on the portal, who are interested in being considered for this opportunity must self-register on the site in order to participate in the tender when published — registration is free and instantaneous.
How it was run
Official notice- Submission deadline
- —
Timeline
14 Jun 2024 → 10 Jul 2024 · 2 dates- Notice published14 Jun 2024, 14:23 BST
- Tender notice expected10 Jul 2024, 00:00 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies