Find a TenderOpen admission Tender notice
Published 2 Nov 2026, 16:02 GMT

Official UK procurement notice

PRO005185-Works-Framework-Rainwater Solutions · UK public procurement notice

Authority: United Utilities Water Limited (Public body)

Framework agreementWorksCompetitive flexible procedureAbove thresholdUtilitiesSME suitableAccelerated
Framework ceiling (notional)£40,000,000framework ceiling, not attributable revenue
Admission open until 16 Nov 202614:00 GMT · period end, not a bid countdown
Clarification cut-off 6 Nov 202617:00 GMT · questions to the authority
Framework period 1 yrends 3 Dec 2027 · up to 3 May 2028 with extensions · starts 4 Dec 2026
Notice summaryFrom the published notice

United Utilities' (UU) Rainwater Management Strategy is founded on Sustainable Drainage principles, which prioritise the capture, reuse and management of rainwater as close as possible to where it falls. The strategy promotes the use of surface conveyance, infiltration, disconnection and attenuation to slow the movement of water through the catchment and reduce pressure on the wastewater network. The framework will provide access to suppliers capable of undertaking both Design & Build and Build Only delivery of Rainwater Management solutions and will generate valuable insight into supplier capability, capacity, performance and delivery approaches to inform future procurement arrangements supporting the wider AMP8 and AMP9 programme.

What is being bought

Published requirement description

United Utilities' (UU) Rainwater Management Strategy is founded on Sustainable Drainage principles, which prioritise the capture, reuse and management of rainwater as close as possible to where it falls. The strategy promotes the use of surface conveyance, infiltration, disconnection and attenuation to slow the movement of water through the catchment and reduce pressure on the wastewater network. We are looking to appoint 5 partners to support the delivery of Rainwater Solutions over the next 12 to 18 months. This framework forms an interim procurement solution to support with immediate AMP8 delivery requirements whilst United Utilities develops its longer-term Rainwater Management delivery model. The framework will provide access to suppliers capable of undertaking both Design & Build and Build Only delivery of Rainwater Management solutions and will generate valuable insight into supplier capability, capacity, performance and delivery approaches to inform future procurement arrangements supporting the wider AMP8 and AMP9 programme. The Rainwater Solutions Framework will support a combination of Design & Build and Build Only commissions, with the procurement delivery route determined on a scheme-by-scheme basis depending on programme requirements, complexity and design maturity

  • How the procedure runs: Single stage ITT tender process assessing both commercial and technical approaches.

CPV: Construction work for water projects · Drainage and surface works · Engineering works and construction works · Environmental improvement works · Ground-drainage work

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 5 suppliers
Framework period
1 yr · up to 1 yr 5 mo from 4 Dec 2026
Published description of the framework

Work allocation to be based on Direct Award, Mini Competition and Work Packages.

The lotProcurement structure

single lot · value published
Lot #1Renewal 1 yrSMEPublished value£40,000,000
Contract period: 4 Dec 2026 – 3 Dec 2027 (1 yr) · up to 3 May 2028 with extensionsValue: £40,000,000 exc. VAT · £50,000,000 inc. VAT
Delivery: North WestEligibility: SME eligible
Extensions: Initial term of 12 months with the option to extend by a further 6 months.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Pass minimum criteria set out in the ITT Document

  • Technical & professional ability

    Pass minimum criteria set out in the ITT Document

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids are scored
Quality: 50%Price: 50%
Published sub-criteria (2)
  • Technical: 50%
  • Commercial: 50%
Published award criteria (2)
  • Commercial: 50%
  • Technical: 50%
Conditions of participation2
  • Economic & financial standing

    Pass minimum criteria set out in the ITT Document

  • Technical & professional ability

    Pass minimum criteria set out in the ITT Document

What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “PRO005185-Works-Framework-Rainwater Solutions” is a framework: the contest is a place on its panel, up to 5 suppliers, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Competition analysis · published record, not a forecast of who will bid

How United Utilities Water Limited buys Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523), and who usually turns up

United Utilities Water Limited’s published record next to the market for the same work. Compared with other frameworks and DPS only. Whole-market view: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 44 of 69 known-size awards · market: CPV 4523 · North West England, n=45
64%64%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered. The market figure counts awards delivered in North West England.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 37 of 60 known-location awards · market: CPV 4523 · North West England, n=47
62%68%

Most of this buyer’s recorded winners were registered in the region where that award was delivered.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 13 decided notices · market: CPV 4523 · North West England, n=9
110 days147 days

Half of these awards have an award date within 110 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

Both shares are minimums: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: at least 3 of 21 procurements with awards had no recorded rival · market: CPV 4523 · North West England, n=9
14%11%

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer9 lots with bid counts · all categories
0% had one bid
The market22 lots with bid counts · CPV 4523 · North West England
5% had one bid
Buyer / market · select a colour for counts
1 bid0% / 5%
Buyer: 0 of 9 lots with published bid counts. Market: 1 of 22 lots with published bid counts.
2–30% / 18%
Buyer: 0 of 9 lots with published bid counts. Market: 4 of 22 lots with published bid counts.
4–678% / 9%
Buyer: 7 of 9 lots with published bid counts. Market: 2 of 22 lots with published bid counts.
7+22% / 68%
Buyer: 2 of 9 lots with published bid counts. Market: 15 of 22 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS: the price is set later, on each call-off.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 4512 monthsSME suitablePublished estimate£40m

This lot lists more than one class in CPV 45. The comparison uses that group.

Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

5expected bids0% chance of a single bid
similar past contests in this category: 18
Forecast chances for this lot
1 bid0%
Chance this lot gets 1 bid: 0%. This is a forecast.
2–313%
Chance this lot gets 2–3: 13%. This is a forecast.
4–669%
Chance this lot gets 4–6: 69%. This is a forecast.
7+18%
Chance this lot gets 7+: 18%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

SupplierThis buyer’s earlier contractLotAward valueWhy listed
J Murphy and Sons LimitedWorked for this buyerPRO004736-Works-Framework-Build Onlynotice published Dec 2024Non-Infrastructure—Similar wording and category
Avove LimitedWorked for this buyerPRO004736-Works-Framework-Build Onlynotice published Dec 2024Non-Infrastructure—Similar wording and category
Stonbury LimitedWorked for this buyerPRO004736-Works-Framework-Build Onlynotice published Dec 2024Non-Infrastructure—Similar wording and category
Lagan Aviation & Infrastructure LtdWorked for this buyerPRO004736-Works-Framework-Build Onlynotice published Dec 2024Non-Infrastructure—Similar wording and category
Costain LimitedWorked for this buyerPRO004736-Works-Framework-Build Onlynotice published Dec 2024Non-Infrastructure—Similar wording and category

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
23 panel places
£336m37 awards in 36m · last 2 months ago4 live · £59m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=1
8 panel places
£213m12 awards in 36m · last 2 months ago3 live · £101m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

8% above n=2
9 panel places
£168k12 awards in 36m · last 2 months ago2 live · £168k
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
8 panel places
£1.3m14 awards in 36m · last 10 months ago1 live
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
3 panel places
4 awards in 36m · last 17 months ago1 live
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Open admission
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
2 Nov 2026, 16:02 GMT
Last source update
2 Nov 2026, 16:02 GMT
Award evaluation window
Submission end – 1 Dec 2026
Authority reference
PRO005185
FTS notice number
2026/S 000-103882
Accelerated
State of urgency
Latest notice
Tender notice (UK4)
Classification (CPV)
Construction work for water projectsDrainage and surface worksEngineering works and construction worksEnvironmental improvement worksGround-drainage work
Delivery area
North West (UKD)
Official registry OCID
ocds-h6vhtk-0795ea Find a Tender
How it runs

Single stage ITT tender process assessing both commercial and technical approaches.

How to participate & submission route

Official notice Apply via EU-Supply (CTM)
Submission portal named on this notice: EU-Supply (CTM) · Who buys & how to bid on EU-Supply
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free · 5–10 minutes
Requests to participate (first stage)
—
Appointment period ends
16 Nov 2026, 14:00 GMT
Clarification deadline
6 Nov 2026, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

2 Nov 2026 → 4 Dec 2026 · 5 dates
  1. Tender notice published10h ago
    2 Nov 2026, 16:02 GMT
  2. Today
    3 Nov 2026
  3. Clarification questions byin 3 days
    6 Nov 2026, 17:00 GMT
  4. Admission / appointment period endsin 13 days · period end, not a bid countdown
    16 Nov 2026, 14:00 GMT
  5. Award decision expected byin 28 days
    1 Dec 2026, 23:59 GMT
  6. Contract startsin 30 days
    4 Dec 2026

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    2 Nov 2026, 16:02 GMT
    UK4

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

United Utilities Water Limited

Contracting authorityPrivate utility GB-PPON: PVVB-5589-BWHX Lingley Mere Business Park, Warrington, North West, WA5 3LPContact name, email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender