PRO004606 - Works - Lostock WTW Filter Refurbishment
Drinking-water treatment plant construction work
Water-treatment plant construction work
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: United Utilities Water Limited: "PRO004606 - Works - Lostock WTW Filter Refurbishment". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | United Utilities Water Limited | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: United Utilities Water Limited
Market Analytics
Derived from OCDS awards & bid statistics
Published history for United Utilities Water Limited. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
14.7Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 255 active published awards; 50 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityUnited Utilities Water Limited | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published12 May 2023, 12:24 BST | Last source update12 May 2023, 12:24 BST | Recurring procurementNot published |
ClassificationDrinking-water treatment plant construction work, Water-treatment plant construction work | ||
Delivery area | ||
OCIDocds-h6vhtk-034dd8 | ||
What is being bought
The works consists of the design, construction and commissioning of the following at Lostock WTW
Refurbishment of the concrete structure and replacement of the filter plenum floor of 2 No. current rapid gravity filters (Filters 7 and 8) to prevent erosion of exposed surfaces, prevent water quality deterioration, and ensure satisfactory performance of the filter underdrains.
Replacement of the steel plenum floors and air scour pipework system of 4 No. steel rapid gravity filters to prevent water quality deterioration, and ensure satisfactory performance of the filter underdrains.
Topping up of anthracite media in 8 No. Filters final depth required 400mm (as per the Employer’s Standard Operating Procedure).
Provision of 2no stainless steel access ladders in each of the concrete construction rapid gravity filters
Replacement of the Clean Backwash Water Control Valve LKA-WW-VA007 (A5/AV6062) for the 6 No. steel rapid gravity filters
What changed
From the official release history
- tender value changed
12 May 2023, 12:24 BST - Status changed to complete
12 May 2023, 12:24 BST - Official notice release published
12 May 2023, 12:24 BST - Submission deadline changed to published date
12 May 2023, 12:24 BST - Published value updated to £5,000,000
4 Jul 2022, 17:41 BST - Status changed to active
4 Jul 2022, 17:41 BST - Official notice release published
4 Jul 2022, 17:41 BST - Submission deadline changed to 2 Aug 2022, 15:00 BST
4 Jul 2022, 17:41 BST - Buyer information updated
4 Jul 2022, 17:41 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedThe works consists of the design, construction and commissioning of the following at Lostock WTW Refurbishment of the concrete structure and replacement of the filter plenum floor of 2 No. current rapid gravity filters (Filters 7 and 8) to prevent erosion of exposed surfaces, prevent water quality deterioration, and ensure satisfactory performance of the filter underdrains. Replacement of the steel plenum floors and air scour pipework system of 4 No. steel rapid gravity filters to prevent water quality deterioration, and ensure satisfactory performance of the filter underdrains. Topping up of anthracite media in 8 No. Filters final depth required 400mm (as per the Employer’s Standard Operating Procedure). Provision of 2no stainless steel access ladders in each of the concrete construction rapid gravity filters Replacement of the Clean Backwash Water Control Valve LKA-WW-VA007 (A5/AV6062) for the 6 No. steel rapid gravity filtersContract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
12 May 2023, 12:24 BST - Award active
Not published · Not published - Contract active
Signed 14 Apr 2023, 00:00 BST · Not published
Commercial outcome and competition
Awards Ross-shire Engineering Ltd Not published · Not published · active |
Contracts Lostock WTW Filter Refurbishment Not published · signed 14 Apr 2023, 00:00 BST · active |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
United Utilities Water Limited
Contracting authority GB-FTS-4736Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)