Find a TenderAwardedContract details notice
Published 22 May 2025, 14:24 BST

Official UK procurement notice

Operated Plant Framework · UK public procurement notice

Official notice

Authority: Cumberland Council (Local council)

Framework agreement5 lotsServicesOpen procedureAbove thresholdSME suitable
Framework ceiling (notional)£4,700,000total for 5 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 3 Nov 2025awarded 8 Dec 2025
Awarded to Cubby Construction Ltd +4 more5 awards
Framework period 4 yrsends 31 Dec 2029 · starts 1 Jan 2026

What is being bought5 lots · detail below

Published requirement description

The Council wishes to procure a framework for the hire of a range of operated plant to support an in-house delivery model of highway maintenance.

All plant must meet the appropriate requirements of the Specification set out in Schedule 4 of the framework agreement and the rates submitted must be inclusive of delivery and travel time to the local depot or to site and should include for all reasonable associated equipment such as a variety of buckets, trailers etc.

CPV: Hire of construction and civil engineering machinery and equipment with operator · Hire of industrial vehicles with driver · Road sweepers

How this framework works

From the published notice
Type
Closed framework
Call-offs
every call-off is a further competition among the appointed suppliers
Bids received
6 bids on the busiest of 4 lots · 5 suppliers appointed
Framework period
4 yrs from 1 Jan 2026
Published description of the framework

If a Framework User decides to hire Operated Plant through this Agreement it may order those Operated Plant set out in Schedule 3 of the framework agreement in accordance with the terms laid down in this Agreement and as more particularly described in clauses 8.2 to 8.7.

8.2 The Framework User shall identify the highest ranked supplier for the item(s) the Framework User wishes to order using the following approach:

8.2.1 The Framework User identifies the relevant Lot based on location within which the Plant is required and the relevant Sub-lot based on the item(s) of plant required.

8.2.2 Subject to Schedule 7 and any suspensions issued under it, the Framework User issues, to all suppliers on the identified Sub-lot, a notice outlining the item(s) of Plant required, the start date, delivery location and the duration of the order.

8.2.3 The notice shall identify the number of days within which the suppliers need to respond. Failure to respond by the specified date means a supplier will not be considered.

8.2.4 Suppliers in their responses must confirm the availability of the identified Plant and include the Proposed Operator's Detail for each item of Plant required.

8.2.5 The score for the supplier for each specific order is identified by adding the Operator Assessment Score and the Price Score and then multiplying the total by the KPI Factor.

8.2.6 The Proposed Operator's Detail is assessed by the Framework User in line with the Operator Assessment Scoring in order to produce an Operator Assessment Score.

8.2.7 The price for the item(s) of plant is taken from Schedule 4 of the Agreement and the price score is calculated using the formula; (lowest cost / cost) * maximum possible score (600).

8.2.8 The KPI Factor is taken from the latest KPI score available at the date of the response. If no KPI score is available the KPI score is assumed as 100.

8.2.9 The supplier with the highest overall score is awarded the Order.

8.3 The Authorised Officer shall issue the Order to the highest ranked supplier, identified by the process outlined at 8.2;

8.4 The Order issued constitutes an offer by the Framework User to hire the Operated Plant identified in accordance with this Agreement.

8.5 Following receipt of an Order, the Supplier shall in the period determined by the Framework User and notified to the Supplier in writing at the same time as the submission of the Order or, in the absence of such notification, within one (1) Business Day of the

date of the Order acknowledge receipt of the Order and either:

8.5.1 notify the Framework User that it declines to accept the Order; or

8.5.2 notify the Framework User that it accepts the Order by signing and returning the Order.

8.6 If the Supplier:

8.6.1 notifies the Framework User that it declines to accept an Order; or

8.6.2 fails to accept the Order in the time-limit referred to in clause 8.5

then the offer from the Framework User to the Supplier shall lapse.

8.7 Where the supplier first approached by the Framework User (as appropriate) under clause 8.2 does not accept an Order or clause 8.4 applies, the Framework User may, at its utmost discretion approach the next highest ranked supplier within the relevant Lot, repeat the process or enter into appropriate arrangements with other suppliers outside of the Agreement.

Lots and requirements (5)Procurement structure

5 lots · all with a published value · same evaluation weights on every lot

Every one of these 5 lots carries the same published figure, £4,700,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Lot A - General WagonsAwarded 4 yrsSMEceiling above

Operated - 18 Tonne G.V.W Tipper - Insulated

Operated - 18 Tonne G.V.W Tipper

Operated - 7.5 Tonne G.V.W Tipper

Operated - 26 Tonne G.V.W Tipper

Operated - 26 Tonne G.V.W Tipper - Insulated

Operated - 18 Tonne G.V.W Tipper c/w hiab Clam Shell Bucket

Operated - 26 Tonne G.V.W Tipper c/w hiab Clam Shell Bucket

Operated - 3 cubic meter capacity Gritter

Operated - 6 cubic meter capacity Gritter (With plough as an addition )

Operated - 9 cubic meter capacity Gritter (with plough as an addition )

Operated - 4 Tonne Hotbox

Operated - 9 Tonne Hotbox

Operated - 18 Tonne Hotbox

Operated - 26 Tonne Hotbox

Operated - Articulated Tipper

Operated - Articulated Low Loader

Contract period: 1 Jan 2026 – 31 Dec 2029 (4 yrs)
Delivery: North WestEligibility: SME eligible
Authority reference: A
Lot #2Lot B - Tractor, Loaders & ExcavatorsAwarded 4 yrsSMEceiling above

Operated - Tractor Loader Digger 3CX

Operated - Cold Planing Machine - 0.25m - 0.30m Drum

Operated - Tractor Loader Digger 4CX

Operated - 5.0 Tonne Mini Hydraulic Excavator (Tracked)

Operated - Pecker Attachment to fit 5.0 Tonne Mini Hydraulic Excavator

Operated - Pecker Attachment to fit Tractor Loader Digger 3CX

Operated - Pecker Attachment to fit Tractor Loader Digger 4CX

Operated - 1.5 Tonne Mini Hydraulic Excavator (Tracked)

Operated - Pecker Attachment to fit 1.5 Tonne Mini Hydraulic Excavator

Operated - 2.5 Tonne Mini Hydraulic Excavator (Tracked)

Operated - Pecker Attachment to fit 2.5 Tonne Mini Hydraulic Excavator

Operated - 7 Tonne Mini Hydraulic Excavator (Tracked)

Operated - Pecker Attachment to fit 7 Tonne Mini Hydraulic Excavator

Operated - 12 Tonne Standard Hydraulic Excavator (Tracked)

Operated - Pecker Attachment to fit 12.0 Tonne Standard Hydraulic Excavator

Operated - 20 Tonne Standard Hydraulic Excavator (Tracked)

Operated - Pecker Attachment to fit 20 Tonne Standard Hydraulic Excavator

Operated - Dumper 1 Tonne High lift

Opearted - Dumper 3 Tonne

Operated - Dumper 6 Tonne

Operated - Dumper 9 Tonne

Contract period: 1 Jan 2026 – 31 Dec 2029 (4 yrs)
Delivery: North WestEligibility: SME eligible
Lot #3Lot C - Road SweepersAwarded 4 yrsSMEceiling above

Operated - Standard Road Sweeper (over 10t)

Operated - Dual Road Sweeper (over 10t)

Operated - Standard Road Sweeper (under 10t)

Operated - Dual Road Sweeper (under 10t)

Contract period: 1 Jan 2026 – 31 Dec 2029 (4 yrs)
Delivery: North WestEligibility: SME eligible
Lot #4Lot D - Road Surfacing EquipmentAwarded 4 yrsSMEceiling above

Operated - Paving Machine Up to 2.5m Width

Operated - Paving Machine Up to 5.0m

Operated - Cold Mining Machine Up to 0.5m Width

Operated - Cold Mining Machine Up to 1.0m Width

Operated - Cold Mining Machine Over 1.0m Width

Operated - 120 Roller

Operated - 90 Roller

Operated - 3 Pin Roller

Operated - Bond Coat Sprayer

Operated - Loading Shovel

Contract period: 1 Jan 2026 – 31 Dec 2029 (4 yrs)
Delivery: North WestEligibility: SME eligible
Lot #5Lot E - Drain Cleaning EquipmentAwarded 4 yrsSMEceiling above

Operated - Gully Tanker Up to 18t (Driver & Operator)

Operated - Vactor Unit (Driver & Operator)

Operated - Recycling Unit (Driver & Operator)

Contract period: 1 Jan 2026 – 31 Dec 2029 (4 yrs)
Delivery: North WestEligibility: SME eligible

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 5 lots
Quality: 30%Price: 60%Social value: 10%
Published award criteria (3)
  • Price
  • Quality
  • Social Value
Lot distribution rule: Suppliers can bid for one or more than one or all lots. Each lot will be evaluated separately as per the Evaluation Criteria. Suppliers may be restricted to the number lots they are accepted onto based on their capacity. All suppliers will be ranked based on a price quality assessment. Rankings will be reviewed bi-annually based on actual performance assessed through KPI scores.
What this means for your bid
  • Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Operated Plant Framework” is a framework: the contest is a place on its panel, not a single contract: each call-off is a further competition, so the pricing contest starts after appointment.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
22 May 2025, 14:24 BST
Last source update
29 Jan 2026, 09:54 GMT
Award evaluation window
Submission end – 28 Nov 2025
Authority reference
DN792231
FTS notice number
2025/S 000-062639
Latest notice
Contract details notice (UK7)
Classification (CPV)
Hire of construction and civil engineering machinery and equipment with operatorHire of industrial vehicles with driverRoad sweepers
Delivery area
North West (UKD1)
Official registry OCID
ocds-h6vhtk-051e22 Find a Tender

How it was run

Official notice
Appointment period ends
3 Nov 2025, 12:00 GMT
Clarification deadline
17 Oct 2025, 12:00 BST
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Suppliers wishing to express an interest and obtain access to the tender documents should go to www.the-chest.org.uk ↗ and click on current opportunities from the navigation area on the left of the screen. On the next screen enter the contract Reference (DN792231) in the box labelled 'contains' then click search. Click on the Blue link for the contract title to view the opportunity.

To express an interest you will need to login. If you are not already registered on the www.the-chest.org.uk ↗ you will need to return to the home page and click on Register. Register free link in the navigation area on the left of the screen. Registration is free of charge and your username and password will be emailed to you.

Timeline

22 May 2025 → 29 Jan 2026 · 10 dates
  1. Planning notice published
    22 May 2025, 14:24 BST
  2. Next notice expected
    1 Jul 2025, 23:59 BST
  3. Tender notice published383 days ago
    6 Oct 2025, 16:46 BST
  4. Clarification questions by372 days ago
    17 Oct 2025, 12:00 BST
  5. Admission / appointment period ends355 days ago · period end, not a bid countdown
    3 Nov 2025, 12:00 GMT
  6. Award decision expected by330 days ago
    28 Nov 2025, 23:59 GMT
  7. Assessment summaries sent318 days ago
    11 Dec 2025
  8. Standstill ends306 days ago
    22 Dec 2025, 23:59 GMT
  9. Contract starts297 days ago
    1 Jan 2026
  10. Latest notice published268 days ago
    29 Jan 2026, 09:54 GMT

Notice history

11 events · 5 releases on Find a Tender · since 22 May 2025
  1. Pipeline notice published
    22 May 2025, 14:24 BST
    UK1
  2. Tender notice published
    6 Oct 2025, 16:46 BST
    UK4
  3. Published value updated to £4,700,000
    6 Oct 2025, 16:46 BST
    was £10,000,000
  4. Status changed to active
    6 Oct 2025, 16:46 BST
  5. Procurement method changed
    6 Oct 2025, 16:46 BST
  6. Deadline published: 3 Nov 2025, 12:00 GMT
    6 Oct 2025, 16:46 BST
  7. Tender notice published
    6 Oct 2025, 16:53 BST
    UK4
  8. Contract award notice published
    11 Dec 2025, 12:43 GMT
    UK6
  9. Status changed to complete
    11 Dec 2025, 12:43 GMT
  10. Contract signature expected
    29 Dec 2025, 23:59 GMT
    scheduled
  11. Contract details notice published
    29 Jan 2026, 09:54 GMT
    UK7
Published amendments (1)

End date of framework updated

Routine re-releases (5)
  • 2025-10: 1 release · 6 Oct 2025
  • 2025-05: 1 release · 22 May 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 55 awards · see the list ↓
Bids received 65 from SMEs · busiest of 4 lots
Contracts signed 4latest 27 Jan 2026

£1,400,000 is the framework's published maximum, restated by the publisher on 3 award rows. It is one ceiling, not 3 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Lot A - General Wagons1 award
Cubby Construction LtdSME, DSD Construction Ltd, G Lund LtdSME, John Elliot LtdSMELot A (Wagons)1 Jan 2026 – 31 Dec 2029ceiling above8 Dec 2025Awarded
Lot 2 · Lot B - Tractor, Loaders & Excavators1 award
DSD Construction Ltd, G Lund LtdSME, John Elliot LtdSMELot B (Loaders & Excavators)1 Jan 2026 – 31 Dec 2029ceiling above8 Dec 2025Awarded
Lot 3 · Lot C - Road Sweepers1 award
DSD Construction Ltd, John Elliot LtdSMELot C (Sweepers)1 Jan 2026 – 31 Dec 2030£320,0008 Dec 2025Awarded
Lot 4 · Lot D - Road Surfacing Equipment1 award
Cubby Construction LtdSME, DSD Construction Ltd, Metcalfe Plant Hire LimitedSMELot D (Road Surface Equipment)1 Jan 2026 – 31 Dec 2029ceiling above8 Dec 2025Awarded
Lot 5 · Lot E - Drain Cleaning Equipment1 award
supplier not published—8 Dec 2025Awarded

Contracts

All 3 of these contracts carry the same published figure, £1,400,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Lot A - General Wagons4final-stage tenders40—
2 · Lot B - Tractor, Loaders & Excavators6final-stage tenders50—
3 · Lot C - Road Sweepers2final-stage tenders20—
4 · Lot D - Road Surfacing Equipment3final-stage tenders30—

Contracting authority & participating public bodies

Cumberland Council

Contracting authorityPublic authority - sub-central government GB-PPON: PJGX-9191-DYLV Cumbria House, 107-117 Botchergate, Carlisle, North West, CA1 1RDContact email

Framework contractors & participating bidders

5 commercial parties on the notice
  • CUBBY CONSTRUCTION LIMITEDFramework contractorGB-COH: 02641120GB-PPON: PRMB-5372-CPNX Units H And L Knights Drive, Carlisle, North West, CA6 4SGContact email
  • DSD CONSTRUCTION LIMITEDFramework contractorGB-COH: 02818677GB-PPON: PVQR-5139-MJRW Dsd House Dukes Drive, Carlisle, North West, CA6 4SHContact email
  • G. LUND LIMITEDFramework contractorGB-COH: 03328984GB-PPON: PYXG-6353-XQNN The Ashes, Penrith, North West, CA10 3ALContact email
  • JOHN ELLIOT LIMITEDFramework contractorGB-COH: 02883276GB-PPON: PJDL-7473-HNXQ Great Clifton Farm, Workington Cumbria, North West, CA14 1TZContact email
  • METCALFE PLANT HIRE LIMITEDFramework contractorGB-COH: 02093086GB-PPON: PWHR-8785-JRHD Gilwilly Road, Penrith, North West, CA11 9BLContact email

Official documents & specifications (12)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
Show 4 more notices
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender