Find a Tender
complete
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: BURNLEY COLLEGE: "North Campus - Industry Hub". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | BURNLEY COLLEGE | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: BURNLEY COLLEGE
Market Analytics
Derived from OCDS awards & bid statistics
Published history for BURNLEY COLLEGE. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
1Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 1 active published awards; 1 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityBURNLEY COLLEGE | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published7 Jun 2023, 11:23 BST | Last source update7 Jun 2023, 11:23 BST | Recurring procurementNot published |
ClassificationConstruction work | ||
Delivery area | ||
OCIDocds-h6vhtk-0398ae | ||
What is being bought
This project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements.
The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information.
The Works will be instructed in two phases:
• Phase 1 being the delivery of the infrastructure and landscaping package only; and
• Phase 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building.
The proposed works noted under Phase 2, notably the construction of the new Industry Hub building will be dependent upon a successful funding applications.
What changed
From the official release history
- tender value changed
7 Jun 2023, 11:23 BST - Status changed to complete
7 Jun 2023, 11:23 BST - Official notice release published
7 Jun 2023, 11:23 BST - Submission deadline changed to published date
7 Jun 2023, 11:23 BST - Buyer information updated
7 Jun 2023, 11:23 BST - Published value updated to £10,000,000
18 Jan 2023, 18:00 GMT - Status changed to active
18 Jan 2023, 18:00 GMT - Official notice release published
18 Jan 2023, 18:00 GMT - Submission deadline changed to 1 Mar 2023, 12:00 GMT
18 Jan 2023, 18:00 GMT - Buyer information updated
18 Jan 2023, 18:00 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedIn late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension. The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known. Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings. Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College. At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct. The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus. There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature. Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond. The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023. The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT. The College has procured Project Team and Design Services to complete up to RIBA Stage 4. The following Design Disciplines are proposed to be novated to the Principal Contractor. • Architect (lead Designer) - ABW Architects • Landscape Designer - Milieu Landscape Design • Civil & Structural Engineering Consultants - Waterman Group.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
7 Jun 2023, 11:23 BST - Award active
Not published · Not published - Contract active
Signed 6 Jun 2023, 00:00 BST · £10,795,600
Commercial outcome and competition
Awards John Turner Construction Group Not published · Not published · active |
Contracts Contract £10,795,600 · signed 6 Jun 2023, 00:00 BST · active |
Bid statistics bids: 1 (lot 1) electronicBids: 1 (lot 1) |
Buyer and organisations in this procedure
BURNLEY COLLEGE
Contracting authority GB-UKPRN-10001000Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published