Find a TenderAwarded
Published 18 Jan 2023, 18:00 GMT

Official UK procurement notice

North Campus - Industry Hub

Official notice

Authority: BURNLEY COLLEGE (Education)·Consortium: 2 public authorities

WorksOpen procedure
Published estimate£10,000,000exc. VAT8% above published estimate
Submissions closed 1 Mar 2023awarded 6 Jun 2023
Awarded to John Turner Construction Group Limited

What is being bought

Published requirement description

This project comprises the development of the newly acquired North campus be developed to include: the construction of the new Industry Hub building; as well the construction of new infrastructure and landscaping elements.

The proposed works will be procured through a single stage Design & Build route, based on RIBA Stage 4 Design information.

The Works will be instructed in two phases:

  • Phase 1 being the delivery of the infrastructure and landscaping package only; and
  • Phase 2 being the delivery of the infrastructure and landscaping package, as well as the a new Industry Hub building.

The proposed works noted under Phase 2, notably the construction of the new Industry Hub building will be dependent upon a successful funding applications.

CPV: Architectural and related services · Building completion work · Building installation work · Construction work · Construction-related services · Engineering services · Hire of construction and civil engineering machinery and equipment with operator · Monitoring and control services · Site preparation work · Technical testing, analysis and consultancy services · Urban planning and landscape architectural services · Works for complete or part construction and civil engineering work

The lotProcurement structure

single lot · value published
Lot #1In late 2019, the College carried out a review of the campus and accommodation…AwardedPublished value£10,000,000

In late 2019, the College carried out a review of the campus and accommodation strategy, leading to a study for a strategic master plan in March 2020. The master plan identified a number of sites on the existing campus, including the teaching building and Sports building extension.

The land to the North of the existing site was identified as the ideal location for an extension to the campus and would provide the College with medium-long term development capacity, the" North Campus" as it has become known.

Instead of simply forming an extended version of the existing campus, the opportunity has been taken to re-think the character of a place for learning. Providing excellent teaching space is a pre-requisite, as is ensuring buildings have a low energy demand with low emissions leading towards net zero carbon is a key objective of the design. In complete contrast to the existing campus is the integration of green landscape space and buildings.

Although close to the town centre with its retail parks and car parks, the North campus is envisaged as a haven with buildings in soft landscape, where proximity to nature becomes part of the student experience at Burnley College.

At the heart of the North Campus is a green space, almost a park with buildings around the perimeter. The need to deal with water has been treated as a positive with storage capacity built into a central lake with swales. This will create a range of distinctive planting zones with various habitats. A linear pedestrian route that will link future buildings defines the eastern edge of the green space, it will also accommodate café and social learning zones that spill out from the ground floors of teaching buildings. From upper floors it is expected that the design of the proposed buildings can take advantage of views towards Pendle and South towards the viaduct.

The central area will include a small sports area to supplement the all-weather pitch on the main campus. This will be provided managed sports provision that will be available for community just as existing facilities are. At the South end of the site a combination of ramp and steps will deal with the change in level between the current and proposed campus.

There is also potential to incorporate a trim trail around the perimeter of the site and incorporate a performance space to the south of the industry hub with permanent seating as a landscape feature.

Between the linear route and the Calder is the future development zone for teaching buildings. This zone stays outside the 8m easement along the river required by the Environment Agency. Whilst there will be access along the river, it is seen as secondary with minimal footfall. It is intended to be a quite space with limited lighting at night

At the North end of the site will be the Industry Hub. The building will terminate the view and create something of a barrier to motorway noise, but as a two storey structure will not block the views of trees beyond. The ground floor social spaces are linked to a south facing external terrace that will have views of the viaduct and townscape beyond.

The scope of the procurement is to appoint a Principal Contractor for the delivery of the North Campus - Industry Hub project. The successful tenderer/contractor awarded such a contract must be fully available to mobilise in early April 2023.

The Contract terms and conditions will be JCT Design & Build Building Contract (2016),with Special Conditions, which are available as part of the ITT.

The College has procured Project Team and Design Services to complete up to RIBA Stage 4.

The following Design Disciplines are proposed to be novated to the Principal Contractor.

  • Architect (lead Designer) - ABW Architects
  • Landscape Designer - Milieu Landscape Design
  • Civil & Structural Engineering Consultants - Waterman Group.
Delivery: North West · North Campus of Burnley College, Princess Way, Burnley, BB12 0AN.
Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 50%Price: 40%Social value: 5%Environmental: 5%
Published sub-criteria (7)
  • Resource Plan: 10%
  • Programme: 20%
  • Works Delivery Plan: 10%
  • Health and Safety: 10%
  • Price: 40%
  • Social Value: 5%
  • Environment: 5%
Published award criteria (7)
  • Resource Plan: 10%
  • Programme: 20%
  • Works Delivery Plan: 10%
  • Health and Safety: 10%
  • Environment: 5%
  • Social Value: 5%
  • Price: 40%
Conditions of participation1
What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
18 Jan 2023, 18:00 GMT
Last source update
7 Jun 2023, 11:23 BST
Award evaluation window
1 Mar 2023 – …
Authority reference
FTS 001610-2023
FTS notice number
2023/S 000-016106
Classification (CPV)
Architectural and related servicesBuilding completion workBuilding installation workConstruction workConstruction-related servicesEngineering servicesHire of construction and civil engineering machinery and equipment with operatorMonitoring and control servicesSite preparation workTechnical testing, analysis and consultancy services
+2 moreUrban planning and landscape architectural servicesWorks for complete or part construction and civil engineering work
Delivery area
North West (UKD46)
Official registry OCID
ocds-h6vhtk-0398ae Find a Tender

How it was run

Official notice
Run through: portal not identified
Language: EN
Submission deadline
1 Mar 2023, 12:00 GMT
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Bid validity
90 days from the deadline
Bids opened
1 Mar 2023, 14:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

1 Mar 2023 → 7 Jun 2023 · 3 dates
  1. Submission deadline
    1 Mar 2023, 12:00 GMT
  2. Bids opened
    1 Mar 2023, 14:00 GMT
  3. Notice published
    7 Jun 2023, 11:23 BST

Notice history

2 events · 2 releases on Find a Tender · since 7 Jun 2023
  1. Status changed to complete
    7 Jun 2023, 11:23 BST
  2. Buyer details updated
    7 Jun 2023, 11:23 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £10,795,6001 contract exc. VAT
Bids received 1
Contracts signed 1latest 6 Jun 2023
Awarded toValueDateStatus
John Turner Construction Group LimitedSMESubcontracting: declared£10,795,600 †—Awarded

Contracts

Bid statistics published by the authority

BidsSMEVCSEValid bid range
1bids · 1 electronic———

Contracting authority & participating public bodies

2 public bodies on the notice

BURNLEY COLLEGE

Contracting authorityEducationBody governed by public lawEducation GB-UKPRN: 10001000 Princess Way, BURNLEY, North West, BB120ANContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Royal Courts of JusticeReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria