NGET Call For Innovation - Innovative Substation Auxiliary Load Solutions
Authority: National Grid Electricity Transmission plc
What is being bought
Published requirement descriptionThe Call for Innovation (CFI) is an approach to the market to see what products and services are available in the industry with funding coming from Ofgem's Network Innovation Allowance.
A CFI is not a formal competitive tender process but is an approach to the market with a specific problem statement or topic of interest that National Grid would like to hear ideas about from the marketplace.
All information received will be used to consider whether we want to engage with a specific supplier or whether we believe a competitive tender approach is required. Essentially this CFI will inform or dictate our procurement strategy.
CPV: Installation services of electricity control equipment
The lotProcurement structure
single lot · no lot value publishedLot #1To tackle climate change by reducing emissions and enhance the reliability and…
To tackle climate change by reducing emissions and enhance the reliability and resilience of backup power systems, NGET, is seeking to establish a new commercial approach with a 3rd party supplier, to trial new backup power systems or combined standby and generation assets that are low carbon alternatives to the traditional battery and diesel assets that are used across its substations.
NGET's substations need both AC and DC power for the safe reliable operation of the network including protection, control, critical plant and equipment such as transformers, reactors, and switchgear. Traditionally, incoming AC supplies are derived from a DNO (via distribution transformers) and DC power from substation batteries (VRLA, Planté and some Ni-Cad). In addition, backup diesel generators (gensets) provide standby AC power in in the event of a loss of supply event.
The purpose of this CFI is to help National Grid identify:
- Products
a. New technologies capable of providing in the region of 300 - 500kVA low emission backup power to a substation for a minimum of 72 hours with no external supply; and/or,
b. Novel technology capable of delivering energy solutions that can meet all or part of the substation load demand (AC/DC) during normal and standby operations (as a priority) combined with commercial generation (MW) that can synchronise to the GB electricity network*.
- Services
a. Service offerings related to the provision of power during a loss of supply event.
This CFI will inform NGET's approach to obtaining the required resource / improve NGET's knowledge of the backup power and generation market.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 14 Mar 2022, 09:46 GMT
- Last source update
- 14 Mar 2022, 11:17 GMT
- Authority reference
CFI-001- FTS notice number
2022/S 000-006829- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-032134Find a Tender
How it was run
Official notice- Submission deadline
- 14 Apr 2022, 17:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
Timeline
14 Mar 2022 → 14 Apr 2022 · 2 dates- Notice published14 Mar 2022, 11:17 GMT
- Submission deadline14 Apr 2022, 17:00 BST
Notice history
2 releases on Find a TenderPublished amendments (1 · 0 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | TextI.1.3 | The procurement documents are available for unrestricted and full direct access, free of charge, at https://www.nationalgrid.com/gas-transmission/innovation/how-to-work-with-us Additional information can be obtained from the above-mentioned address Tenders or requests to participate must be submitted electronically via https://www.nationalgrid.com/gas-transmission/innovation/how-to-work-with-us | The procurement documents are available for unrestricted and full direct access, free of charge, at https://www.nationalgrid.com/electricity-transmission/innovation/how-to-work-with-us Additional information can be obtained from the above-mentioned address Tenders or requests to participate must be submitted electronically via https://www.nationalgrid.com/electricity-transmission/innovation/how-to… |
1 amendment published without a description.
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.