← Back to search results

AwardedFind a Tender · award

National Framework for Civils and Infrastructure

Buyer: QE Facilities Limited →

BuyerQE Facilities Limited
StatusAwarded
DeadlineNot published
ValueValue not published
Published3 Jul 2022

What is being bought

Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes. The term of this framework agreement will be for a period of 4 years from May 2022. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 lots based on value and then in to 10 geographical regions and then in a further 9 Project Types. each Sub-Lot which will operate with a maximum of 9 contractors 9 per region. This framework agreement has advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK.

Delivery location

UK · UK · UK · UK

Categories

Works for complete or part construction and civil engineering work 45200000Engineering works and construction works 45220000Construction work for bridges and tunnels, shafts and subways 45221000Construction work for engineering works except bridges, tunnels, shafts and subways 45222000Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork 45230000Construction work for pipelines, communication and power lines 45231000Ancillary works for pipelines and cables 45232000Construction, foundation and surface works for highways, roads 45233000Construction work for railways and cable transport systems 45234000Construction work for airfields, runways and manoeuvring surfaces 45235000Flatwork 45236000Construction work for water projects 45240000Harbour construction works 45241000Waterside leisure facilities construction work 45242000Coastal-defence works 45243000Marine construction works 45244000Dredging and pumping works for water treatment plant installations 45245000River regulation and flood control works 45246000Construction work for dams, canals, irrigation channels and aqueducts 45247000Construction work for hydro-mechanical structures 45248000Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry 45250000Construction works for power plants and heating plants 45251000Construction works for sewage treatment plants, purification plants and refuse incineration plants 45252000Construction work for chemical-processing plant 45253000Construction work for mining and manufacturing 45254000Construction work for the oil and gas industry 45255000Works for complete or part construction and civil engineering work 45200000

Lot details

£500,000 to £5,000,000

Provision of Civils and Infrastructure works projects between £500,000 and £5,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).

Statuscancelled

Award criteria
price

£5,000,001 to £15,000,000

For the provision of Civil and Infrastructure works projects of value between £5,000,001 and £15,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).

Statuscancelled

Award criteria
price

£15,000,001 to £30,000,000

For the provision of Civils and Infrastructure works projects with a values between £15,000,001 and £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).

Statuscancelled

Award criteria
price

Above £30,000,000

For the provision of Civils and Infrastructure works projects greater than £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).

Statuscancelled

Award criteria
price

What is included

ItemCategoryQuantity
1Works for complete or part construction and civil engineering work, Dredging and pumping works for water treatment plant installations, Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry, Construction work for railways and cable transport systems, River regulation and flood control works, Coastal-defence works, Construction work for mining and manufacturing, Waterside leisure facilities construction work, Construction work for pipelines, communication and power lines, Construction works for sewage treatment plants, purification plants and refuse incineration plants, Construction work for the oil and gas industry, Construction works for power plants and heating plants, Construction work for airfields, runways and manoeuvring surfaces, Marine construction works, Construction, foundation and surface works for highways, roads, Construction work for chemical-processing plant, Engineering works and construction works, Flatwork, Ancillary works for pipelines and cables, Construction work for dams, canals, irrigation channels and aqueducts, Construction work for water projects, Harbour construction works, Construction work for hydro-mechanical structures, Construction work for engineering works except bridges, tunnels, shafts and subways, Construction work for bridges and tunnels, shafts and subwaysNot published
2Works for complete or part construction and civil engineering work, Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry, Construction work for railways and cable transport systems, River regulation and flood control works, Construction work for pipelines, communication and power lines, Construction work for mining and manufacturing, Coastal-defence works, Construction works for sewage treatment plants, purification plants and refuse incineration plants, Construction work for bridges and tunnels, shafts and subways, Construction works for power plants and heating plants, Construction work for airfields, runways and manoeuvring surfaces, Marine construction works, Harbour construction works, Construction work for hydro-mechanical structures, Construction, foundation and surface works for highways, roads, Engineering works and construction works, Construction work for water projects, Dredging and pumping works for water treatment plant installations, Construction work for dams, canals, irrigation channels and aqueducts, Ancillary works for pipelines and cables, Flatwork, Construction work for the oil and gas industry, Construction work for engineering works except bridges, tunnels, shafts and subways, Waterside leisure facilities construction workNot published
3Works for complete or part construction and civil engineering work, Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry, Construction work for railways and cable transport systems, River regulation and flood control works, Construction work for pipelines, communication and power lines, Construction work for mining and manufacturing, Flatwork, Coastal-defence works, Construction works for sewage treatment plants, purification plants and refuse incineration plants, Construction work for bridges and tunnels, shafts and subways, Construction works for power plants and heating plants, Construction work for airfields, runways and manoeuvring surfaces, Marine construction works, Harbour construction works, Construction work for hydro-mechanical structures, Construction, foundation and surface works for highways, roads, Engineering works and construction works, Dredging and pumping works for water treatment plant installations, Construction work for dams, canals, irrigation channels and aqueducts, Construction work for water projects, Construction work for engineering works except bridges, tunnels, shafts and subways, Ancillary works for pipelines and cables, Construction work for the oil and gas industry, Construction work for chemical-processing plant, Waterside leisure facilities construction workNot published
4Works for complete or part construction and civil engineering work, Ancillary works for pipelines and cables, Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry, Construction work for railways and cable transport systems, River regulation and flood control works, Engineering works and construction works, Construction work for mining and manufacturing, Waterside leisure facilities construction work, Coastal-defence works, Construction works for sewage treatment plants, purification plants and refuse incineration plants, Construction work for the oil and gas industry, Construction works for power plants and heating plants, Construction work for airfields, runways and manoeuvring surfaces, Marine construction works, Construction work for hydro-mechanical structures, Construction, foundation and surface works for highways, roads, Harbour construction works, Construction work for water projects, Dredging and pumping works for water treatment plant installations, Construction work for dams, canals, irrigation channels and aqueducts, Construction work for chemical-processing plant, Flatwork, Construction work for engineering works except bridges, tunnels, shafts and subways, Construction work for pipelines, communication and power lines, Construction work for bridges and tunnels, shafts and subwaysNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Works for complete or part construction and civil engineering work (45200000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1344 median · 30.2 average (5,651 of 17,134 with a bid count)3.8 average (6,251 of 17,134 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UK2,3906 median · 82.8 average (837 of 2,390 with a bid count)7.3 average (932 of 2,390 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementYes
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Lot 1 – Projects of £500k to £5m

Statusactive
SupplierACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C, Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,, Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2: 2R 4R 5C 6C 7C 9C, R3: 2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C, Associated Asphalt Contracting Limited R3: 8R, R4: 8R, R6: 8C, Bethell Construction Limited R2: 6R 8R, R3: 6R 8C, Britannia Construction Limited R3: 9C, R4: 4C 6C 9C, Clancy Docwra Limited R1a: 4C 6C 7C, R1b: 4C 6C 7C, Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C, CR Reynolds Limited R2: 1C, R3: 1C, Danaher & Walsh (Civil Engineering) Limited R3: 4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R, Dawson-Wam Limited R1a: 3C, R1b: 3C, R1c: 3C, R1d: 3C, R7: 3C 6C, Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C, Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C, Fox Building and Engineering Limited R2: 2R 4R 6C 7R 9C, R3: 2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C, FP McCann Limited R7: 1C 2C, Howard Civil Engineering Limited R2: 1C 3C 6C, J Hopkins (Contractors) Limited R2: 8R, Jackson Civil Engineering Group Limited R6: 3R, JN Bentley Limited R2: 4C 5C 6C 7C 8C, R3: 3R 4C 5C 6C 7C, R4: 8C, R5: 1C 3C 4C 5C 6C 7C 8C, John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C, John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2C, R6: 2C, Jones Bros Ruthin (Civil Engineering) Co Limited R5: 4R 6R 8R, Keltbray Built Environment Limited R1a: 4C 7C 9C, R1b: 4C 7C 9C, R1c: 4C 7C 9C, R1d: 4C 7C 9C, R5: 2R, R6: 4R 7R 9C, R7: 1R 2C 4C 7C 9C, Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C, Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C, McPhillips (Wellington) Limited R3: 6R, R5: 6C, Meldrum Structural and Civil Engineering Limited R2: 3C, Mildren Construction Limited R4: 6C 8R, R6: 6C 8C, Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C, Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C, O’Brien Contractors Limited R3: 2C 4C, Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C, P.P. O’Connor Group Limited R2: 4R 5C 6R 7R 8R, R3: 5C 6R 7R 8R, R5: 4R 5C 6R 7R 8R, PBS Construction (North East) Limited R2: 1R 3R 4C, RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C, C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2: 5C 7R, R3: 5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C, P Casey & Co Ltd R2: 6R, VINCI Construction UK Limited R2: 4C 7C, R3: 4C 7C, R4: 4C 7C, R5: 4C 7C, R6: 4C 7C, VolkerFitzpatrick Limited R1a: 3C 4C 5C 7C 8C, R1b: 3C 4C 5C 7C 8C, R1c: 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2: 2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4: 2C 3C 4C 5C 7C 8C 9C, R5: 2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C, Whitehouse Construction Co. Limited R3: 4R 6C 8C 9C, Whitemountain Quarries Limited R2: 8C, R3: 8C, R4: 8C, R5: 1R 8C, R6: 8C, R7: 1R 8C

Lot 2 – Projects of over £5m - £15m

Statusactive
SupplierAlun Griffiths (Contractors) Limited R4: 3R 6C 8C, R5: 1R 2R 3R 6C 8C, Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2: 3R 5C 9C, R3: 3R 5C 9C, R4: 2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6: 3C 5C 9C, Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C, Clancy Docwra Limited R2: 4R 6R 7R, R3: 4R 6R 7R, R6: 4R 6C 7R, Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C, CR Reynolds Limited R2: 1C, R3: 1C, Dawson-Wam Limited R1a: 3C, R1b: 3C, R1c: 3C, R1d: 3C, R7: 3C 6C, Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C, Esh Construction Limited R2: 3C 4C 6C 7C, Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3: 3R 4C 6C 9C, R4: 3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6: 3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C, FP McCann Limited R7: 1C, Galliford Try Construction Limited R4: 1R, Jackson Civil Engineering Group Limited R6: 3R, JN Bentley Limited R2: 3R 6C 7R, R3: 3R 6C 7C, R5: 3C 6C 7C,, John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C, John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R, Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3: 4R 7R, R4: 4R 7R, R5: 2R 3R 4C 7C, Keltbray Built Environment Limited R1a: 4C 7C, R1b: 4C 7C, R1c: 4C 7C, R1d: 4C 7C, R2: 4R, R5: 2R, R6: 4R 7R, R7: 1C 2C 4C 7C, Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C, Lagan Aviation & Infrastructure Limited R2: 8R, R7: 8C, Lowry Building and Civil Engineering Limited R7: 6C, McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 3C, McPhillips (Wellington) Limited R3: 6R, R5: 1R 6C, Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C, Montel Civil Engineering Limited R4: 1C, Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C, RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C, Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C, C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2: 5C 7R, R3: 5C 7R, R4: 2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6: 3R 5C 7C, P Casey & Co Ltd R2: 6R, VINCI Construction UK Limited R2: 4C 6C 7C, R3: 4C 6C 7C, R4: 4C 6C 7C, R5: 4C 6C 7C, R6: 4C 6C 7C, VolkerFitzpatrick Limited R1a: 3C 4C 5C 7C 8C, R1b: 3C 4C 5C 7C 8C, R1c: 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2: 2R 3C 4C 5C 7C 8C, R3: 2R 3C 4C 5C 7C 8C 9C, R4: 2C 3C 4C 5C 7C 8C 9C, R5: 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7: 8C, Whitemountain Quarries Limited R2: 8C, R3: 8C, R4: 8R, R5: 1R 8C, R6: 8C, R7: 1C 8C, Winvic Construction Limited R6: 2R

Lot 3 – Projects of over £15m - £30m

Statusactive
SupplierAlun Griffiths (Contractors) Limited R5: 1R 2R, Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C, Clancy Docwra Limited R2: 4R, R3: 4R, R6: 4R, Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C, Esh Construction Limited R2: 1R, Fox Building and Engineering Limited R5: 1C, R7: 1C, FP McCann Limited R7: 1C, Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R, JN Bentley Limited R2: 3R 6C 7C, R3: 3R 6C 7C, R5: 3C 6C 7C, John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C, John Sisk and Son (Holdings) Limited R2: 2R 3C, R3: 2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 2R 3C, Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2: 3R 4R 7R, R3: 3R 4R 7R, R4: 3R 4C 7C, R5: 3R 4C 7R, Keltbray Built Environment Limited R1a: 4C, R1b: 4C, R1c: 4C, R1d: 4C, R5: 1R 2R, R6: 4R, R7: 1C 2C 4C, Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C, Lagan Aviation & Infrastructure Limited R2: 8C, R7: 8C, McLaughlin & Harvey Limited R1a: 3C 4C 5C 8C, R1b: 3C 4C 5C 8C, R1c: 3C 4C 5C 8C, R1d: 3C 4C 5C 8C, R2: 3C 4C 5C 8C, R3: 3C 4C 5C 8C, R4: 3C 4C 5C 8C, R6: 3C 4C 5C 8C, R7: 3C 4C 8C, Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C, Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c: 4C 7C, R1d: 4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4: 2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C, Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C, RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C, Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C, C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2: 3R 5C 7R, R3: 3R 5C 7R, R4: 2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6: 3R 5C 7C, VINCI Construction UK Limited R2: 2C 4C 5C 6C 7C 8C, R3: 2C 4C 5C 6C 7C 8C, R4: 2C 4C 5C 6C 7C 8C, R5: 2C 4C 5C 6C 7C 8C, R6: 2C 4C 5C 6C 7C 8C, VolkerFitzpatrick Limited R1a: 2C 3C 4C 5C 7C 8C, R1b: 2C 3C 4C 5C 7C 8C, R1c: 2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2: 2R 3C 4C 5C 7C 8C, R3: 2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5: 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7: 8C, Whitemountain Quarries Limited R2: 8C, R3: 8C, R4: 8C, R5: 1R 8C, R6: 8C, R7: 1C 8C

Lot 4 – Projects over £30m

Statusactive
SupplierAlun Griffiths (Contractors) Limited R4: 1R, R5: 1C, Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C, Clancy Docwra Limited R6: 4C, Esh Construction Limited R2: 1R, FP McCann Limited R7: 1C, Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C, JN Bentley Limited R2: 3R 6C 7C, R3: 3R 6C 7C, R5: 3C 6C 7C, John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C, John Sisk and Son (Holdings) Limited R2: 2R 3C, R3: 2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C, Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2: 4C 7R, R3: 4C 7R, R4: 4C 7C, R5: 1R 4C 7C, Keltbray Built Environment Limited R4: 2R, R5: 2C, R7: 2C, Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C, McLaughlin & Harvey Limited R1a: 3C 5C 8C, R1b: 3C 5C 8C, R1c: 3C 5C 8C, R1d: 3C 5C 8C, R2: 3C 5C 8C, R3: 3C 5C 8C, R4: 3C 5C 8C, R6: 3C 5C 8C, R7: 3C 8C, Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c: 4C 7C, R1d: 4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4: 2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C, Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C, RJ McLeod (Contractors) Limited R1a: 7C, R1b: 7C, R1c: 7C, R1d: 7C, Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C, VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C, VolkerFitzpatrick Limited R1a: 2C 3C 4C 5C 7C 8C, R1b: 2C 3C 4C 5C 7C 8C, R1c: 2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2: 2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7: 8C, Winvic Construction Limited R3: 2R, R6: 2R

Contracts

Lot 1 – Projects of £500k to £5m

Statusactive
Value£75,000,000

Lot 2 – Projects of over £5m - £15m

Statusactive
Value£235,000,000

Lot 3 – Projects of over £15m - £30m

Statusactive
Value£390,000,000

Lot 4 – Projects over £30m

Statusactive
Value£860,000,000

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-02bb5e
Latest release ID018086-2022
Latest release timestampSun Jul 03 2022 20:51:44 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodopen
Procurement method detailsOpen procedure
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source4
Tender items in source4
Tender documents in source0
Awards in latest release4
Contracts in latest release4
Parties in latest release106

Notice history

DateEventReference
3 Jul 2022award, contract018086-2022
20 Sept 2021tender023278-2021
14 Jun 2021planning013291-2021

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "018086-2022",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 45,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "6",
        "value": 42,
        "measure": "bids",
        "relatedLot": "2"
      },
      {
        "id": "11",
        "value": 28,
        "measure": "bids",
        "relatedLot": "3"
      },
      {
        "id": "16",
        "value": 21,
        "measure": "bids",
        "relatedLot": "4"
      },
      {
        "id": "2",
        "value": 21,
        "measure": "smeBids",
        "relatedLot": "1"
      },
      {
        "id": "7",
        "value": 12,
        "measure": "smeBids",
        "relatedLot": "2"
      },
      {
        "id": "12",
        "value": 2,
        "measure": "smeBids",
        "relatedLot": "3"
      },
      {
        "id": "17",
        "value": 1,
        "measure": "smeBids",
        "relatedLot": "4"
      },
      {
        "id": "3",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "1"
      },
      {
        "id": "8",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "2"
      },
      {
        "id": "13",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "3"
      },
      {
        "id": "18",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "4"
      },
      {
        "id": "4",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "1"
      },
      {
        "id": "9",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "2"
      },
      {
        "id": "14",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "3"
      },
      {
        "id": "19",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "4"
      },
      {
        "id": "5",
        "value": 45,
        "measure": "electronicBids",
        "relatedLot": "1"
      },
      {
        "id": "10",
        "value": 42,
        "measure": "electronicBids",
        "relatedLot": "2"
      },
      {
        "id": "15",
        "value": 28,
        "measure": "electronicBids",
        "relatedLot": "3"
      },
      {
        "id": "20",
        "value": 21,
        "measure": "electronicBids",
        "relatedLot": "4"
      }
    ]
  },
  "date": "2022-07-03T21:51:44+01:00",
  "ocid": "ocds-h6vhtk-02bb5e",
  "buyer": {
    "id": "GB-FTS-28768",
    "name": "QE Facilities Limited"
  },
  "awards": [
    {
      "id": "018086-2022-1",
      "title": "Lot 1 – Projects of £500k to £5m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57267",
          "name": "ACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C"
        },
        {
          "id": "GB-FTS-57271",
          "name": "Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,"
        },
        {
          "id": "GB-FTS-57272",
          "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2:  2R 4R 5C 6C 7C 9C, R3:  2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C"
        },
        {
          "id": "GB-FTS-57273",
          "name": "Associated Asphalt Contracting Limited R3:  8R, R4:  8R, R6:  8C"
        },
        {
          "id": "GB-FTS-57274",
          "name": "Bethell Construction Limited R2:  6R 8R, R3:  6R 8C"
        },
        {
          "id": "GB-FTS-57275",
          "name": "Britannia Construction Limited R3:  9C, R4:  4C 6C 9C"
        },
        {
          "id": "GB-FTS-57276",
          "name": "Clancy Docwra Limited R1a:  4C 6C 7C, R1b:  4C 6C 7C"
        },
        {
          "id": "GB-FTS-57277",
          "name": "Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C"
        },
        {
          "id": "GB-FTS-57278",
          "name": "CR Reynolds Limited R2: 1C, R3: 1C"
        },
        {
          "id": "GB-FTS-57279",
          "name": "Danaher & Walsh (Civil Engineering) Limited R3:  4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R"
        },
        {
          "id": "GB-FTS-57280",
          "name": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C"
        },
        {
          "id": "GB-FTS-57281",
          "name": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C"
        },
        {
          "id": "GB-FTS-57282",
          "name": "Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57283",
          "name": "Fox Building and Engineering Limited R2:  2R 4R 6C 7R 9C, R3:  2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C"
        },
        {
          "id": "GB-FTS-57284",
          "name": "FP McCann Limited R7: 1C 2C"
        },
        {
          "id": "GB-FTS-57285",
          "name": "Howard Civil Engineering Limited R2: 1C 3C 6C"
        },
        {
          "id": "GB-FTS-57286",
          "name": "J Hopkins (Contractors) Limited R2:  8R"
        },
        {
          "id": "GB-FTS-57287",
          "name": "Jackson Civil Engineering Group Limited R6:  3R"
        },
        {
          "id": "GB-FTS-57288",
          "name": "JN Bentley Limited R2:  4C 5C 6C 7C 8C, R3:  3R 4C 5C 6C 7C, R4:  8C, R5: 1C 3C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57289",
          "name": "John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57290",
          "name": "John Sisk and Son (Holdings) Limited R2:  2R, R3:  2R, R4:  2C, R6:  2C"
        },
        {
          "id": "GB-FTS-57291",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R5:  4R 6R 8R"
        },
        {
          "id": "GB-FTS-57292",
          "name": "Keltbray Built Environment Limited R1a:  4C 7C 9C, R1b:  4C 7C 9C, R1c:  4C 7C 9C, R1d:  4C 7C 9C, R5:  2R, R6:  4R 7R 9C, R7: 1R 2C 4C 7C 9C"
        },
        {
          "id": "GB-FTS-57293",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57294",
          "name": "Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C"
        },
        {
          "id": "GB-FTS-57295",
          "name": "McPhillips (Wellington) Limited R3:  6R, R5:  6C"
        },
        {
          "id": "GB-FTS-57296",
          "name": "Meldrum Structural and Civil Engineering Limited R2:  3C"
        },
        {
          "id": "GB-FTS-57297",
          "name": "Mildren Construction Limited R4:  6C 8R, R6:  6C 8C"
        },
        {
          "id": "GB-FTS-57298",
          "name": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C"
        },
        {
          "id": "GB-FTS-57299",
          "name": "Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C"
        },
        {
          "id": "GB-FTS-57300",
          "name": "O’Brien Contractors Limited R3:  2C 4C"
        },
        {
          "id": "GB-FTS-57301",
          "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57302",
          "name": "P.P. O’Connor Group Limited  R2:  4R 5C 6R 7R 8R, R3:  5C 6R 7R 8R, R5:  4R 5C 6R 7R 8R"
        },
        {
          "id": "GB-FTS-57303",
          "name": "PBS Construction (North East) Limited R2: 1R 3R 4C"
        },
        {
          "id": "GB-FTS-57304",
          "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C"
        },
        {
          "id": "GB-FTS-57305",
          "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C"
        },
        {
          "id": "GB-FTS-57306",
          "name": "P Casey & Co Ltd R2:  6R"
        },
        {
          "id": "GB-FTS-57307",
          "name": "VINCI Construction UK Limited R2:  4C 7C, R3:  4C 7C, R4:  4C 7C, R5:  4C 7C, R6:  4C 7C"
        },
        {
          "id": "GB-FTS-57308",
          "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57309",
          "name": "Whitehouse Construction Co. Limited R3:  4R 6C 8C 9C"
        },
        {
          "id": "GB-FTS-57310",
          "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1R 8C"
        }
      ],
      "relatedLots": [
        "1"
      ]
    },
    {
      "id": "018086-2022-2",
      "title": "Lot 2 – Projects of over £5m - £15m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57268",
          "name": "Alun Griffiths (Contractors) Limited R4:  3R 6C 8C, R5: 1R 2R 3R 6C 8C"
        },
        {
          "id": "GB-FTS-57311",
          "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2:  3R 5C 9C, R3:  3R 5C 9C, R4:  2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6:  3C 5C 9C"
        },
        {
          "id": "GB-FTS-57312",
          "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57313",
          "name": "Clancy Docwra Limited R2:  4R 6R 7R, R3:  4R 6R 7R, R6:  4R 6C 7R"
        },
        {
          "id": "GB-FTS-57314",
          "name": "Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C"
        },
        {
          "id": "GB-FTS-57278",
          "name": "CR Reynolds Limited R2: 1C, R3: 1C"
        },
        {
          "id": "GB-FTS-57280",
          "name": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C"
        },
        {
          "id": "GB-FTS-57281",
          "name": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C"
        },
        {
          "id": "GB-FTS-57315",
          "name": "Esh Construction Limited R2:  3C 4C 6C 7C"
        },
        {
          "id": "GB-FTS-57316",
          "name": "Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3:  3R 4C 6C 9C, R4:  3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6:  3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C"
        },
        {
          "id": "GB-FTS-57317",
          "name": "FP McCann Limited R7: 1C"
        },
        {
          "id": "GB-FTS-57318",
          "name": "Galliford Try Construction Limited R4: 1R"
        },
        {
          "id": "GB-FTS-57287",
          "name": "Jackson Civil Engineering Group Limited R6:  3R"
        },
        {
          "id": "GB-FTS-57319",
          "name": "JN Bentley Limited R2: 3R 6C 7R, R3:  3R 6C 7C, R5:  3C 6C 7C,"
        },
        {
          "id": "GB-FTS-57320",
          "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57321",
          "name": "John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R"
        },
        {
          "id": "GB-FTS-57322",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3:  4R 7R, R4:  4R 7R, R5:  2R 3R 4C 7C"
        },
        {
          "id": "GB-FTS-57323",
          "name": "Keltbray Built Environment Limited R1a:  4C 7C, R1b:  4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2:  4R, R5:  2R, R6:  4R 7R, R7: 1C 2C 4C 7C"
        },
        {
          "id": "GB-FTS-57324",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3:  2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57325",
          "name": "Lagan Aviation & Infrastructure Limited R2:  8R, R7:  8C"
        },
        {
          "id": "GB-FTS-57326",
          "name": "Lowry Building and Civil Engineering Limited R7:  6C"
        },
        {
          "id": "GB-FTS-57327",
          "name": "McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7:  3C"
        },
        {
          "id": "GB-FTS-57328",
          "name": "McPhillips (Wellington) Limited R3:  6R, R5: 1R 6C"
        },
        {
          "id": "GB-FTS-57298",
          "name": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C"
        },
        {
          "id": "GB-FTS-57329",
          "name": "Montel Civil Engineering Limited R4: 1C"
        },
        {
          "id": "GB-FTS-57330",
          "name": "Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57331",
          "name": "RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C"
        },
        {
          "id": "GB-FTS-57332",
          "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57333",
          "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4:  2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6:  3R 5C 7C"
        },
        {
          "id": "GB-FTS-57306",
          "name": "P Casey & Co Ltd R2:  6R"
        },
        {
          "id": "GB-FTS-57334",
          "name": "VINCI Construction UK Limited R2:  4C 6C 7C, R3:  4C 6C 7C, R4:  4C 6C 7C, R5:  4C 6C 7C, R6:  4C 6C 7C"
        },
        {
          "id": "GB-FTS-57335",
          "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
        },
        {
          "id": "GB-FTS-57336",
          "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8R, R5: 1R 8C, R6:  8C, R7: 1C 8C"
        },
        {
          "id": "GB-FTS-57337",
          "name": "Winvic Construction Limited R6:  2R"
        }
      ],
      "relatedLots": [
        "2"
      ]
    },
    {
      "id": "018086-2022-3",
      "title": "Lot 3 – Projects of over £15m - £30m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57269",
          "name": "Alun Griffiths (Contractors) Limited R5: 1R 2R"
        },
        {
          "id": "GB-FTS-57312",
          "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57338",
          "name": "Clancy Docwra Limited R2:  4R, R3:  4R, R6:  4R"
        },
        {
          "id": "GB-FTS-57339",
          "name": "Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C"
        },
        {
          "id": "GB-FTS-57340",
          "name": "Esh Construction Limited R2: 1R"
        },
        {
          "id": "GB-FTS-57341",
          "name": "Fox Building and Engineering Limited R5: 1C, R7: 1C"
        },
        {
          "id": "GB-FTS-57317",
          "name": "FP McCann Limited R7: 1C"
        },
        {
          "id": "GB-FTS-57342",
          "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R"
        },
        {
          "id": "GB-FTS-57343",
          "name": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C"
        },
        {
          "id": "GB-FTS-57344",
          "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C"
        },
        {
          "id": "GB-FTS-57345",
          "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6:  2R 3C"
        },
        {
          "id": "GB-FTS-57346",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2:  3R 4R 7R, R3:  3R 4R 7R, R4:  3R 4C 7C, R5:  3R 4C 7R"
        },
        {
          "id": "GB-FTS-57347",
          "name": "Keltbray Built Environment Limited R1a:  4C, R1b:  4C, R1c:  4C, R1d:  4C, R5: 1R 2R, R6:  4R, R7: 1C 2C 4C"
        },
        {
          "id": "GB-FTS-57348",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57349",
          "name": "Lagan Aviation & Infrastructure Limited R2:  8C, R7:  8C"
        },
        {
          "id": "GB-FTS-57350",
          "name": "McLaughlin & Harvey Limited R1a:  3C 4C 5C 8C, R1b:  3C 4C 5C 8C, R1c:  3C 4C 5C 8C, R1d:  3C 4C 5C 8C, R2:  3C 4C 5C 8C, R3:  3C 4C 5C 8C, R4:  3C 4C 5C 8C, R6:  3C 4C 5C 8C, R7:  3C 4C 8C"
        },
        {
          "id": "GB-FTS-57351",
          "name": "Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57352",
          "name": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57301",
          "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57353",
          "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C"
        },
        {
          "id": "GB-FTS-57354",
          "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57355",
          "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  3R 5C 7R, R3:  3R 5C 7R, R4:  2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6:  3R 5C 7C"
        },
        {
          "id": "GB-FTS-57356",
          "name": "VINCI Construction UK Limited R2:  2C 4C 5C 6C 7C 8C, R3:  2C 4C 5C 6C 7C 8C, R4:  2C 4C 5C 6C 7C 8C, R5:  2C 4C 5C 6C 7C 8C, R6:  2C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57357",
          "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
        },
        {
          "id": "GB-FTS-57358",
          "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1C 8C"
        }
      ],
      "relatedLots": [
        "3"
      ]
    },
    {
      "id": "018086-2022-4",
      "title": "Lot 4 – Projects over £30m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57270",
          "name": "Alun Griffiths (Contractors) Limited R4: 1R, R5: 1C"
        },
        {
          "id": "GB-FTS-57312",
          "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57359",
          "name": "Clancy Docwra Limited R6:  4C"
        },
        {
          "id": "GB-FTS-57340",
          "name": "Esh Construction Limited R2: 1R"
        },
        {
          "id": "GB-FTS-57317",
          "name": "FP McCann Limited R7: 1C"
        },
        {
          "id": "GB-FTS-57360",
          "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C"
        },
        {
          "id": "GB-FTS-57343",
          "name": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C"
        },
        {
          "id": "GB-FTS-57361",
          "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C"
        },
        {
          "id": "GB-FTS-57362",
          "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C"
        },
        {
          "id": "GB-FTS-57363",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2:  4C 7R, R3:  4C 7R, R4:  4C 7C, R5: 1R 4C 7C"
        },
        {
          "id": "GB-FTS-57364",
          "name": "Keltbray Built Environment Limited R4:  2R, R5:  2C, R7:  2C"
        },
        {
          "id": "GB-FTS-57365",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57366",
          "name": "McLaughlin & Harvey Limited R1a:  3C 5C 8C, R1b:  3C 5C 8C, R1c:  3C 5C 8C, R1d:  3C 5C 8C, R2:  3C 5C 8C, R3:  3C 5C 8C, R4:  3C 5C 8C, R6:  3C 5C 8C, R7:  3C 8C"
        },
        {
          "id": "GB-FTS-57352",
          "name": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57301",
          "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57367",
          "name": "RJ McLeod (Contractors) Limited R1a:  7C, R1b:  7C, R1c:  7C, R1d:  7C"
        },
        {
          "id": "GB-FTS-57354",
          "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57368",
          "name": "VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57369",
          "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7:  8C"
        },
        {
          "id": "GB-FTS-57370",
          "name": "Winvic Construction Limited R3:  2R, R6:  2R"
        }
      ],
      "relatedLots": [
        "4"
      ]
    }
  ],
  "tender": {
    "id": "AVP-QEF-1001",
    "lots": [
      {
        "id": "1",
        "title": "£500,000 to £5,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Provision of Civils and Infrastructure works projects between £500,000 and £5,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "£5,000,001 to £15,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "For the provision of Civil and Infrastructure works projects of value between £5,000,001 and £15,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "£15,000,001 to £30,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "For the provision of Civils and Infrastructure works projects with a values between £15,000,001 and £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      },
      {
        "id": "4",
        "title": "Above £30,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "For the provision of Civils and Infrastructure works projects greater than £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          }
        ]
      },
      {
        "id": "4",
        "relatedLot": "4",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          }
        ]
      }
    ],
    "title": "National Framework for Civils and Infrastructure",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "techniques": {
      "hasFrameworkAgreement": true
    },
    "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes. The term of this framework agreement will be for a period of 4 years from May 2022. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 lots based on value and then in to 10 geographical regions and then in a further 9 Project Types. each Sub-Lot which will operate with a maximum of 9 contractors 9 per region. This framework agreement has advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK.",
    "classification": {
      "id": "45200000",
      "scheme": "CPV",
      "description": "Works for complete or part construction and civil engineering work"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-FTS-28768",
      "name": "QE Facilities Limited",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "Gateshead",
        "postalCode": "NE9 6SX",
        "countryName": "United Kingdom",
        "streetAddress": "Estates and Facilities Department, Queen Elizabeth Hospital, Old Durham Road"
      },
      "details": {
        "url": "https://qefacilities.co.uk",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "07",
            "scheme": "COFOG",
            "description": "Health"
          }
        ]
      },
      "identifier": {
        "legalName": "QE Facilities Limited"
      },
      "contactPoint": {
        "email": "tenders@pagabo.co.uk"
      }
    },
    {
      "id": "GB-FTS-57267",
      "name": "ACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "ACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C"
      }
    },
    {
      "id": "GB-FTS-57268",
      "name": "Alun Griffiths (Contractors) Limited R4:  3R 6C 8C, R5: 1R 2R 3R 6C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R4:  3R 6C 8C, R5: 1R 2R 3R 6C 8C"
      }
    },
    {
      "id": "GB-FTS-57269",
      "name": "Alun Griffiths (Contractors) Limited R5: 1R 2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R5: 1R 2R"
      }
    },
    {
      "id": "GB-FTS-57270",
      "name": "Alun Griffiths (Contractors) Limited R4: 1R, R5: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R4: 1R, R5: 1C"
      }
    },
    {
      "id": "GB-FTS-57271",
      "name": "Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,"
      }
    },
    {
      "id": "GB-FTS-57272",
      "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2:  2R 4R 5C 6C 7C 9C, R3:  2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds ",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2:  2R 4R 5C 6C 7C 9C, R3:  2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C"
      }
    },
    {
      "id": "GB-FTS-57273",
      "name": "Associated Asphalt Contracting Limited R3:  8R, R4:  8R, R6:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Associated Asphalt Contracting Limited R3:  8R, R4:  8R, R6:  8C"
      }
    },
    {
      "id": "GB-FTS-57274",
      "name": "Bethell Construction Limited R2:  6R 8R, R3:  6R 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD33",
        "locality": "Manchester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Bethell Construction Limited R2:  6R 8R, R3:  6R 8C"
      }
    },
    {
      "id": "GB-FTS-57275",
      "name": "Britannia Construction Limited R3:  9C, R4:  4C 6C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Britannia Construction Limited R3:  9C, R4:  4C 6C 9C"
      }
    },
    {
      "id": "GB-FTS-57276",
      "name": "Clancy Docwra Limited R1a:  4C 6C 7C, R1b:  4C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R1a:  4C 6C 7C, R1b:  4C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57277",
      "name": "Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG3",
        "locality": "Solihull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C"
      }
    },
    {
      "id": "GB-FTS-57278",
      "name": "CR Reynolds Limited R2: 1C, R3: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE12",
        "locality": "Hessle",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "CR Reynolds Limited R2: 1C, R3: 1C"
      }
    },
    {
      "id": "GB-FTS-57279",
      "name": "Danaher & Walsh (Civil Engineering) Limited R3:  4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF22",
        "locality": "Mountsorrel",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Danaher & Walsh (Civil Engineering) Limited R3:  4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R"
      }
    },
    {
      "id": "GB-FTS-57280",
      "name": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Saintfield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C"
      }
    },
    {
      "id": "GB-FTS-57281",
      "name": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD4",
        "locality": "Preston",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C"
      }
    },
    {
      "id": "GB-FTS-57282",
      "name": "Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC1",
        "locality": "Durham",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57283",
      "name": "Fox Building and Engineering Limited R2:  2R 4R 6C 7R 9C, R3:  2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Fox Building and Engineering Limited R2:  2R 4R 6C 7R 9C, R3:  2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C"
      }
    },
    {
      "id": "GB-FTS-57284",
      "name": "FP McCann Limited R7: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0",
        "locality": "Magherafelt",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "FP McCann Limited R7: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57285",
      "name": "Howard Civil Engineering Limited R2: 1C 3C 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Howard Civil Engineering Limited R2: 1C 3C 6C"
      }
    },
    {
      "id": "GB-FTS-57286",
      "name": "J Hopkins (Contractors) Limited R2:  8R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD33",
        "locality": "Manchester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "J Hopkins (Contractors) Limited R2:  8R"
      }
    },
    {
      "id": "GB-FTS-57287",
      "name": "Jackson Civil Engineering Group Limited R6:  3R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH1",
        "locality": "Ipswich",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jackson Civil Engineering Group Limited R6:  3R"
      }
    },
    {
      "id": "GB-FTS-57288",
      "name": "JN Bentley Limited R2:  4C 5C 6C 7C 8C, R3:  3R 4C 5C 6C 7C, R4:  8C, R5: 1C 3C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE22",
        "locality": "Skipton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "JN Bentley Limited R2:  4C 5C 6C 7C 8C, R3:  3R 4C 5C 6C 7C, R4:  8C, R5: 1C 3C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57289",
      "name": "John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57290",
      "name": "John Sisk and Son (Holdings) Limited R2:  2R, R3:  2R, R4:  2C, R6:  2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2:  2R, R3:  2R, R4:  2C, R6:  2C"
      }
    },
    {
      "id": "GB-FTS-57291",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R5:  4R 6R 8R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R5:  4R 6R 8R"
      }
    },
    {
      "id": "GB-FTS-57292",
      "name": "Keltbray Built Environment Limited R1a:  4C 7C 9C, R1b:  4C 7C 9C, R1c:  4C 7C 9C, R1d:  4C 7C 9C, R5:  2R, R6:  4R 7R 9C, R7: 1R 2C 4C 7C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R1a:  4C 7C 9C, R1b:  4C 7C 9C, R1c:  4C 7C 9C, R1d:  4C 7C 9C, R5:  2R, R6:  4R 7R 9C, R7: 1R 2C 4C 7C 9C"
      }
    },
    {
      "id": "GB-FTS-57293",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57294",
      "name": "Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Castlederg",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C"
      }
    },
    {
      "id": "GB-FTS-57295",
      "name": "McPhillips (Wellington) Limited R3:  6R, R5:  6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG21",
        "locality": "Telford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McPhillips (Wellington) Limited R3:  6R, R5:  6C"
      }
    },
    {
      "id": "GB-FTS-57296",
      "name": "Meldrum Structural and Civil Engineering Limited R2:  3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC2",
        "locality": "Gateshead",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Meldrum Structural and Civil Engineering Limited R2:  3C"
      }
    },
    {
      "id": "GB-FTS-57297",
      "name": "Mildren Construction Limited R4:  6C 8R, R6:  6C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKK24",
        "locality": "Christchurch",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Mildren Construction Limited R4:  6C 8R, R6:  6C 8C"
      }
    },
    {
      "id": "GB-FTS-57298",
      "name": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Stevenage",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C"
      }
    },
    {
      "id": "GB-FTS-57299",
      "name": "Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG12",
        "locality": "Worcester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C"
      }
    },
    {
      "id": "GB-FTS-57300",
      "name": "O’Brien Contractors Limited R3:  2C 4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG13",
        "locality": "Leamington Spa",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "O’Brien Contractors Limited R3:  2C 4C"
      }
    },
    {
      "id": "GB-FTS-57301",
      "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Reigate",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57302",
      "name": "P.P. O’Connor Group Limited  R2:  4R 5C 6R 7R 8R, R3:  5C 6R 7R 8R, R5:  4R 5C 6R 7R 8R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Bury",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "P.P. O’Connor Group Limited  R2:  4R 5C 6R 7R 8R, R3:  5C 6R 7R 8R, R5:  4R 5C 6R 7R 8R"
      }
    },
    {
      "id": "GB-FTS-57303",
      "name": "PBS Construction (North East) Limited R2: 1R 3R 4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "PBS Construction (North East) Limited R2: 1R 3R 4C"
      }
    },
    {
      "id": "GB-FTS-57304",
      "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57305",
      "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57306",
      "name": "P Casey & Co Ltd R2:  6R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "P Casey & Co Ltd R2:  6R"
      }
    },
    {
      "id": "GB-FTS-57307",
      "name": "VINCI Construction UK Limited R2:  4C 7C, R3:  4C 7C, R4:  4C 7C, R5:  4C 7C, R6:  4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2:  4C 7C, R3:  4C 7C, R4:  4C 7C, R5:  4C 7C, R6:  4C 7C"
      }
    },
    {
      "id": "GB-FTS-57308",
      "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57309",
      "name": "Whitehouse Construction Co. Limited R3:  4R 6C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF13",
        "locality": "Ashbourne",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Whitehouse Construction Co. Limited R3:  4R 6C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57310",
      "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1R 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1R 8C"
      }
    },
    {
      "id": "GB-FTS-57311",
      "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2:  3R 5C 9C, R3:  3R 5C 9C, R4:  2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6:  3C 5C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2:  3R 5C 9C, R3:  3R 5C 9C, R4:  2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6:  3C 5C 9C"
      }
    },
    {
      "id": "GB-FTS-57312",
      "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ13",
        "locality": "Stowe",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57313",
      "name": "Clancy Docwra Limited R2:  4R 6R 7R, R3:  4R 6R 7R, R6:  4R 6C 7R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R2:  4R 6R 7R, R3:  4R 6R 7R, R6:  4R 6C 7R"
      }
    },
    {
      "id": "GB-FTS-57314",
      "name": "Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG3",
        "locality": "Solihull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C"
      }
    },
    {
      "id": "GB-FTS-57315",
      "name": "Esh Construction Limited R2:  3C 4C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC14",
        "locality": "Durham",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Esh Construction Limited R2:  3C 4C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57316",
      "name": "Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3:  3R 4C 6C 9C, R4:  3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6:  3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3:  3R 4C 6C 9C, R4:  3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6:  3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C"
      }
    },
    {
      "id": "GB-FTS-57317",
      "name": "FP McCann Limited R7: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0A",
        "locality": "Magherafelt",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "FP McCann Limited R7: 1C"
      }
    },
    {
      "id": "GB-FTS-57318",
      "name": "Galliford Try Construction Limited R4: 1R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Uxbridge",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Galliford Try Construction Limited R4: 1R"
      }
    },
    {
      "id": "GB-FTS-57319",
      "name": "JN Bentley Limited R2: 3R 6C 7R, R3:  3R 6C 7C, R5:  3C 6C 7C,",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE22",
        "locality": "Skipton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "JN Bentley Limited R2: 3R 6C 7R, R3:  3R 6C 7C, R5:  3C 6C 7C,"
      }
    },
    {
      "id": "GB-FTS-57320",
      "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57321",
      "name": "John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R"
      }
    },
    {
      "id": "GB-FTS-57322",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3:  4R 7R, R4:  4R 7R, R5:  2R 3R 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3:  4R 7R, R4:  4R 7R, R5:  2R 3R 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57323",
      "name": "Keltbray Built Environment Limited R1a:  4C 7C, R1b:  4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2:  4R, R5:  2R, R6:  4R 7R, R7: 1C 2C 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R1a:  4C 7C, R1b:  4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2:  4R, R5:  2R, R6:  4R 7R, R7: 1C 2C 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57324",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3:  2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3:  2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57325",
      "name": "Lagan Aviation & Infrastructure Limited R2:  8R, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN06",
        "locality": "Belfast",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Lagan Aviation & Infrastructure Limited R2:  8R, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57326",
      "name": "Lowry Building and Civil Engineering Limited R7:  6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Castlederg",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Lowry Building and Civil Engineering Limited R7:  6C"
      }
    },
    {
      "id": "GB-FTS-57327",
      "name": "McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7:  3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7:  3C"
      }
    },
    {
      "id": "GB-FTS-57328",
      "name": "McPhillips (Wellington) Limited R3:  6R, R5: 1R 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG21",
        "locality": "Telford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McPhillips (Wellington) Limited R3:  6R, R5: 1R 6C"
      }
    },
    {
      "id": "GB-FTS-57329",
      "name": "Montel Civil Engineering Limited R4: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG12",
        "locality": "Worcester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Montel Civil Engineering Limited R4: 1C"
      }
    },
    {
      "id": "GB-FTS-57330",
      "name": "Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Reigate",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57331",
      "name": "RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57332",
      "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hemel Hempstead",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C"
      }
    },
    {
      "id": "GB-FTS-57333",
      "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4:  2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6:  3R 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4:  2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6:  3R 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57334",
      "name": "VINCI Construction UK Limited R2:  4C 6C 7C, R3:  4C 6C 7C, R4:  4C 6C 7C, R5:  4C 6C 7C, R6:  4C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2:  4C 6C 7C, R3:  4C 6C 7C, R4:  4C 6C 7C, R5:  4C 6C 7C, R6:  4C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57335",
      "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57336",
      "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8R, R5: 1R 8C, R6:  8C, R7: 1C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8R, R5: 1R 8C, R6:  8C, R7: 1C 8C"
      }
    },
    {
      "id": "GB-FTS-57337",
      "name": "Winvic Construction Limited R6:  2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF24",
        "locality": "Northampton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Winvic Construction Limited R6:  2R"
      }
    },
    {
      "id": "GB-FTS-57338",
      "name": "Clancy Docwra Limited R2:  4R, R3:  4R, R6:  4R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R2:  4R, R3:  4R, R6:  4R"
      }
    },
    {
      "id": "GB-FTS-57339",
      "name": "Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG3",
        "locality": "Solihull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57340",
      "name": "Esh Construction Limited R2: 1R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC14",
        "locality": "Durham",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Esh Construction Limited R2: 1R"
      }
    },
    {
      "id": "GB-FTS-57341",
      "name": "Fox Building and Engineering Limited R5: 1C, R7: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Fox Building and Engineering Limited R5: 1C, R7: 1C"
      }
    },
    {
      "id": "GB-FTS-57342",
      "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Uxbridge",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R"
      }
    },
    {
      "id": "GB-FTS-57343",
      "name": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE22",
        "locality": "Skipton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57344",
      "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57345",
      "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6:  2R 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6:  2R 3C"
      }
    },
    {
      "id": "GB-FTS-57346",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2:  3R 4R 7R, R3:  3R 4R 7R, R4:  3R 4C 7C, R5:  3R 4C 7R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2:  3R 4R 7R, R3:  3R 4R 7R, R4:  3R 4C 7C, R5:  3R 4C 7R"
      }
    },
    {
      "id": "GB-FTS-57347",
      "name": "Keltbray Built Environment Limited R1a:  4C, R1b:  4C, R1c:  4C, R1d:  4C, R5: 1R 2R, R6:  4R, R7: 1C 2C 4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R1a:  4C, R1b:  4C, R1c:  4C, R1d:  4C, R5: 1R 2R, R6:  4R, R7: 1C 2C 4C"
      }
    },
    {
      "id": "GB-FTS-57348",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57349",
      "name": "Lagan Aviation & Infrastructure Limited R2:  8C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN06",
        "locality": "Belfast",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Lagan Aviation & Infrastructure Limited R2:  8C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57350",
      "name": "McLaughlin & Harvey Limited R1a:  3C 4C 5C 8C, R1b:  3C 4C 5C 8C, R1c:  3C 4C 5C 8C, R1d:  3C 4C 5C 8C, R2:  3C 4C 5C 8C, R3:  3C 4C 5C 8C, R4:  3C 4C 5C 8C, R6:  3C 4C 5C 8C, R7:  3C 4C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McLaughlin & Harvey Limited R1a:  3C 4C 5C 8C, R1b:  3C 4C 5C 8C, R1c:  3C 4C 5C 8C, R1d:  3C 4C 5C 8C, R2:  3C 4C 5C 8C, R3:  3C 4C 5C 8C, R4:  3C 4C 5C 8C, R6:  3C 4C 5C 8C, R7:  3C 4C 8C"
      }
    },
    {
      "id": "GB-FTS-57351",
      "name": "Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Stevenage",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C"
      }
    },
    {
      "id": "GB-FTS-57352",
      "name": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57353",
      "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C"
      }
    },
    {
      "id": "GB-FTS-57354",
      "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hemel Hempstead",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C"
      }
    },
    {
      "id": "GB-FTS-57355",
      "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  3R 5C 7R, R3:  3R 5C 7R, R4:  2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6:  3R 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  3R 5C 7R, R3:  3R 5C 7R, R4:  2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6:  3R 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57356",
      "name": "VINCI Construction UK Limited R2:  2C 4C 5C 6C 7C 8C, R3:  2C 4C 5C 6C 7C 8C, R4:  2C 4C 5C 6C 7C 8C, R5:  2C 4C 5C 6C 7C 8C, R6:  2C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2:  2C 4C 5C 6C 7C 8C, R3:  2C 4C 5C 6C 7C 8C, R4:  2C 4C 5C 6C 7C 8C, R5:  2C 4C 5C 6C 7C 8C, R6:  2C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57357",
      "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57358",
      "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1C 8C"
      }
    },
    {
      "id": "GB-FTS-57359",
      "name": "Clancy Docwra Limited R6:  4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R6:  4C"
      }
    },
    {
      "id": "GB-FTS-57360",
      "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Uxbridge",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C"
      }
    },
    {
      "id": "GB-FTS-57361",
      "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57362",
      "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C"
      }
    },
    {
      "id": "GB-FTS-57363",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2:  4C 7R, R3:  4C 7R, R4:  4C 7C, R5: 1R 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2:  4C 7R, R3:  4C 7R, R4:  4C 7C, R5: 1R 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57364",
      "name": "Keltbray Built Environment Limited R4:  2R, R5:  2C, R7:  2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R4:  2R, R5:  2C, R7:  2C"
      }
    },
    {
      "id": "GB-FTS-57365",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57366",
      "name": "McLaughlin & Harvey Limited R1a:  3C 5C 8C, R1b:  3C 5C 8C, R1c:  3C 5C 8C, R1d:  3C 5C 8C, R2:  3C 5C 8C, R3:  3C 5C 8C, R4:  3C 5C 8C, R6:  3C 5C 8C, R7:  3C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McLaughlin & Harvey Limited R1a:  3C 5C 8C, R1b:  3C 5C 8C, R1c:  3C 5C 8C, R1d:  3C 5C 8C, R2:  3C 5C 8C, R3:  3C 5C 8C, R4:  3C 5C 8C, R6:  3C 5C 8C, R7:  3C 8C"
      }
    },
    {
      "id": "GB-FTS-57367",
      "name": "RJ McLeod (Contractors) Limited R1a:  7C, R1b:  7C, R1c:  7C, R1d:  7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a:  7C, R1b:  7C, R1c:  7C, R1d:  7C"
      }
    },
    {
      "id": "GB-FTS-57368",
      "name": "VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57369",
      "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57370",
      "name": "Winvic Construction Limited R3:  2R, R6:  2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF24",
        "locality": "Northampton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Winvic Construction Limited R3:  2R, R6:  2R"
      }
    },
    {
      "id": "GB-FTS-9314",
      "name": "High Courts of England and Wales",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "High Courts of England and Wales"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "018086-2022-1",
      "title": "Lot 1 – Projects of £500k to £5m",
      "value": {
        "amount": 75000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-1",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    },
    {
      "id": "018086-2022-2",
      "title": "Lot 2 – Projects of over £5m - £15m",
      "value": {
        "amount": 235000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-2",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    },
    {
      "id": "018086-2022-3",
      "title": "Lot 3 – Projects of over £15m - £30m",
      "value": {
        "amount": 390000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-3",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    },
    {
      "id": "018086-2022-4",
      "title": "Lot 4 – Projects over £30m",
      "value": {
        "amount": 860000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-4",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    }
  ],
  "description": "The key to the appointed Contractors in each lot is as follows: Regions across ALL lots, the following indicates which regions the Contractor has been appointed to: R1a – Eastern Scotland, R1b – Southwestern Scotland, R1c – North-eastern Scotland, R1d – Highlands & Irelands, R2 – North England, R3 – Midlands, R4 – Southwest England, R5 – Wales, R6 – London and Southeast England, R7 – Northern Ireland. Project Types across ALL lots, the following indicated which of the Project Types the Contractor has been appointed to, either the Core List (C) or Reserve List (R): 1 - Road Transport, 2 - Rail Transport, 3 - Water Transport, 4 - Non-renewable Energy, 5 - Nuclear Power, 6 - Water Supply, 7 - Renewable Energy, 8 - Air Transport, 9 – Telecommunications.",
  "initiationType": "tender"
}
Complete JSON history (3 releases)
3 Jul 2022 · 018086-2022 · award, contract
{
  "id": "018086-2022",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 45,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "6",
        "value": 42,
        "measure": "bids",
        "relatedLot": "2"
      },
      {
        "id": "11",
        "value": 28,
        "measure": "bids",
        "relatedLot": "3"
      },
      {
        "id": "16",
        "value": 21,
        "measure": "bids",
        "relatedLot": "4"
      },
      {
        "id": "2",
        "value": 21,
        "measure": "smeBids",
        "relatedLot": "1"
      },
      {
        "id": "7",
        "value": 12,
        "measure": "smeBids",
        "relatedLot": "2"
      },
      {
        "id": "12",
        "value": 2,
        "measure": "smeBids",
        "relatedLot": "3"
      },
      {
        "id": "17",
        "value": 1,
        "measure": "smeBids",
        "relatedLot": "4"
      },
      {
        "id": "3",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "1"
      },
      {
        "id": "8",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "2"
      },
      {
        "id": "13",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "3"
      },
      {
        "id": "18",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "4"
      },
      {
        "id": "4",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "1"
      },
      {
        "id": "9",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "2"
      },
      {
        "id": "14",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "3"
      },
      {
        "id": "19",
        "value": 0,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "4"
      },
      {
        "id": "5",
        "value": 45,
        "measure": "electronicBids",
        "relatedLot": "1"
      },
      {
        "id": "10",
        "value": 42,
        "measure": "electronicBids",
        "relatedLot": "2"
      },
      {
        "id": "15",
        "value": 28,
        "measure": "electronicBids",
        "relatedLot": "3"
      },
      {
        "id": "20",
        "value": 21,
        "measure": "electronicBids",
        "relatedLot": "4"
      }
    ]
  },
  "date": "2022-07-03T21:51:44+01:00",
  "ocid": "ocds-h6vhtk-02bb5e",
  "buyer": {
    "id": "GB-FTS-28768",
    "name": "QE Facilities Limited"
  },
  "awards": [
    {
      "id": "018086-2022-1",
      "title": "Lot 1 – Projects of £500k to £5m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57267",
          "name": "ACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C"
        },
        {
          "id": "GB-FTS-57271",
          "name": "Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,"
        },
        {
          "id": "GB-FTS-57272",
          "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2:  2R 4R 5C 6C 7C 9C, R3:  2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C"
        },
        {
          "id": "GB-FTS-57273",
          "name": "Associated Asphalt Contracting Limited R3:  8R, R4:  8R, R6:  8C"
        },
        {
          "id": "GB-FTS-57274",
          "name": "Bethell Construction Limited R2:  6R 8R, R3:  6R 8C"
        },
        {
          "id": "GB-FTS-57275",
          "name": "Britannia Construction Limited R3:  9C, R4:  4C 6C 9C"
        },
        {
          "id": "GB-FTS-57276",
          "name": "Clancy Docwra Limited R1a:  4C 6C 7C, R1b:  4C 6C 7C"
        },
        {
          "id": "GB-FTS-57277",
          "name": "Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C"
        },
        {
          "id": "GB-FTS-57278",
          "name": "CR Reynolds Limited R2: 1C, R3: 1C"
        },
        {
          "id": "GB-FTS-57279",
          "name": "Danaher & Walsh (Civil Engineering) Limited R3:  4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R"
        },
        {
          "id": "GB-FTS-57280",
          "name": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C"
        },
        {
          "id": "GB-FTS-57281",
          "name": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C"
        },
        {
          "id": "GB-FTS-57282",
          "name": "Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57283",
          "name": "Fox Building and Engineering Limited R2:  2R 4R 6C 7R 9C, R3:  2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C"
        },
        {
          "id": "GB-FTS-57284",
          "name": "FP McCann Limited R7: 1C 2C"
        },
        {
          "id": "GB-FTS-57285",
          "name": "Howard Civil Engineering Limited R2: 1C 3C 6C"
        },
        {
          "id": "GB-FTS-57286",
          "name": "J Hopkins (Contractors) Limited R2:  8R"
        },
        {
          "id": "GB-FTS-57287",
          "name": "Jackson Civil Engineering Group Limited R6:  3R"
        },
        {
          "id": "GB-FTS-57288",
          "name": "JN Bentley Limited R2:  4C 5C 6C 7C 8C, R3:  3R 4C 5C 6C 7C, R4:  8C, R5: 1C 3C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57289",
          "name": "John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57290",
          "name": "John Sisk and Son (Holdings) Limited R2:  2R, R3:  2R, R4:  2C, R6:  2C"
        },
        {
          "id": "GB-FTS-57291",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R5:  4R 6R 8R"
        },
        {
          "id": "GB-FTS-57292",
          "name": "Keltbray Built Environment Limited R1a:  4C 7C 9C, R1b:  4C 7C 9C, R1c:  4C 7C 9C, R1d:  4C 7C 9C, R5:  2R, R6:  4R 7R 9C, R7: 1R 2C 4C 7C 9C"
        },
        {
          "id": "GB-FTS-57293",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57294",
          "name": "Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C"
        },
        {
          "id": "GB-FTS-57295",
          "name": "McPhillips (Wellington) Limited R3:  6R, R5:  6C"
        },
        {
          "id": "GB-FTS-57296",
          "name": "Meldrum Structural and Civil Engineering Limited R2:  3C"
        },
        {
          "id": "GB-FTS-57297",
          "name": "Mildren Construction Limited R4:  6C 8R, R6:  6C 8C"
        },
        {
          "id": "GB-FTS-57298",
          "name": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C"
        },
        {
          "id": "GB-FTS-57299",
          "name": "Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C"
        },
        {
          "id": "GB-FTS-57300",
          "name": "O’Brien Contractors Limited R3:  2C 4C"
        },
        {
          "id": "GB-FTS-57301",
          "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57302",
          "name": "P.P. O’Connor Group Limited  R2:  4R 5C 6R 7R 8R, R3:  5C 6R 7R 8R, R5:  4R 5C 6R 7R 8R"
        },
        {
          "id": "GB-FTS-57303",
          "name": "PBS Construction (North East) Limited R2: 1R 3R 4C"
        },
        {
          "id": "GB-FTS-57304",
          "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C"
        },
        {
          "id": "GB-FTS-57305",
          "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C"
        },
        {
          "id": "GB-FTS-57306",
          "name": "P Casey & Co Ltd R2:  6R"
        },
        {
          "id": "GB-FTS-57307",
          "name": "VINCI Construction UK Limited R2:  4C 7C, R3:  4C 7C, R4:  4C 7C, R5:  4C 7C, R6:  4C 7C"
        },
        {
          "id": "GB-FTS-57308",
          "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57309",
          "name": "Whitehouse Construction Co. Limited R3:  4R 6C 8C 9C"
        },
        {
          "id": "GB-FTS-57310",
          "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1R 8C"
        }
      ],
      "relatedLots": [
        "1"
      ]
    },
    {
      "id": "018086-2022-2",
      "title": "Lot 2 – Projects of over £5m - £15m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57268",
          "name": "Alun Griffiths (Contractors) Limited R4:  3R 6C 8C, R5: 1R 2R 3R 6C 8C"
        },
        {
          "id": "GB-FTS-57311",
          "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2:  3R 5C 9C, R3:  3R 5C 9C, R4:  2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6:  3C 5C 9C"
        },
        {
          "id": "GB-FTS-57312",
          "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57313",
          "name": "Clancy Docwra Limited R2:  4R 6R 7R, R3:  4R 6R 7R, R6:  4R 6C 7R"
        },
        {
          "id": "GB-FTS-57314",
          "name": "Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C"
        },
        {
          "id": "GB-FTS-57278",
          "name": "CR Reynolds Limited R2: 1C, R3: 1C"
        },
        {
          "id": "GB-FTS-57280",
          "name": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C"
        },
        {
          "id": "GB-FTS-57281",
          "name": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C"
        },
        {
          "id": "GB-FTS-57315",
          "name": "Esh Construction Limited R2:  3C 4C 6C 7C"
        },
        {
          "id": "GB-FTS-57316",
          "name": "Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3:  3R 4C 6C 9C, R4:  3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6:  3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C"
        },
        {
          "id": "GB-FTS-57317",
          "name": "FP McCann Limited R7: 1C"
        },
        {
          "id": "GB-FTS-57318",
          "name": "Galliford Try Construction Limited R4: 1R"
        },
        {
          "id": "GB-FTS-57287",
          "name": "Jackson Civil Engineering Group Limited R6:  3R"
        },
        {
          "id": "GB-FTS-57319",
          "name": "JN Bentley Limited R2: 3R 6C 7R, R3:  3R 6C 7C, R5:  3C 6C 7C,"
        },
        {
          "id": "GB-FTS-57320",
          "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57321",
          "name": "John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R"
        },
        {
          "id": "GB-FTS-57322",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3:  4R 7R, R4:  4R 7R, R5:  2R 3R 4C 7C"
        },
        {
          "id": "GB-FTS-57323",
          "name": "Keltbray Built Environment Limited R1a:  4C 7C, R1b:  4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2:  4R, R5:  2R, R6:  4R 7R, R7: 1C 2C 4C 7C"
        },
        {
          "id": "GB-FTS-57324",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3:  2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57325",
          "name": "Lagan Aviation & Infrastructure Limited R2:  8R, R7:  8C"
        },
        {
          "id": "GB-FTS-57326",
          "name": "Lowry Building and Civil Engineering Limited R7:  6C"
        },
        {
          "id": "GB-FTS-57327",
          "name": "McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7:  3C"
        },
        {
          "id": "GB-FTS-57328",
          "name": "McPhillips (Wellington) Limited R3:  6R, R5: 1R 6C"
        },
        {
          "id": "GB-FTS-57298",
          "name": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C"
        },
        {
          "id": "GB-FTS-57329",
          "name": "Montel Civil Engineering Limited R4: 1C"
        },
        {
          "id": "GB-FTS-57330",
          "name": "Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57331",
          "name": "RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C"
        },
        {
          "id": "GB-FTS-57332",
          "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57333",
          "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4:  2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6:  3R 5C 7C"
        },
        {
          "id": "GB-FTS-57306",
          "name": "P Casey & Co Ltd R2:  6R"
        },
        {
          "id": "GB-FTS-57334",
          "name": "VINCI Construction UK Limited R2:  4C 6C 7C, R3:  4C 6C 7C, R4:  4C 6C 7C, R5:  4C 6C 7C, R6:  4C 6C 7C"
        },
        {
          "id": "GB-FTS-57335",
          "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
        },
        {
          "id": "GB-FTS-57336",
          "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8R, R5: 1R 8C, R6:  8C, R7: 1C 8C"
        },
        {
          "id": "GB-FTS-57337",
          "name": "Winvic Construction Limited R6:  2R"
        }
      ],
      "relatedLots": [
        "2"
      ]
    },
    {
      "id": "018086-2022-3",
      "title": "Lot 3 – Projects of over £15m - £30m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57269",
          "name": "Alun Griffiths (Contractors) Limited R5: 1R 2R"
        },
        {
          "id": "GB-FTS-57312",
          "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57338",
          "name": "Clancy Docwra Limited R2:  4R, R3:  4R, R6:  4R"
        },
        {
          "id": "GB-FTS-57339",
          "name": "Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C"
        },
        {
          "id": "GB-FTS-57340",
          "name": "Esh Construction Limited R2: 1R"
        },
        {
          "id": "GB-FTS-57341",
          "name": "Fox Building and Engineering Limited R5: 1C, R7: 1C"
        },
        {
          "id": "GB-FTS-57317",
          "name": "FP McCann Limited R7: 1C"
        },
        {
          "id": "GB-FTS-57342",
          "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R"
        },
        {
          "id": "GB-FTS-57343",
          "name": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C"
        },
        {
          "id": "GB-FTS-57344",
          "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C"
        },
        {
          "id": "GB-FTS-57345",
          "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6:  2R 3C"
        },
        {
          "id": "GB-FTS-57346",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2:  3R 4R 7R, R3:  3R 4R 7R, R4:  3R 4C 7C, R5:  3R 4C 7R"
        },
        {
          "id": "GB-FTS-57347",
          "name": "Keltbray Built Environment Limited R1a:  4C, R1b:  4C, R1c:  4C, R1d:  4C, R5: 1R 2R, R6:  4R, R7: 1C 2C 4C"
        },
        {
          "id": "GB-FTS-57348",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57349",
          "name": "Lagan Aviation & Infrastructure Limited R2:  8C, R7:  8C"
        },
        {
          "id": "GB-FTS-57350",
          "name": "McLaughlin & Harvey Limited R1a:  3C 4C 5C 8C, R1b:  3C 4C 5C 8C, R1c:  3C 4C 5C 8C, R1d:  3C 4C 5C 8C, R2:  3C 4C 5C 8C, R3:  3C 4C 5C 8C, R4:  3C 4C 5C 8C, R6:  3C 4C 5C 8C, R7:  3C 4C 8C"
        },
        {
          "id": "GB-FTS-57351",
          "name": "Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57352",
          "name": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57301",
          "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57353",
          "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C"
        },
        {
          "id": "GB-FTS-57354",
          "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57355",
          "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  3R 5C 7R, R3:  3R 5C 7R, R4:  2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6:  3R 5C 7C"
        },
        {
          "id": "GB-FTS-57356",
          "name": "VINCI Construction UK Limited R2:  2C 4C 5C 6C 7C 8C, R3:  2C 4C 5C 6C 7C 8C, R4:  2C 4C 5C 6C 7C 8C, R5:  2C 4C 5C 6C 7C 8C, R6:  2C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57357",
          "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
        },
        {
          "id": "GB-FTS-57358",
          "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1C 8C"
        }
      ],
      "relatedLots": [
        "3"
      ]
    },
    {
      "id": "018086-2022-4",
      "title": "Lot 4 – Projects over £30m",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-57270",
          "name": "Alun Griffiths (Contractors) Limited R4: 1R, R5: 1C"
        },
        {
          "id": "GB-FTS-57312",
          "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57359",
          "name": "Clancy Docwra Limited R6:  4C"
        },
        {
          "id": "GB-FTS-57340",
          "name": "Esh Construction Limited R2: 1R"
        },
        {
          "id": "GB-FTS-57317",
          "name": "FP McCann Limited R7: 1C"
        },
        {
          "id": "GB-FTS-57360",
          "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C"
        },
        {
          "id": "GB-FTS-57343",
          "name": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C"
        },
        {
          "id": "GB-FTS-57361",
          "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C"
        },
        {
          "id": "GB-FTS-57362",
          "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C"
        },
        {
          "id": "GB-FTS-57363",
          "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2:  4C 7R, R3:  4C 7R, R4:  4C 7C, R5: 1R 4C 7C"
        },
        {
          "id": "GB-FTS-57364",
          "name": "Keltbray Built Environment Limited R4:  2R, R5:  2C, R7:  2C"
        },
        {
          "id": "GB-FTS-57365",
          "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
        },
        {
          "id": "GB-FTS-57366",
          "name": "McLaughlin & Harvey Limited R1a:  3C 5C 8C, R1b:  3C 5C 8C, R1c:  3C 5C 8C, R1d:  3C 5C 8C, R2:  3C 5C 8C, R3:  3C 5C 8C, R4:  3C 5C 8C, R6:  3C 5C 8C, R7:  3C 8C"
        },
        {
          "id": "GB-FTS-57352",
          "name": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57301",
          "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
        },
        {
          "id": "GB-FTS-57367",
          "name": "RJ McLeod (Contractors) Limited R1a:  7C, R1b:  7C, R1c:  7C, R1d:  7C"
        },
        {
          "id": "GB-FTS-57354",
          "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C"
        },
        {
          "id": "GB-FTS-57368",
          "name": "VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C"
        },
        {
          "id": "GB-FTS-57369",
          "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7:  8C"
        },
        {
          "id": "GB-FTS-57370",
          "name": "Winvic Construction Limited R3:  2R, R6:  2R"
        }
      ],
      "relatedLots": [
        "4"
      ]
    }
  ],
  "tender": {
    "id": "AVP-QEF-1001",
    "lots": [
      {
        "id": "1",
        "title": "£500,000 to £5,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Provision of Civils and Infrastructure works projects between £500,000 and £5,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "£5,000,001 to £15,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "For the provision of Civil and Infrastructure works projects of value between £5,000,001 and £15,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "£15,000,001 to £30,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "For the provision of Civils and Infrastructure works projects with a values between £15,000,001 and £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      },
      {
        "id": "4",
        "title": "Above £30,000,000",
        "status": "cancelled",
        "hasOptions": false,
        "description": "For the provision of Civils and Infrastructure works projects greater than £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from May 2022. The framework has the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 value bands, each value band is then split in to 10 geographical regions, and each region is split in to a further 9 Project Types giving 360 Sub-Lots and each Sub-Lot will operate with a maximum of 9 contractors . This framework agreement has been advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          }
        ]
      },
      {
        "id": "4",
        "relatedLot": "4",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          }
        ]
      }
    ],
    "title": "National Framework for Civils and Infrastructure",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "techniques": {
      "hasFrameworkAgreement": true
    },
    "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, has established a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework covers, all types Civil and Infrastructure schemes. The term of this framework agreement will be for a period of 4 years from May 2022. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement involved a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework is split in to 4 lots based on value and then in to 10 geographical regions and then in a further 9 Project Types. each Sub-Lot which will operate with a maximum of 9 contractors 9 per region. This framework agreement has advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK.",
    "classification": {
      "id": "45200000",
      "scheme": "CPV",
      "description": "Works for complete or part construction and civil engineering work"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-FTS-28768",
      "name": "QE Facilities Limited",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "Gateshead",
        "postalCode": "NE9 6SX",
        "countryName": "United Kingdom",
        "streetAddress": "Estates and Facilities Department, Queen Elizabeth Hospital, Old Durham Road"
      },
      "details": {
        "url": "https://qefacilities.co.uk",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "07",
            "scheme": "COFOG",
            "description": "Health"
          }
        ]
      },
      "identifier": {
        "legalName": "QE Facilities Limited"
      },
      "contactPoint": {
        "email": "tenders@pagabo.co.uk"
      }
    },
    {
      "id": "GB-FTS-57267",
      "name": "ACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "ACS Civils Limited R2: 1C 3C, R3: 1C 3C, R7: 1C 3C"
      }
    },
    {
      "id": "GB-FTS-57268",
      "name": "Alun Griffiths (Contractors) Limited R4:  3R 6C 8C, R5: 1R 2R 3R 6C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R4:  3R 6C 8C, R5: 1R 2R 3R 6C 8C"
      }
    },
    {
      "id": "GB-FTS-57269",
      "name": "Alun Griffiths (Contractors) Limited R5: 1R 2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R5: 1R 2R"
      }
    },
    {
      "id": "GB-FTS-57270",
      "name": "Alun Griffiths (Contractors) Limited R4: 1R, R5: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R4: 1R, R5: 1C"
      }
    },
    {
      "id": "GB-FTS-57271",
      "name": "Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL21",
        "locality": "Abergavenny",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Alun Griffiths (Contractors) Limited R4: 1R 2R 3R 6C 7R 8C, R5: 1R 2R 3R 6C 7R 8C,"
      }
    },
    {
      "id": "GB-FTS-57272",
      "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2:  2R 4R 5C 6C 7C 9C, R3:  2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds ",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Amalgamated Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 9C, R1b: 1C 2C 3C 4C 5C 6C 7C 9C, R1c: 1C 2C 3C 4C 5C 6C 7C 9C, R1d: 1C 2C 3C 4C 5C 6C 7C 9C, R2:  2R 4R 5C 6C 7C 9C, R3:  2R 3R 4C 5C 6C 7C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 9C"
      }
    },
    {
      "id": "GB-FTS-57273",
      "name": "Associated Asphalt Contracting Limited R3:  8R, R4:  8R, R6:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Associated Asphalt Contracting Limited R3:  8R, R4:  8R, R6:  8C"
      }
    },
    {
      "id": "GB-FTS-57274",
      "name": "Bethell Construction Limited R2:  6R 8R, R3:  6R 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD33",
        "locality": "Manchester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Bethell Construction Limited R2:  6R 8R, R3:  6R 8C"
      }
    },
    {
      "id": "GB-FTS-57275",
      "name": "Britannia Construction Limited R3:  9C, R4:  4C 6C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Britannia Construction Limited R3:  9C, R4:  4C 6C 9C"
      }
    },
    {
      "id": "GB-FTS-57276",
      "name": "Clancy Docwra Limited R1a:  4C 6C 7C, R1b:  4C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R1a:  4C 6C 7C, R1b:  4C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57277",
      "name": "Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG3",
        "locality": "Solihull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Colas Limited R2: 1C 2C 3C 8C, R3: 1R 2C 3C 8C, R4: 1C 2C 3C 8C, R5: 1C 2C 3C 8C, R6: 1C 2C 3C 8C, R7: 1C 2C 3C 8C"
      }
    },
    {
      "id": "GB-FTS-57278",
      "name": "CR Reynolds Limited R2: 1C, R3: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE12",
        "locality": "Hessle",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "CR Reynolds Limited R2: 1C, R3: 1C"
      }
    },
    {
      "id": "GB-FTS-57279",
      "name": "Danaher & Walsh (Civil Engineering) Limited R3:  4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF22",
        "locality": "Mountsorrel",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Danaher & Walsh (Civil Engineering) Limited R3:  4R 6C 7R, R6: 1R 2R 3R 4C 6C 7R"
      }
    },
    {
      "id": "GB-FTS-57280",
      "name": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Saintfield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Dawson-Wam Limited R1a:  3C, R1b:  3C, R1c:  3C, R1d:  3C, R7:  3C 6C"
      }
    },
    {
      "id": "GB-FTS-57281",
      "name": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD4",
        "locality": "Preston",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Eric Wright Civil Engineering Limited R2: 1C 2C 3C, R3: 1C 2C 3C, R5: 1C 2C 3C"
      }
    },
    {
      "id": "GB-FTS-57282",
      "name": "Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC1",
        "locality": "Durham",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Esh Construction Limited R2: 1R 2C 3R 4C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57283",
      "name": "Fox Building and Engineering Limited R2:  2R 4R 6C 7R 9C, R3:  2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Fox Building and Engineering Limited R2:  2R 4R 6C 7R 9C, R3:  2R 4R 6C 7C 9C, R4: 1R 2R 3R 4C 6C 7C 9C, R5: 1C 2C 3R 4C 6C 7C 9C, R6: 1R 2R 3C 4C 6C 7C 9C, R7: 1C 2C 3C 4C 6C 7C 9C"
      }
    },
    {
      "id": "GB-FTS-57284",
      "name": "FP McCann Limited R7: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0",
        "locality": "Magherafelt",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "FP McCann Limited R7: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57285",
      "name": "Howard Civil Engineering Limited R2: 1C 3C 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Howard Civil Engineering Limited R2: 1C 3C 6C"
      }
    },
    {
      "id": "GB-FTS-57286",
      "name": "J Hopkins (Contractors) Limited R2:  8R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD33",
        "locality": "Manchester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "J Hopkins (Contractors) Limited R2:  8R"
      }
    },
    {
      "id": "GB-FTS-57287",
      "name": "Jackson Civil Engineering Group Limited R6:  3R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH1",
        "locality": "Ipswich",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jackson Civil Engineering Group Limited R6:  3R"
      }
    },
    {
      "id": "GB-FTS-57288",
      "name": "JN Bentley Limited R2:  4C 5C 6C 7C 8C, R3:  3R 4C 5C 6C 7C, R4:  8C, R5: 1C 3C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE22",
        "locality": "Skipton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "JN Bentley Limited R2:  4C 5C 6C 7C 8C, R3:  3R 4C 5C 6C 7C, R4:  8C, R5: 1C 3C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57289",
      "name": "John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R7: 1C 2C 3C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57290",
      "name": "John Sisk and Son (Holdings) Limited R2:  2R, R3:  2R, R4:  2C, R6:  2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2:  2R, R3:  2R, R4:  2C, R6:  2C"
      }
    },
    {
      "id": "GB-FTS-57291",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R5:  4R 6R 8R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R5:  4R 6R 8R"
      }
    },
    {
      "id": "GB-FTS-57292",
      "name": "Keltbray Built Environment Limited R1a:  4C 7C 9C, R1b:  4C 7C 9C, R1c:  4C 7C 9C, R1d:  4C 7C 9C, R5:  2R, R6:  4R 7R 9C, R7: 1R 2C 4C 7C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R1a:  4C 7C 9C, R1b:  4C 7C 9C, R1c:  4C 7C 9C, R1d:  4C 7C 9C, R5:  2R, R6:  4R 7R 9C, R7: 1R 2C 4C 7C 9C"
      }
    },
    {
      "id": "GB-FTS-57293",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1C 2C 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57294",
      "name": "Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Castlederg",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Lowry Building and Civil Engineering Limited R7: 1C 2C 3C 6C"
      }
    },
    {
      "id": "GB-FTS-57295",
      "name": "McPhillips (Wellington) Limited R3:  6R, R5:  6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG21",
        "locality": "Telford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McPhillips (Wellington) Limited R3:  6R, R5:  6C"
      }
    },
    {
      "id": "GB-FTS-57296",
      "name": "Meldrum Structural and Civil Engineering Limited R2:  3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC2",
        "locality": "Gateshead",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Meldrum Structural and Civil Engineering Limited R2:  3C"
      }
    },
    {
      "id": "GB-FTS-57297",
      "name": "Mildren Construction Limited R4:  6C 8R, R6:  6C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKK24",
        "locality": "Christchurch",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Mildren Construction Limited R4:  6C 8R, R6:  6C 8C"
      }
    },
    {
      "id": "GB-FTS-57298",
      "name": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Stevenage",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Milestone Infrastructure Limited R3: 1C 3C, R4: 1C 3C, R6: 1C 3C"
      }
    },
    {
      "id": "GB-FTS-57299",
      "name": "Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG12",
        "locality": "Worcester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Montel Civil Engineering Limited R3: 1C 3C, R4: 1C 3C"
      }
    },
    {
      "id": "GB-FTS-57300",
      "name": "O’Brien Contractors Limited R3:  2C 4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG13",
        "locality": "Leamington Spa",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "O’Brien Contractors Limited R3:  2C 4C"
      }
    },
    {
      "id": "GB-FTS-57301",
      "name": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Reigate",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Osborne Infrastructure Limited R2: 1C 2C, R3: 1C 2C, R4: 1C 2C, R6: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57302",
      "name": "P.P. O’Connor Group Limited  R2:  4R 5C 6R 7R 8R, R3:  5C 6R 7R 8R, R5:  4R 5C 6R 7R 8R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Bury",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "P.P. O’Connor Group Limited  R2:  4R 5C 6R 7R 8R, R3:  5C 6R 7R 8R, R5:  4R 5C 6R 7R 8R"
      }
    },
    {
      "id": "GB-FTS-57303",
      "name": "PBS Construction (North East) Limited R2: 1R 3R 4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "PBS Construction (North East) Limited R2: 1R 3R 4C"
      }
    },
    {
      "id": "GB-FTS-57304",
      "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4C 7C, R1b: 1C 3C 4C 7C, R1c: 1C 3C 4C 7C, R1d: 1C 3C 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57305",
      "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4: 1R 2R 3R 5C 7C, R5: 1R 2R 3R 5C 7R, R6: 1R 2R 3R 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57306",
      "name": "P Casey & Co Ltd R2:  6R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "P Casey & Co Ltd R2:  6R"
      }
    },
    {
      "id": "GB-FTS-57307",
      "name": "VINCI Construction UK Limited R2:  4C 7C, R3:  4C 7C, R4:  4C 7C, R5:  4C 7C, R6:  4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2:  4C 7C, R3:  4C 7C, R4:  4C 7C, R5:  4C 7C, R6:  4C 7C"
      }
    },
    {
      "id": "GB-FTS-57308",
      "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2C 3R 4C 5C 7C 8C, R3: 1R 2C 3R 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1C 2C 3C 4C 5C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57309",
      "name": "Whitehouse Construction Co. Limited R3:  4R 6C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF13",
        "locality": "Ashbourne",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Whitehouse Construction Co. Limited R3:  4R 6C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57310",
      "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1R 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1R 8C"
      }
    },
    {
      "id": "GB-FTS-57311",
      "name": "Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2:  3R 5C 9C, R3:  3R 5C 9C, R4:  2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6:  3C 5C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE4",
        "locality": "Leeds",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Amalgamated Construction Limited R1a: 1C 2C 3C 5C 9C, R1b: 1C 2C 3C 5C 9C, R1c: 1C 2C 3C 5C 9C, R1d: 1C 2C 3C 5C 9C, R2:  3R 5C 9C, R3:  3R 5C 9C, R4:  2R 3C 5C 9C, R5: 1C 2C 3C 5C 9C, R6:  3C 5C 9C"
      }
    },
    {
      "id": "GB-FTS-57312",
      "name": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ13",
        "locality": "Stowe",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Buckingham Group Contracting Limited - Buckingham R2: 1C 2C, R3: 1C 2C, R6: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57313",
      "name": "Clancy Docwra Limited R2:  4R 6R 7R, R3:  4R 6R 7R, R6:  4R 6C 7R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R2:  4R 6R 7R, R3:  4R 6R 7R, R6:  4R 6C 7R"
      }
    },
    {
      "id": "GB-FTS-57314",
      "name": "Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG3",
        "locality": "Solihull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Colas Limited R2: 1R 2C 8C, R3: 1R 2C 8C, R4: 1R 2C 8C, R5: 1C 2C 8C, R6: 1R 2C 8C, R7: 1C 2C 8C"
      }
    },
    {
      "id": "GB-FTS-57315",
      "name": "Esh Construction Limited R2:  3C 4C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC14",
        "locality": "Durham",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Esh Construction Limited R2:  3C 4C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57316",
      "name": "Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3:  3R 4C 6C 9C, R4:  3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6:  3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Fox Building and Engineering Limited R2: 3R 4R 6R 9C, R3:  3R 4C 6C 9C, R4:  3R 4C 6C 9C, R5: 1C 3C 4C 6C 9C, R6:  3R 4C 6C 9C, R7: 1C 3C 4C 6C 9C"
      }
    },
    {
      "id": "GB-FTS-57317",
      "name": "FP McCann Limited R7: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0A",
        "locality": "Magherafelt",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "FP McCann Limited R7: 1C"
      }
    },
    {
      "id": "GB-FTS-57318",
      "name": "Galliford Try Construction Limited R4: 1R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Uxbridge",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Galliford Try Construction Limited R4: 1R"
      }
    },
    {
      "id": "GB-FTS-57319",
      "name": "JN Bentley Limited R2: 3R 6C 7R, R3:  3R 6C 7C, R5:  3C 6C 7C,",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE22",
        "locality": "Skipton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "JN Bentley Limited R2: 3R 6C 7R, R3:  3R 6C 7C, R5:  3C 6C 7C,"
      }
    },
    {
      "id": "GB-FTS-57320",
      "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7: 1C 2C 3C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57321",
      "name": "John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2: 2R, R3: 2R, R4: 2R, R6: 2R"
      }
    },
    {
      "id": "GB-FTS-57322",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3:  4R 7R, R4:  4R 7R, R5:  2R 3R 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3R 4C 7C, R1b: 1C 2C 3R 4C 7C, R1c: 1C 2C 3R 4C 7C, R1d: 1C 2C 3C 4C 7C, R3:  4R 7R, R4:  4R 7R, R5:  2R 3R 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57323",
      "name": "Keltbray Built Environment Limited R1a:  4C 7C, R1b:  4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2:  4R, R5:  2R, R6:  4R 7R, R7: 1C 2C 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R1a:  4C 7C, R1b:  4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2:  4R, R5:  2R, R6:  4R 7R, R7: 1C 2C 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57324",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3:  2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3:  2R 3C 4C 5C 6C 7C 8C 9C, R4: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57325",
      "name": "Lagan Aviation & Infrastructure Limited R2:  8R, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN06",
        "locality": "Belfast",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Lagan Aviation & Infrastructure Limited R2:  8R, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57326",
      "name": "Lowry Building and Civil Engineering Limited R7:  6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Castlederg",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Lowry Building and Civil Engineering Limited R7:  6C"
      }
    },
    {
      "id": "GB-FTS-57327",
      "name": "McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7:  3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McLaughlin & Harvey Limited R1a: 1C 2C 3C 4C 5C 6C 7C 8C, R1b: 1C 2C 3C 4C 5C 6C 7C 8C, R1c: 1C 2C 3C 4C 5C 6C 7C 8C, R1d: 1C 2C 3C 4C 5C 6C 7C 8C, R2: 1C 2C 3C 4C 5C 6C 7C 8C, R3: 1C 2C 3C 4C 5C 6C 7C 8C, R4: 1C 2C 3C 4C 5C 6C 7C 8C, R6: 1C 2C 3C 4C 5C 6C 7C 8C, R7:  3C"
      }
    },
    {
      "id": "GB-FTS-57328",
      "name": "McPhillips (Wellington) Limited R3:  6R, R5: 1R 6C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG21",
        "locality": "Telford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McPhillips (Wellington) Limited R3:  6R, R5: 1R 6C"
      }
    },
    {
      "id": "GB-FTS-57329",
      "name": "Montel Civil Engineering Limited R4: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG12",
        "locality": "Worcester",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Montel Civil Engineering Limited R4: 1C"
      }
    },
    {
      "id": "GB-FTS-57330",
      "name": "Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Reigate",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Osborne Infrastructure Limited R2: 1R 2C, R3: 1R 2C, R4: 1C 2C, R6: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57331",
      "name": "RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a: 1C 3R 4C 7R, R1b: 1C 3R 4C 7R, R1c: 1C 3R 4C 7R, R1d: 1C 3R 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57332",
      "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hemel Hempstead",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Sir Robert McAlpine Limited R2: 1C, R3: 1R, R4: 1C, R6: 1C"
      }
    },
    {
      "id": "GB-FTS-57333",
      "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4:  2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6:  3R 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  5C 7R, R3:  5C 7R, R4:  2R 3R 5C 7C, R5: 1C 2C 3R 5C 7C, R6:  3R 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57334",
      "name": "VINCI Construction UK Limited R2:  4C 6C 7C, R3:  4C 6C 7C, R4:  4C 6C 7C, R5:  4C 6C 7C, R6:  4C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2:  4C 6C 7C, R3:  4C 6C 7C, R4:  4C 6C 7C, R5:  4C 6C 7C, R6:  4C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57335",
      "name": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  3C 4C 5C 7C 8C, R1b:  3C 4C 5C 7C 8C, R1c:  3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4:  2C 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57336",
      "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8R, R5: 1R 8C, R6:  8C, R7: 1C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8R, R5: 1R 8C, R6:  8C, R7: 1C 8C"
      }
    },
    {
      "id": "GB-FTS-57337",
      "name": "Winvic Construction Limited R6:  2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF24",
        "locality": "Northampton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Winvic Construction Limited R6:  2R"
      }
    },
    {
      "id": "GB-FTS-57338",
      "name": "Clancy Docwra Limited R2:  4R, R3:  4R, R6:  4R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R2:  4R, R3:  4R, R6:  4R"
      }
    },
    {
      "id": "GB-FTS-57339",
      "name": "Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG3",
        "locality": "Solihull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Colas Limited R2: 1C 2C, R3: 1R 2C, R4: 1C 2C, R5: 1C 2C, R6: 1R 2C, R7: 1C 2C"
      }
    },
    {
      "id": "GB-FTS-57340",
      "name": "Esh Construction Limited R2: 1R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKC14",
        "locality": "Durham",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Esh Construction Limited R2: 1R"
      }
    },
    {
      "id": "GB-FTS-57341",
      "name": "Fox Building and Engineering Limited R5: 1C, R7: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0G",
        "locality": "Omagh",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "legalName": "Fox Building and Engineering Limited R5: 1C, R7: 1C"
      }
    },
    {
      "id": "GB-FTS-57342",
      "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Uxbridge",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1R"
      }
    },
    {
      "id": "GB-FTS-57343",
      "name": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE22",
        "locality": "Skipton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "JN Bentley Limited R2:  3R 6C 7C, R3:  3R 6C 7C, R5:  3C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57344",
      "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 6C 7C, R1b: 1C 2C 3C 4C 5C 6C 7C, R1c: 1C 2C 3C 4C 5C 6C 7C, R1d: 1C 2C 3C 4C 5C 6C 7C, R2: 1C 2C 3C 4C 5C 6C 7C, R3: 1C 2C 3C 4C 5C 6C 7C, R4: 1C 2C 3C 4C 5C 6C 7C, R6: 1C 2C 3C 4C 5C 6C 7C, R7: 1C 2C 3C 4C 5C 6C 7C"
      }
    },
    {
      "id": "GB-FTS-57345",
      "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6:  2R 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6:  2R 3C"
      }
    },
    {
      "id": "GB-FTS-57346",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2:  3R 4R 7R, R3:  3R 4R 7R, R4:  3R 4C 7C, R5:  3R 4C 7R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 2C 3C 4C 7C, R1b: 1C 2C 3C 4C 7C, R1c: 1C 2C 3C 4C 7C, R1d: 1C 2C 3C 4C 7C, R2:  3R 4R 7R, R3:  3R 4R 7R, R4:  3R 4C 7C, R5:  3R 4C 7R"
      }
    },
    {
      "id": "GB-FTS-57347",
      "name": "Keltbray Built Environment Limited R1a:  4C, R1b:  4C, R1c:  4C, R1d:  4C, R5: 1R 2R, R6:  4R, R7: 1C 2C 4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R1a:  4C, R1b:  4C, R1c:  4C, R1d:  4C, R5: 1R 2R, R6:  4R, R7: 1C 2C 4C"
      }
    },
    {
      "id": "GB-FTS-57348",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2R 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2R 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57349",
      "name": "Lagan Aviation & Infrastructure Limited R2:  8C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN06",
        "locality": "Belfast",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Lagan Aviation & Infrastructure Limited R2:  8C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57350",
      "name": "McLaughlin & Harvey Limited R1a:  3C 4C 5C 8C, R1b:  3C 4C 5C 8C, R1c:  3C 4C 5C 8C, R1d:  3C 4C 5C 8C, R2:  3C 4C 5C 8C, R3:  3C 4C 5C 8C, R4:  3C 4C 5C 8C, R6:  3C 4C 5C 8C, R7:  3C 4C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McLaughlin & Harvey Limited R1a:  3C 4C 5C 8C, R1b:  3C 4C 5C 8C, R1c:  3C 4C 5C 8C, R1d:  3C 4C 5C 8C, R2:  3C 4C 5C 8C, R3:  3C 4C 5C 8C, R4:  3C 4C 5C 8C, R6:  3C 4C 5C 8C, R7:  3C 4C 8C"
      }
    },
    {
      "id": "GB-FTS-57351",
      "name": "Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Stevenage",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Milestone Infrastructure Limited R3: 1C, R4: 1C, R6: 1C"
      }
    },
    {
      "id": "GB-FTS-57352",
      "name": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Morgan Sindall Construction & Infrastructure Limited R1a: 1C 2C 4C 7C, R1b: 1C 2C 4C 7C, R1c:  4C 7C, R1d:  4C 7C, R2: 1C 2C 3C 4C 6C 7C, R3: 1C 2C 3C 4C 6C 7C, R4:  2C, R5: 1C 2C 3C 4C 6C 7C, R6: 1C 2C 3C 4C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57353",
      "name": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a: 1C 3C 4R 7C, R1b: 1C 3C 4R 7C, R1c: 1C 3C 4R 7C, R1d: 1C 3C 4R 7C"
      }
    },
    {
      "id": "GB-FTS-57354",
      "name": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hemel Hempstead",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Sir Robert McAlpine Limited R2: 1C, R3: 1C, R4: 1C, R6: 1C"
      }
    },
    {
      "id": "GB-FTS-57355",
      "name": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  3R 5C 7R, R3:  3R 5C 7R, R4:  2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6:  3R 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKE11",
        "locality": "Hull",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "C Spencer Limited R1a: 1C 2C 3C 5C 7C, R1b: 1C 2C 3C 5C 7C, R1c: 1C 2C 3C 5C 7C, R2:  3R 5C 7R, R3:  3R 5C 7R, R4:  2R 3C 5C 7C, R5: 1C 2R 3C 5C 7C, R6:  3R 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57356",
      "name": "VINCI Construction UK Limited R2:  2C 4C 5C 6C 7C 8C, R3:  2C 4C 5C 6C 7C 8C, R4:  2C 4C 5C 6C 7C 8C, R5:  2C 4C 5C 6C 7C 8C, R6:  2C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2:  2C 4C 5C 6C 7C 8C, R3:  2C 4C 5C 6C 7C 8C, R4:  2C 4C 5C 6C 7C 8C, R5:  2C 4C 5C 6C 7C 8C, R6:  2C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57357",
      "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3:  2R 3C 4C 5C 7C 8C 9C, R4: 1R 2R 3C 4C 5C 7C 8C 9C, R5:  2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C 9C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57358",
      "name": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Whitemountain Quarries Limited R2:  8C, R3:  8C, R4:  8C, R5: 1R 8C, R6:  8C, R7: 1C 8C"
      }
    },
    {
      "id": "GB-FTS-57359",
      "name": "Clancy Docwra Limited R6:  4C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Harefield",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Clancy Docwra Limited R6:  4C"
      }
    },
    {
      "id": "GB-FTS-57360",
      "name": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI",
        "locality": "Uxbridge",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Galliford Try Construction Limited R2: 1R, R3: 1R, R4: 1C"
      }
    },
    {
      "id": "GB-FTS-57361",
      "name": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN08",
        "locality": "Hillsborough",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Graham Construction Limited R1a: 1C 2C 3C 4C 5C 7C, R1b: 1C 2C 3C 4C 5C 7C, R1c: 1C 2C 3C 4C 5C 7C, R1d: 1C 2C 3C 4C 5C 7C, R2: 1C 2C 3C 4C 5C 7C, R3: 1C 2C 3C 4C 5C 7C, R4: 1C 2C 3C 4C 5C 7C, R6: 1C 2C 3C 4C 5C 7C, R7: 1C 2C 3C 4C 5C 7C"
      }
    },
    {
      "id": "GB-FTS-57362",
      "name": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "IE061",
        "locality": "Clondalkin",
        "countryName": "Ireland"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "John Sisk and Son (Holdings) Limited R2:  2R 3C, R3:  2R 3C, R4: 1R 2R 3C, R5: 1C 2C 3C, R6: 1R 2R 3C"
      }
    },
    {
      "id": "GB-FTS-57363",
      "name": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2:  4C 7R, R3:  4C 7R, R4:  4C 7C, R5: 1R 4C 7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKL13",
        "locality": "Ruthin",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Jones Bros Ruthin (Civil Engineering) Co Limited R1a: 1C 4C 7C, R1b: 1C 4C 7C, R1c: 1C 4C 7C, R1d: 1C 4C 7C, R2:  4C 7R, R3:  4C 7R, R4:  4C 7C, R5: 1R 4C 7C"
      }
    },
    {
      "id": "GB-FTS-57364",
      "name": "Keltbray Built Environment Limited R4:  2R, R5:  2C, R7:  2C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKJ26",
        "locality": "Esher",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Keltbray Built Environment Limited R4:  2R, R5:  2C, R7:  2C"
      }
    },
    {
      "id": "GB-FTS-57365",
      "name": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Salford",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Kier Infrastructure and Overseas Limited R2: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R3: 1R 2C 3C 4C 5C 6C 7C 8C 9C, R4: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R5: 1C 2C 3C 4C 5C 6C 7C 8C 9C, R6: 1R 2C 3C 4C 5C 6C 7C 8C 9C"
      }
    },
    {
      "id": "GB-FTS-57366",
      "name": "McLaughlin & Harvey Limited R1a:  3C 5C 8C, R1b:  3C 5C 8C, R1c:  3C 5C 8C, R1d:  3C 5C 8C, R2:  3C 5C 8C, R3:  3C 5C 8C, R4:  3C 5C 8C, R6:  3C 5C 8C, R7:  3C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKN0D",
        "locality": "Newtownabbey",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "McLaughlin & Harvey Limited R1a:  3C 5C 8C, R1b:  3C 5C 8C, R1c:  3C 5C 8C, R1d:  3C 5C 8C, R2:  3C 5C 8C, R3:  3C 5C 8C, R4:  3C 5C 8C, R6:  3C 5C 8C, R7:  3C 8C"
      }
    },
    {
      "id": "GB-FTS-57367",
      "name": "RJ McLeod (Contractors) Limited R1a:  7C, R1b:  7C, R1c:  7C, R1d:  7C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "RJ McLeod (Contractors) Limited R1a:  7C, R1b:  7C, R1c:  7C, R1d:  7C"
      }
    },
    {
      "id": "GB-FTS-57368",
      "name": "VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKD3",
        "locality": "Rochdale",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VINCI Construction UK Limited R2: 1C 2C 4C 5C 6C 7C 8C, R3: 1C 2C 4C 5C 6C 7C 8C, R4: 1C 2C 4C 5C 6C 7C 8C, R5: 1C 2C 4C 5C 6C 7C 8C, R6: 1C 2C 4C 5C 6C 7C 8C"
      }
    },
    {
      "id": "GB-FTS-57369",
      "name": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7:  8C",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKH23",
        "locality": "Hoddesdon",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "VolkerFitzpatrick Limited R1a:  2C 3C 4C 5C 7C 8C, R1b:  2C 3C 4C 5C 7C 8C, R1c:  2C 3C 4C 5C 7C 8C, R1d: 1C 2C 3C 4C 5C 7C 8C, R2:  2R 3C 4C 5C 7C 8C, R3: 1R 2R 3C 4C 5C 7C 8C, R4: 1R 2C 3C 4C 5C 7C 8C, R5: 1C 2C 3C 4C 5C 7C 8C, R6: 1R 2R 3C 4C 5C 7C 8C, R7:  8C"
      }
    },
    {
      "id": "GB-FTS-57370",
      "name": "Winvic Construction Limited R3:  2R, R6:  2R",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKF24",
        "locality": "Northampton",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Winvic Construction Limited R3:  2R, R6:  2R"
      }
    },
    {
      "id": "GB-FTS-9314",
      "name": "High Courts of England and Wales",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "High Courts of England and Wales"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "018086-2022-1",
      "title": "Lot 1 – Projects of £500k to £5m",
      "value": {
        "amount": 75000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-1",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    },
    {
      "id": "018086-2022-2",
      "title": "Lot 2 – Projects of over £5m - £15m",
      "value": {
        "amount": 235000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-2",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    },
    {
      "id": "018086-2022-3",
      "title": "Lot 3 – Projects of over £15m - £30m",
      "value": {
        "amount": 390000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-3",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    },
    {
      "id": "018086-2022-4",
      "title": "Lot 4 – Projects over £30m",
      "value": {
        "amount": 860000000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "018086-2022-4",
      "dateSigned": "2022-06-01T00:00:00+01:00"
    }
  ],
  "description": "The key to the appointed Contractors in each lot is as follows: Regions across ALL lots, the following indicates which regions the Contractor has been appointed to: R1a – Eastern Scotland, R1b – Southwestern Scotland, R1c – North-eastern Scotland, R1d – Highlands & Irelands, R2 – North England, R3 – Midlands, R4 – Southwest England, R5 – Wales, R6 – London and Southeast England, R7 – Northern Ireland. Project Types across ALL lots, the following indicated which of the Project Types the Contractor has been appointed to, either the Core List (C) or Reserve List (R): 1 - Road Transport, 2 - Rail Transport, 3 - Water Transport, 4 - Non-renewable Energy, 5 - Nuclear Power, 6 - Water Supply, 7 - Renewable Energy, 8 - Air Transport, 9 – Telecommunications.",
  "initiationType": "tender"
}
20 Sept 2021 · 023278-2021 · tender
{
  "id": "023278-2021",
  "tag": [
    "tender"
  ],
  "date": "2021-09-20T09:43:34+01:00",
  "ocid": "ocds-h6vhtk-02bb5e",
  "buyer": {
    "id": "GB-FTS-28768",
    "name": "QE Facilities Limited"
  },
  "tender": {
    "id": "AVP-QEF-1001",
    "lots": [
      {
        "id": "1",
        "title": "£500,000 to £5,000,000",
        "value": {
          "amount": 75000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "Provision of Civils and Infrastructure works projects between £500,000 and £5,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework will be split in to 4 separate lots, which will operate with a maximum of 9 contractors per region, per type of project, per lot. This framework agreement is being advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "contractPeriod": {
          "durationInDays": 1440
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      },
      {
        "id": "2",
        "title": "£5,000,001 to £15,000,000",
        "value": {
          "amount": 235000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "For the provision of Civil and Infrastructure works projects of value between £5,000,001 and £15,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework will be split in to 4 separate lots, which will operate with a maximum of 9 contractors per region, per type of project, per lot. This framework agreement is being advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "contractPeriod": {
          "durationInDays": 1440
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      },
      {
        "id": "3",
        "title": "£15,000,001 to £30,000,000",
        "value": {
          "amount": 390000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "For the provision of Civils and Infrastructure works projects with a values between £15,000,001 and £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework will be split in to 4 separate lots, which will operate with a maximum of 9 contractors per region, per type of project, per lot. This framework agreement is being advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "contractPeriod": {
          "durationInDays": 1440
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      },
      {
        "id": "4",
        "title": "Above £30,000,000",
        "value": {
          "amount": 860000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "For the provision of Civils and Infrastructure works projects greater than £30,000,000 in value. Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework will be split in to 4 separate lots, which will operate with a maximum of 9 contractors per region, per type of project, per lot. This framework agreement is being advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo).",
        "contractPeriod": {
          "durationInDays": 1440
        },
        "submissionTerms": {
          "variantPolicy": "notAllowed"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          }
        ]
      },
      {
        "id": "4",
        "relatedLot": "4",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45250000",
            "scheme": "CPV",
            "description": "Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry"
          },
          {
            "id": "45234000",
            "scheme": "CPV",
            "description": "Construction work for railways and cable transport systems"
          },
          {
            "id": "45246000",
            "scheme": "CPV",
            "description": "River regulation and flood control works"
          },
          {
            "id": "45243000",
            "scheme": "CPV",
            "description": "Coastal-defence works"
          },
          {
            "id": "45254000",
            "scheme": "CPV",
            "description": "Construction work for mining and manufacturing"
          },
          {
            "id": "45253000",
            "scheme": "CPV",
            "description": "Construction work for chemical-processing plant"
          },
          {
            "id": "45231000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines"
          },
          {
            "id": "45252000",
            "scheme": "CPV",
            "description": "Construction works for sewage treatment plants, purification plants and refuse incineration plants"
          },
          {
            "id": "45221000",
            "scheme": "CPV",
            "description": "Construction work for bridges and tunnels, shafts and subways"
          },
          {
            "id": "45251000",
            "scheme": "CPV",
            "description": "Construction works for power plants and heating plants"
          },
          {
            "id": "45235000",
            "scheme": "CPV",
            "description": "Construction work for airfields, runways and manoeuvring surfaces"
          },
          {
            "id": "45244000",
            "scheme": "CPV",
            "description": "Marine construction works"
          },
          {
            "id": "45241000",
            "scheme": "CPV",
            "description": "Harbour construction works"
          },
          {
            "id": "45248000",
            "scheme": "CPV",
            "description": "Construction work for hydro-mechanical structures"
          },
          {
            "id": "45233000",
            "scheme": "CPV",
            "description": "Construction, foundation and surface works for highways, roads"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          },
          {
            "id": "45245000",
            "scheme": "CPV",
            "description": "Dredging and pumping works for water treatment plant installations"
          },
          {
            "id": "45247000",
            "scheme": "CPV",
            "description": "Construction work for dams, canals, irrigation channels and aqueducts"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45222000",
            "scheme": "CPV",
            "description": "Construction work for engineering works except bridges, tunnels, shafts and subways"
          },
          {
            "id": "45236000",
            "scheme": "CPV",
            "description": "Flatwork"
          },
          {
            "id": "45255000",
            "scheme": "CPV",
            "description": "Construction work for the oil and gas industry"
          },
          {
            "id": "45232000",
            "scheme": "CPV",
            "description": "Ancillary works for pipelines and cables"
          },
          {
            "id": "45242000",
            "scheme": "CPV",
            "description": "Waterside leisure facilities construction work"
          }
        ]
      }
    ],
    "title": "National Framework for Civils and Infrastructure",
    "value": {
      "amount": 1560000000,
      "currency": "GBP"
    },
    "status": "active",
    "coveredBy": [
      "GPA"
    ],
    "documents": [
      {
        "id": "economic",
        "documentType": "economicSelectionCriteria"
      },
      {
        "id": "technical",
        "documentType": "technicalSelectionCriteria"
      }
    ],
    "bidOpening": {
      "date": "2021-10-20T12:30:00+01:00"
    },
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lotDetails": {
      "maximumLotsBidPerSupplier": null
    },
    "techniques": {
      "frameworkAgreement": {
        "periodRationale": "N/A",
        "maximumParticipants": 100
      },
      "hasFrameworkAgreement": true
    },
    "awardPeriod": {
      "startDate": "2021-10-20T12:30:00+01:00"
    },
    "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. The framework will be split in to 4 separate lots, which will operate with a maximum of 9 contractors per region, per type of project, per lot. This framework agreement is being advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK.",
    "tenderPeriod": {
      "endDate": "2021-10-20T12:00:00+01:00"
    },
    "communication": {
      "atypicalToolUrl": "https://in-tendhost.co.uk/pagabo/aspx/home"
    },
    "hasRecurrence": false,
    "reviewDetails": "As set out in the Public Contracts Regulations 2015",
    "classification": {
      "id": "45200000",
      "scheme": "CPV",
      "description": "Works for complete or part construction and civil engineering work"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "bidValidityPeriod": {
        "durationInDays": 360
      }
    },
    "submissionMethod": [
      "electronicSubmission",
      "written"
    ],
    "procurementMethod": "open",
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "https://in-tendhost.co.uk/pagabo/aspx/home",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-FTS-28768",
      "name": "QE Facilities Limited",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "Gateshead",
        "postalCode": "NE9 6SX",
        "countryName": "United Kingdom",
        "streetAddress": "Estates and Facilities Department, Queen Elizabeth Hospital, Old Durham Road"
      },
      "details": {
        "url": "https://qefacilities.co.uk",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "07",
            "scheme": "COFOG",
            "description": "Health"
          }
        ]
      },
      "identifier": {
        "legalName": "QE Facilities Limited"
      },
      "contactPoint": {
        "url": "https://in-tendhost.co.uk/pagabo/aspx/home",
        "email": "tenders@pagabo.co.uk"
      }
    },
    {
      "id": "GB-FTS-9314",
      "name": "High Courts of England and Wales",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "High Courts of England and Wales"
      }
    }
  ],
  "language": "en",
  "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes, including but not limited to; road, rail, water and air transport infrastructure, energy production infrastructure, water supply infrastructure and telecoms infrastructure. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. It should be noted that whilst the private sector has the benefit of the framework and access to the rates and contract documents, all call-off contracts by the private sector are outside the estimated contract value in the framework. The framework will be split in to 4 separate lots defined by project value, which are then divided in to a further 9 sub lots defined by project type and each sub lot is then divided in to a further 11 regions. The framework will operate with a maximum of 9 contractors per region, per type of project, per lot. This framework agreement is being advertised and tendered, so it can be utilised by all Contracting Authorities as defined in PCR2015, including Charities in the UK (the full list is available in the tender synopsis on the In-Tend portal — https://in-tendhost.co.uk/pagabo). To view the tender advert and ITT documentation, please go to https://in-tendhost.co.uk/pagabo The ITT documents can only be accessed when logged into in-tend. If you are an existing supplier, please log into the system. If you are a new supplier, please make sure you register your company as an initial step on the in-tend website. Select the tab ‘Tenders’ then select ‘Current’. Search for the reference number on the left- hand side of the page and press enter. The tender advert will now be visible. To view the ITT documents, click 'View Details'. This will take you to a new screen, please click 'Express Interest'. Once in the tender there are 5 tabs; 'Tender', 'ITT -documents', 'Correspondence', 'Clarifications' and 'History'. Select the second tab (ITT docs) where you will find useful information under 'Tender Details'. Continue to scroll down to the heading 'Tender Documents Received' where you will be able to view/download the documents. Opting In and out: please note you are required to 'Opt In' before you can access the 'My Tender Return' to start populating your response. The 'Opt Out' functionality will also be available throughout the duration of the tender process. Opting out will give you the option of declaring that you no longer wish to receive any further communication in relation to this tender along with the opportunity of providing feedback and comments for this decision. You may amend your decision to ‘Opt In or Out’ at any time during the tender process. This procurement will be evaluated in accordance with the process set out in the bid pack documentation. Pagabo, on behalf of the contracting authority reserves the right to run all stages of the procurement concurrently. Pagabo, on behalf of the contracting authority reserves the right:(i) not to award any framework agreement, as a result of the procurement process, commenced by publication of this notice;(ii) in the event that there is a substantive challenge to the procurement and such challenge is confined to a single lot, Pagabo, on behalf of the contracting authority, reserves the right to the extent that it is lawful to do so to conclude a framework agreement with the successful bidder(s) in respect of the lot(s) that have not been challenged; and(iii) make whatever changes it may see fit to the content and structure of the tendering competition.",
  "initiationType": "tender"
}
14 Jun 2021 · 013291-2021 · planning
{
  "id": "013291-2021",
  "tag": [
    "planning"
  ],
  "date": "2021-06-14T09:28:06+01:00",
  "ocid": "ocds-h6vhtk-02bb5e",
  "buyer": {
    "id": "GB-FTS-19383",
    "name": "QE Facilities Limited"
  },
  "tender": {
    "id": "ocds-h6vhtk-02bb5e",
    "lots": [
      {
        "id": "1",
        "title": "Up to £500,000",
        "status": "planned",
        "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. It is anticipated that this lot will cover, all types of Public Sector Civil and Infrastructure schemes up to £500,000 in value"
      },
      {
        "id": "2",
        "title": "£500,000 to £5,000,000",
        "status": "planned",
        "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. It is anticipated that this lot will cover, all types of Public Sector Civil and Infrastructure schemes between £500,000 and £5,000,000 in value"
      },
      {
        "id": "3",
        "title": "£5,000,000 to £15,000,000",
        "status": "planned",
        "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. It is anticipated that this lot will cover, all types of Public Sector Civil and Infrastructure schemes between £5,000,000 and £15,000,000 in value"
      },
      {
        "id": "4",
        "title": "£15,000,000 to £30,000,000",
        "status": "planned",
        "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. It is anticipated that this lot will cover, all types of Public Sector Civil and Infrastructure schemes between £15,000,000 and £30,000,000 in value"
      },
      {
        "id": "5",
        "title": "£30m and over",
        "status": "planned",
        "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. It is anticipated that this lot will cover, all types of Public Sector Civil and Infrastructure schemes greater than £30,000,000 in value"
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45251160",
            "scheme": "CPV",
            "description": "Wind-power installation works"
          },
          {
            "id": "45251120",
            "scheme": "CPV",
            "description": "Hydro-electric plant construction work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45251160",
            "scheme": "CPV",
            "description": "Wind-power installation works"
          },
          {
            "id": "45251120",
            "scheme": "CPV",
            "description": "Hydro-electric plant construction work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45251160",
            "scheme": "CPV",
            "description": "Wind-power installation works"
          },
          {
            "id": "45251120",
            "scheme": "CPV",
            "description": "Hydro-electric plant construction work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          }
        ]
      },
      {
        "id": "4",
        "relatedLot": "4",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45251160",
            "scheme": "CPV",
            "description": "Wind-power installation works"
          },
          {
            "id": "45251120",
            "scheme": "CPV",
            "description": "Hydro-electric plant construction work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          }
        ]
      },
      {
        "id": "5",
        "relatedLot": "5",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45240000",
            "scheme": "CPV",
            "description": "Construction work for water projects"
          },
          {
            "id": "45251160",
            "scheme": "CPV",
            "description": "Wind-power installation works"
          },
          {
            "id": "45251120",
            "scheme": "CPV",
            "description": "Hydro-electric plant construction work"
          },
          {
            "id": "45230000",
            "scheme": "CPV",
            "description": "Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork"
          },
          {
            "id": "45220000",
            "scheme": "CPV",
            "description": "Engineering works and construction works"
          }
        ]
      }
    ],
    "title": "National Framework for Civils and Infrastructure",
    "value": {
      "amount": 1560000000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Added Value Portal t/a Pagabo and acting on behalf of QE Facilities Limited, wishes to establish a framework of contractors capable of delivering Civil and Infrastructure schemes within the UK for the whole of the Public Sector. The framework will cover, all types Civil and Infrastructure schemes. It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021. The framework shall have the facility for Clients to Direct Award and Further Compete their requirement. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. To register your interest in this framework, then please follow this link to Pagabo’s In-Tend tendering portal - https://in-tendhost.co.uk/pagabo/aspx/home. A virtual market engagement meeting is being held on the 23rd June 2021 at 11am via Zoom. To be part of the market engagement session, please register using the following link: https://us02web.zoom.us/webinar/register/WN_ZWdetCtPT_agZzStHiEd5A",
    "communication": {
      "atypicalToolUrl": "https://in-tendhost.co.uk/pagabo/aspx/home",
      "futureNoticeDate": "2021-07-15T00:00:00+01:00"
    },
    "classification": {
      "id": "45200000",
      "scheme": "CPV",
      "description": "Works for complete or part construction and civil engineering work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-19383",
      "name": "QE Facilities Limited",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKC22",
        "locality": "Gateshead",
        "postalCode": "NE9 6SX",
        "countryName": "United Kingdom",
        "streetAddress": "Estates and Facilities Department,Queen Elizabeth Hospital, Old Durham Road"
      },
      "details": {
        "url": "https://www.qefacilities.co.uk",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "07",
            "scheme": "COFOG",
            "description": "Health"
          }
        ]
      },
      "identifier": {
        "legalName": "QE Facilities Limited"
      },
      "contactPoint": {
        "email": "tenders@pagabo.co.uk"
      }
    }
  ],
  "language": "en",
  "description": "To register your interest in this framework, then please follow this link to Pagabo’s In-Tend tendering portal - https://in-tendhost.co.uk/pagabo/aspx/home. Where you will be required to either create an account or login, if you already have an account. Once logged in, locate the National Framework for Civils and Infrastructure, under Current Tenders and click the \"express interest\" button. Once you have expressed an interest, you will then automatically receive an update from the In-Tend portal as and when the tender documents for the framework have been published.It is proposed that the term of this framework agreement will be for a period of 4 years from November 2021 . The framework shall have the facility for Clients to Direct Award and Further Compete their requirement.  The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure.A market engagement meeting is being held on the 23rd June 2021 at 11am via Zoom. To be part of the market engagement session, please register using the following link: https://us02web.zoom.us/webinar/register/WN_ZWdetCtPT_agZzStHiEd5AThe framework shall be open to all public sector Bodies within the UK, including:•\tNHS Organisations•\tLocal Authorities•\tMaritime Ports•\tAirports•\tPolice and Emergency Services•\tLeisure•\tSchools, Academies, Further Education & Universities•\tHealth and Social Care Providers•\tCentral Government Departments and Agencies•\tMinistry of Defence•\tHousing Associations•\tRegistered Charities•\tRegeneration•\tLibraries & MuseumsThe framework will also be available for the use by the Channel Islands and open to the Private sector to use particularly private organisations set up by the public sector to deliver public sector services.",