Official UK procurement notice
MGCC Working at Height · UK public procurement notice
Authority: Ministry of Defence (Central government)
What is being bought
Published requirement descriptionmanufacture and procurement of a working at height safety system for the Medium Girder Bridge (MGB) sets
CPV: Construction work for bridges
The lotProcurement structure
single lot · no lot value publishedWhat it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Lowest price
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated without publication of a contract notice
- Legal basis
- CELEX · 32009L0081 Defence and Security Public Contracts Regulations 2011 (Directive 2009/81/EC)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 13 Apr 2022, 10:50 BST
- Last source update
- 13 Apr 2022, 10:50 BST
- FTS notice number
2022/S 000-009853- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-032d1aFind a Tender
- Why no open competition
- Additional deliveries by the original supplier ordered under the strict conditions stated in the directive
- Published justification
The Operational Infrastructure programme team, part of the UK Ministry of Defence (MOD), intends to place a Contract with WFEL Ltd for the provision of demonstration and manufacture of a working at height safety system for the Medium Girder Bridge (MGB) sets which was not included in the original MGB Manufacture Contract. The length of the contract will be 4 and the value approximately £3.85M. This safety system has become necessary because standard safety equipment and systems of work across all bridge configurations are now required to ensure compliance with current Working at Height legislation (WaH). The current risk to life from a WaH accident during construction of an MGB is a Class C risk. In order to comply with Health and Safety Executive (HSE) legislation based on Cost Benefit Analysis (CBA) the Army (as the employer) must do all they can to reduce the risk of working at height (WaH) to ALARP.
The value of these additional works is less than 50% of the value of the consideration payable under the original contract.
In accordance with regulation 4 of The Defence and Security Public Contracts (Amendment) (EU Exit) Regulations 2019 (SI 2019/697) this procurement falls to be regulated under the provisions of the Defence and Security Public Contracts Regulations 2011 as amended (in particular by SI 2019/697 and SI 2020/1450). Prior publication of a contract notice in the Official Journal of the European Union is no longer appropriate. It is considered that the award of the contract without prior publication of a contract notice in the UK e-notification service is lawful in accordance with Regulation 16(1)(d)(i) of the Defence and Security Public Contracts Regulations 2011 additional works.
These additional works cannot for technical reasons be carried out or provided separately from those under the original contract without major inconvenience to the MOD because the original equipment manufacturer (OEM) has already been contracted through an Assessment Phase Contract to investigate and propose a WAH Safety Solution. The End User (Army) have paid for and reviewed this proposal and are content that it will meet the WaH legislation and wish to proceed with WFEL’s proposed solution which is currently being developed into a prototype ready to trial. Any deviation from this chosen solution will cause a time delay to the introduction of critical safety equipment and be an economic and resource inconvenience to the Authority. Additionally, following a thorough investigation, the Master Data Packs for MGB (containing all the necessary technical information for a competent engineering company to manufacture the bridge sets) are not available to the Authority to provide to a 3rd party. Therefore a 3rd party supplier would need to design and engineer a WaH system from the ground up without access to any of the MGB technical information. This would result in significant design and production line set up costs and carries a performance and quality risk of components being incompatible with the existing MGB system. As WFEL are the OEM for the MGB, they will have no such incompatibility issues.
The Cyber Risk Profile for this requirement identified by the Cyber Risk Assessment is Very Low. Reference 600646679.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecastContracting authority & participating public bodies
Dispute resolution & review bodies
- Defence Equipment and SupportReview body
Bidders & participating suppliers
1 commercial party on the notice- WFEL LtdAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.