Find a TenderClosed
Published 8 Mar 2023, 17:07 GMT

Official UK procurement notice

LPS CAS - A601(M) Maintenance Project

Official notice

Authority: Lancashire County Council (Local council)

WorksOpen procedure
Published estimate£4,600,000exc. VAT
Submissions closed 26 Apr 2023

What is being bought

Published requirement description

The Works substantially consist of repairs to Higher North Road bridge whilst carrying out various works for the purpose of revoking the motorway status of the A601(M) via conversion into a dual carriageway with a 50mph speed limit. This will involve replacing hard shoulders where necessary with grass verges and laying a new asphalt overlay to the road surface together with new lines and road studs. Changes to signage and some improvements to drainage and landscaping will also be incorporated.

The full scope of the project is contained at ITT Appendix 11 and the associated contractual documents. If tendering, please ensure that you read all documentation in the preparation of your Tender and should you have any queries on the content of the documentation, please raise a clarification request in the manner described in the ITT Instructions & Guidance document at paragraph 2.7 and within the timescales outlined within paragraph 3.1.

CPV: Bridge renewal construction work · Construction work · Road-maintenance works

The lotProcurement structure

single lot · value published
Lot #1Published value£4,600,000
Delivery: North West · A601(M) , Carnforth
Variant bids: not allowed

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
8 Mar 2023, 17:07 GMT
Last source update
24 Mar 2023, 16:09 GMT
Award evaluation window
12 Apr 2023 – …
Authority reference
LCC13038 (Oracle Fusion Negotiation reference)
FTS notice number
2023/S 000-008717
Classification (CPV)
Bridge renewal construction workConstruction workRoad-maintenance works
Delivery area
North West (UKD4)
Official registry OCID
ocds-h6vhtk-03b0b6 Find a Tender

How it was run

Official notice
Run through: portal not identified
Language: EN
Submission deadline
26 Apr 2023, 10:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bids opened
12 Apr 2023, 11:00 BST
Detailed submission instructions & authority contactsFrom official release

Timeline

24 Mar 2023 → 26 Apr 2023 · 3 dates
  1. Notice published
    24 Mar 2023, 16:09 GMT
  2. Bids opened
    12 Apr 2023, 11:00 BST
  3. Submission deadline
    26 Apr 2023, 10:00 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Deadline moved to 26 Apr 2023, 10:00 BST
    24 Mar 2023, 16:09 GMT
    +14 days · was 12 Apr 2023, 10:00 BST
Published amendments (1 · 1 deadline change)
WhenWhatBeforeAfterShift
—DeadlineIV.2.212 Apr 202326 Apr 2023+14 d
—Bid openingIV.2.712 Apr 202326 Apr 2023+14 d
—TextII.1.4The Works substantially consist of repairs to Higher North Road bridge whilst carrying out various works for the purpose of revoking the motorway status of the A601(M) via conversion into a dual carriageway with a 50mph speed limit. This will involve replacing hard shoulders where necessary with grass verges and laying a new asphalt overlay to the road surface together with new lines and road stud…The works for this project substantially consist of repairs and maintenance work to a number of structures on the A601(M) including Higher North Road bridge and others. The full scope of the project is contained at ITT Appendix 11 and the associated contractual documents. If tendering, please ensure that you read all documentation in the preparation of your Tender and should you have any queries o…
—TextII.2.4The Works substantially consist of repairs to Higher North Road bridge whilst carrying out various works for the purpose of revoking the motorway status of the A601(M) via conversion into a dual carriageway with a 50mph speed limit. This will involve replacing hard shoulders where necessary with grass verges and laying a new asphalt overlay to the road surface together with new lines and road stud…The works for this project substantially consist of repairs and maintenance work to a number of structures on the A601(M) including Higher North Road bridge and others. The full scope of the project is contained at ITT Appendix 11 and the associated contractual documents. If tendering, please ensure that you read all documentation in the preparation of your Tender and should you have any queries o…

Corrigendum of 24/03/2023 - revised tender return deadline and opening date/time, and amendment to descriptions to remove wording relating to the wider scope of the project (not included in this tender).

Contracting authority & participating public bodies

Lancashire County Council

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Fishergate, Preston, North West, PR18XJContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • The Institution of Civil EngineersReview body London

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria