Official UK procurement notice
Legacy Concrete Roads Reconstruction Framework
Authority: National Highways Limited (Central government)
What is being bought
Published requirement descriptionNational Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes.
The framework scope for the LCRR framework includes:
- design and subsequent construction services for:
- demolition of existing concrete pavements,
- reconstruction of pavements (including new pavement furniture and markings)
- design and delivery of associated temporary traffic management solutions,
- when instructed:
- involvement in optioneering,
- design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage, street furniture and its foundations and signage,
- design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings),
- performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”)
- carbon capture recording and reporting,
- recovery, recycling and reuse of arisings during the delivery of a scheme,
- engagement with all identified stakeholders, and
- identification, recording and realisation of programme efficiencies.
The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4.
This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations.
From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement.
Works will be allocated as per the Framework Information document.
CPV: Access road construction work · Carriageway resurfacing works · Construction work for elevated highways · Construction work for highways · Construction work for highways, roads · Construction, foundation and surface works for highways, roads · Design consultancy services · Dual carriageway construction work · Engineering design services · Erection of road-barriers · Foundation work for highways · Foundation work for highways, roads, streets and footpaths · +24 more
How this framework works
From the published notice- Places
- up to 3 suppliers · 7 bids received (2.3 per place) · 3 appointed (full)
The lotProcurement structure
single lot · no lot value publishedWhat it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (3)
- Quality: 50%
- Social Value: 10%
- Price: 40%
- Suitability
As stated in the procurement documents
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “Legacy Concrete Roads Reconstruction Framework” is a framework: the contest is a place on its panel, up to 3 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 22 Jan 2025, 16:33 GMT
- Last source update
- 3 Mar 2026, 17:16 GMT
- Award evaluation window
- 5 Mar 2025 – …
- FTS notice number
2026/S 000-019207- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04d58eFind a Tender
- Review procedure
National Highways will incorporate a minimum 10 day standstill period at the point information on award of the contract is communicated to tenderers. Appeals should be lodged in accordance with the Public Contracts Regulations 2015 (SI 2015/102) as amended.
How it was run
Official notice- Appointment period ends
- 5 Mar 2025, 15:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 360 days from the deadline
- Bids opened
- 5 Mar 2025, 15:01 GMT
Timeline
5 Mar 2025 → 3 Mar 2026 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown5 Mar 2025, 15:00 GMT
- Bids opened5 Mar 2025, 15:01 GMT
- Notice published237 days ago3 Mar 2026, 17:16 GMT
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete3 Mar 2026, 17:16 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast3 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 3 of these contracts carry the same published figure, £968,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Contract 019207-2026-1
- Signed
- 9 Feb 2026
- Value
- ceiling above
- Status
- active
Contract 019207-2026-2
- Signed
- 9 Feb 2026
- Value
- ceiling above
- Status
- active
Contract 019207-2026-3
- Signed
- 9 Feb 2026
- Value
- ceiling above
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 7bids · 7 electronic | — | — | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
3 commercial parties on the notice- John Graham Construction LtdFramework contractor
- John Sisk and Son LtdFramework contractor
- Kier Transportation LimitedFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria