← Back to search results

plannedFind a Tender · planning
BuyerCauseway Coast and Glens Borough Council
Statusplanned
DeadlineNot published
Value£12,300,000
Published25 Apr 2024

What is being bought

PROJECT & CONSULTATION CONTEXT Causeway Coast & Glens Borough Council is undertaking a proposed development of new Leisure Facilities at Lands between 13-39 Quay Road, Ballycastle. The project is jointly funded through the UK Government’s ‘Levelling Up’ initiative and Causeway Coast & Glens Borough Council. PROPOSED FACILITIES The proposed facilities consist of a 25m swimming pool (4 lane), gym, large studio, changing, reception/office, splash area and modest spa features, vending area, changing places facility, bouldering wall, outdoor pump track, off-road running/walking trail and accessible play park. Leisure Centre The proposed Leisure Centre has been carefully positioned to be respectful of the existing urban grain of the Conservation Area, with all facilities located on a single ground floor level to maintain key views from Quay Road to the Tow Valley beyond. The pitched roof forms reference the existing typologies of the surrounding residential context, with one roof form rising to address Quay Road and Ballycastle town, and the other rising to address the surrounding rural context and natural landscape of the Tow Valley and Fair Head. The proposed material palette of buff brick is a contemporary interpretation of the colour and texture of the buff sandstone used within some of the key civic buildings of Ballycastle, including the Holy Trinity Church at ‘The Diamond’ in the heart of the town. Outdoor Pump Track The proposed Outdoor Pump Track is located to the north of the site and designed to provide an exciting riding experience for all age groups and abilities. The track will be +100m in length and finished in hard-wearing asphalt to form a variety of straights, bends and raised berms, which can be used by both bicycles and scooters. A secure fenced boundary with gated access will be provided to the perimeter of both the pump track and play park to create safe leisure spaces for young children and mitigate against anti-social behaviour. Accessible Play Park The Accessible Play Park has been located to the south of the site where the existing topography facilitates universal access and to improve connectivity with the proposed Leisure Centre building. The concept design aims to provide a wide range of stimulating play experiences, catering for children of all ages and abilities. This includes careful consideration of specific play equipment that can be used by children with reduced mobility and the provision of multi-sensory play experiences including tactile surfacing, landscaping and interactive play panels. ENVIRONMENTAL DESIGN & PERFORMANCE The proposed Leisure Centre Building will be designed and delivered to achieve an environmental performance level of Operational Net Zero in line with Causeway Coast & Glens Borough Council’s commitment to achieving Net Zero Emissions for all new Council Buildings. This performance standard means that the amount of carbon emissions associated with the building’s operational energy requirements on an annual basis is zero or negative. The proposed environmental strategy for the building includes: • A ‘Fabric First’ approach to the design of all building elements to improve thermal performance • High efficiency heating, cooling, ventilation, lighting and hot water generation systems • Control of solar gain through carefully positioned glazing and shading systems • On-site renewable energy technologies including photovoltaic solar panels and heat pumps SITE ACCESS DESIGN, PARKING & LANDSCAPING The existing site entrance will be upgraded to provide a new right turn lane, creating safe and efficient access to the facilities for both motorists and pedestrians. A new car park with carefully positioned accessible parking, drop-off point and coach parking will also be provided to facilitate a wide variety of user groups across the development site. The current concept design provides 100 car and 4 coach parking spaces. Pockets of landscaping with native shrubs and trees will be planted

Delivery location

UKN0C

Categories

Leisure centre construction work 45212110Leisure centre construction work 45212110

Lot details

Lot 1

PROJECT & CONSULTATION CONTEXT Causeway Coast & Glens Borough Council is undertaking a proposed development of new Leisure Facilities at Lands between 13-39 Quay Road, Ballycastle. The project is jointly funded through the UK Government’s ‘Levelling Up’ initiative and Causeway Coast & Glens Borough Council. PROPOSED FACILITIES The proposed facilities consist of a 25m swimming pool (4 lane), gym, large studio, changing, reception/office, splash area and modest spa features, vending area, changing places facility, bouldering wall, outdoor pump track, off-road running/walking trail and accessible play park. Leisure Centre The proposed Leisure Centre has been carefully positioned to be respectful of the existing urban grain of the Conservation Area, with all facilities located on a single ground floor level to maintain key views from Quay Road to the Tow Valley beyond. The pitched roof forms reference the existing typologies of the surrounding residential context, with one roof form rising to address Quay Road and Ballycastle town, and the other rising to address the surrounding rural context and natural landscape of the Tow Valley and Fair Head. The proposed material palette of buff brick is a contemporary interpretation of the colour and texture of the buff sandstone used within some of the key civic buildings of Ballycastle, including the Holy Trinity Church at ‘The Diamond’ in the heart of the town. Outdoor Pump Track The proposed Outdoor Pump Track is located to the north of the site and designed to provide an exciting riding experience for all age groups and abilities. The track will be +100m in length and finished in hard-wearing asphalt to form a variety of straights, bends and raised berms, which can be used by both bicycles and scooters. A secure fenced boundary with gated access will be provided to the perimeter of both the pump track and play park to create safe leisure spaces for young children and mitigate against anti-social behaviour. Accessible Play Park The Accessible Play Park has been located to the south of the site where the existing topography facilitates universal access and to improve connectivity with the proposed Leisure Centre building. The concept design aims to provide a wide range of stimulating play experiences, catering for children of all ages and abilities. This includes careful consideration of specific play equipment that can be used by children with reduced mobility and the provision of multi-sensory play experiences including tactile surfacing, landscaping and interactive play panels. ENVIRONMENTAL DESIGN & PERFORMANCE The proposed Leisure Centre Building will be designed and delivered to achieve an environmental performance level of Operational Net Zero in line with Causeway Coast & Glens Borough Council’s commitment to achieving Net Zero Emissions for all new Council Buildings. This performance standard means that the amount of carbon emissions associated with the building’s operational energy requirements on an annual basis is zero or negative. The proposed environmental strategy for the building includes: • A ‘Fabric First’ approach to the design of all building elements to improve thermal performance • High efficiency heating, cooling, ventilation, lighting and hot water generation systems • Control of solar gain through carefully positioned glazing and shading systems • On-site renewable energy technologies including photovoltaic solar panels and heat pumps SITE ACCESS DESIGN, PARKING & LANDSCAPING The existing site entrance will be upgraded to provide a new right turn lane, creating safe and efficient access to the facilities for both motorists and pedestrians. A new car park with carefully positioned accessible parking, drop-off point and coach parking will also be provided to facilitate a wide variety of user groups across the development site. The current concept design provides 100 car and 4 coach parking spaces. Pockets of landscaping with native shrubs and trees will be planted

Statusplanned

What is included

ItemCategoryQuantity
1Leisure centre construction workNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Leisure centre construction work (45212110); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1294 median · 30.2 average (5,652 of 17,129 with a bid count)3.8 average (6,247 of 17,129 with named award suppliers)Not published
Same buyer3Not publishedNot publishedNot published
Delivery region: UKN0C113 median · 3 average (1 of 11 with a bid count)1 average (1 of 11 with named award suppliers)Not published
Similar published value (0.5×–2×)1,2335 median · 9.8 average (10 of 1,233 with a bid count)4.1 average (10 of 1,233 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-045527
Latest release ID013461-2024
Latest release timestampThu Apr 25 2024 13:46:17 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statusplanned
Procurement methodNot published
Procurement method detailsNot published
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender value£12,300,000
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
25 Apr 2024planning013461-2024

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "013461-2024",
  "tag": [
    "planning"
  ],
  "date": "2024-04-25T14:46:17+01:00",
  "ocid": "ocds-h6vhtk-045527",
  "buyer": {
    "id": "GB-FTS-112008",
    "name": "Causeway Coast and Glens Borough Council"
  },
  "tender": {
    "id": "ocds-h6vhtk-045527",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "description": "PROJECT & CONSULTATION CONTEXT\nCauseway Coast & Glens Borough Council is undertaking a proposed development of new Leisure Facilities at Lands between 13-39 Quay Road, Ballycastle. The project is jointly funded through the UK Government’s ‘Levelling Up’ initiative and Causeway Coast & Glens Borough Council. \nPROPOSED FACILITIES\nThe proposed facilities consist of a 25m swimming pool (4 lane), gym, large studio, changing, reception/office, splash area and modest spa features, vending area, changing places facility, bouldering wall, outdoor pump track, off-road running/walking trail and accessible play park.\nLeisure Centre\nThe proposed Leisure Centre has been carefully positioned to be respectful of the existing urban grain of the Conservation Area, with all facilities located on a single ground floor level to maintain key views from Quay Road to the Tow Valley beyond. The pitched roof forms reference the existing typologies of the surrounding residential context, with one roof form rising to address Quay Road and Ballycastle town, and the other rising to address the surrounding rural context and natural landscape of the Tow Valley and Fair Head. The proposed material palette of buff brick is a contemporary interpretation of the colour and texture of the buff sandstone used within some of the key civic buildings of Ballycastle, including the Holy Trinity Church at ‘The Diamond’ in the heart of the town. \nOutdoor Pump Track\nThe proposed Outdoor Pump Track is located to the north of the site and designed to provide an exciting riding experience for all age groups and abilities. The track will be +100m in length and finished in hard-wearing asphalt to form a variety of straights, bends and raised berms, which can be used by both bicycles and scooters. A secure fenced boundary with gated access will be provided to the perimeter of both the pump track and play park to create safe leisure spaces for young children and mitigate against anti-social behaviour.\nAccessible Play Park\nThe Accessible Play Park has been located to the south of the site where the existing topography facilitates universal access and to improve connectivity with the proposed Leisure Centre building. The concept design aims to provide a wide range of stimulating play experiences, catering for children of all ages and abilities. This includes careful consideration of specific play equipment that can be used by children with reduced mobility and the provision of multi-sensory play experiences including tactile surfacing, landscaping and interactive play panels.\nENVIRONMENTAL DESIGN & PERFORMANCE\nThe proposed Leisure Centre Building will be designed and delivered to achieve an environmental performance level of Operational Net Zero in line with Causeway Coast & Glens Borough Council’s commitment to achieving Net Zero Emissions for all new Council Buildings. This performance standard means that the amount of carbon emissions associated with the building’s operational energy requirements on an annual basis is zero or negative. The proposed environmental strategy for the building includes:\n•\tA ‘Fabric First’ approach to the design of all building elements to improve thermal performance\n•\tHigh efficiency heating, cooling, ventilation, lighting and hot water generation systems\n•\tControl of solar gain through carefully positioned glazing and shading systems\n•\tOn-site renewable energy technologies including photovoltaic solar panels and heat pumps\nSITE ACCESS DESIGN, PARKING & LANDSCAPING\nThe existing site entrance will be upgraded to provide a new right turn lane, creating safe and efficient access to the facilities for both motorists and pedestrians. A new car park with carefully positioned accessible parking, drop-off point and coach parking will also be provided to facilitate a wide variety of user groups across the development site. The current concept design provides 100 car and 4 coach parking spaces. Pockets of landscaping with native shrubs and trees will be planted"
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKN0C"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45212110",
            "scheme": "CPV",
            "description": "Leisure centre construction work"
          }
        ]
      }
    ],
    "title": "Information Only",
    "value": {
      "amount": 12300000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "PROJECT & CONSULTATION CONTEXT\nCauseway Coast & Glens Borough Council is undertaking a proposed development of new Leisure Facilities at Lands between 13-39 Quay Road, Ballycastle. The project is jointly funded through the UK Government’s ‘Levelling Up’ initiative and Causeway Coast & Glens Borough Council. \nPROPOSED FACILITIES\nThe proposed facilities consist of a 25m swimming pool (4 lane), gym, large studio, changing, reception/office, splash area and modest spa features, vending area, changing places facility, bouldering wall, outdoor pump track, off-road running/walking trail and accessible play park.\nLeisure Centre\nThe proposed Leisure Centre has been carefully positioned to be respectful of the existing urban grain of the Conservation Area, with all facilities located on a single ground floor level to maintain key views from Quay Road to the Tow Valley beyond. The pitched roof forms reference the existing typologies of the surrounding residential context, with one roof form rising to address Quay Road and Ballycastle town, and the other rising to address the surrounding rural context and natural landscape of the Tow Valley and Fair Head. The proposed material palette of buff brick is a contemporary interpretation of the colour and texture of the buff sandstone used within some of the key civic buildings of Ballycastle, including the Holy Trinity Church at ‘The Diamond’ in the heart of the town. \nOutdoor Pump Track\nThe proposed Outdoor Pump Track is located to the north of the site and designed to provide an exciting riding experience for all age groups and abilities. The track will be +100m in length and finished in hard-wearing asphalt to form a variety of straights, bends and raised berms, which can be used by both bicycles and scooters. A secure fenced boundary with gated access will be provided to the perimeter of both the pump track and play park to create safe leisure spaces for young children and mitigate against anti-social behaviour.\nAccessible Play Park\nThe Accessible Play Park has been located to the south of the site where the existing topography facilitates universal access and to improve connectivity with the proposed Leisure Centre building. The concept design aims to provide a wide range of stimulating play experiences, catering for children of all ages and abilities. This includes careful consideration of specific play equipment that can be used by children with reduced mobility and the provision of multi-sensory play experiences including tactile surfacing, landscaping and interactive play panels.\nENVIRONMENTAL DESIGN & PERFORMANCE\nThe proposed Leisure Centre Building will be designed and delivered to achieve an environmental performance level of Operational Net Zero in line with Causeway Coast & Glens Borough Council’s commitment to achieving Net Zero Emissions for all new Council Buildings. This performance standard means that the amount of carbon emissions associated with the building’s operational energy requirements on an annual basis is zero or negative. The proposed environmental strategy for the building includes:\n•\tA ‘Fabric First’ approach to the design of all building elements to improve thermal performance\n•\tHigh efficiency heating, cooling, ventilation, lighting and hot water generation systems\n•\tControl of solar gain through carefully positioned glazing and shading systems\n•\tOn-site renewable energy technologies including photovoltaic solar panels and heat pumps\nSITE ACCESS DESIGN, PARKING & LANDSCAPING\nThe existing site entrance will be upgraded to provide a new right turn lane, creating safe and efficient access to the facilities for both motorists and pedestrians. A new car park with carefully positioned accessible parking, drop-off point and coach parking will also be provided to facilitate a wide variety of user groups across the development site. The current concept design provides 100 car and 4 coach parking spaces. Pockets of landscaping with native shrubs and trees will be planted",
    "communication": {
      "futureNoticeDate": "2024-04-17T00:00:00+01:00"
    },
    "classification": {
      "id": "45212110",
      "scheme": "CPV",
      "description": "Leisure centre construction work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-112008",
      "name": "Causeway Coast and Glens Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKN0C",
        "locality": "Coleraine",
        "postalCode": "BT52 1EY",
        "countryName": "United Kingdom",
        "streetAddress": "66 Port Stewart Road"
      },
      "details": {
        "url": "http://www.causewaycoastandglens.gov.uk",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Causeway Coast and Glens Borough Council"
      },
      "contactPoint": {
        "email": "procurement@causewaycoastandglens.gov.uk",
        "telephone": "+44 2870347034"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
25 Apr 2024 · 013461-2024 · planning
{
  "id": "013461-2024",
  "tag": [
    "planning"
  ],
  "date": "2024-04-25T14:46:17+01:00",
  "ocid": "ocds-h6vhtk-045527",
  "buyer": {
    "id": "GB-FTS-112008",
    "name": "Causeway Coast and Glens Borough Council"
  },
  "tender": {
    "id": "ocds-h6vhtk-045527",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "description": "PROJECT & CONSULTATION CONTEXT\nCauseway Coast & Glens Borough Council is undertaking a proposed development of new Leisure Facilities at Lands between 13-39 Quay Road, Ballycastle. The project is jointly funded through the UK Government’s ‘Levelling Up’ initiative and Causeway Coast & Glens Borough Council. \nPROPOSED FACILITIES\nThe proposed facilities consist of a 25m swimming pool (4 lane), gym, large studio, changing, reception/office, splash area and modest spa features, vending area, changing places facility, bouldering wall, outdoor pump track, off-road running/walking trail and accessible play park.\nLeisure Centre\nThe proposed Leisure Centre has been carefully positioned to be respectful of the existing urban grain of the Conservation Area, with all facilities located on a single ground floor level to maintain key views from Quay Road to the Tow Valley beyond. The pitched roof forms reference the existing typologies of the surrounding residential context, with one roof form rising to address Quay Road and Ballycastle town, and the other rising to address the surrounding rural context and natural landscape of the Tow Valley and Fair Head. The proposed material palette of buff brick is a contemporary interpretation of the colour and texture of the buff sandstone used within some of the key civic buildings of Ballycastle, including the Holy Trinity Church at ‘The Diamond’ in the heart of the town. \nOutdoor Pump Track\nThe proposed Outdoor Pump Track is located to the north of the site and designed to provide an exciting riding experience for all age groups and abilities. The track will be +100m in length and finished in hard-wearing asphalt to form a variety of straights, bends and raised berms, which can be used by both bicycles and scooters. A secure fenced boundary with gated access will be provided to the perimeter of both the pump track and play park to create safe leisure spaces for young children and mitigate against anti-social behaviour.\nAccessible Play Park\nThe Accessible Play Park has been located to the south of the site where the existing topography facilitates universal access and to improve connectivity with the proposed Leisure Centre building. The concept design aims to provide a wide range of stimulating play experiences, catering for children of all ages and abilities. This includes careful consideration of specific play equipment that can be used by children with reduced mobility and the provision of multi-sensory play experiences including tactile surfacing, landscaping and interactive play panels.\nENVIRONMENTAL DESIGN & PERFORMANCE\nThe proposed Leisure Centre Building will be designed and delivered to achieve an environmental performance level of Operational Net Zero in line with Causeway Coast & Glens Borough Council’s commitment to achieving Net Zero Emissions for all new Council Buildings. This performance standard means that the amount of carbon emissions associated with the building’s operational energy requirements on an annual basis is zero or negative. The proposed environmental strategy for the building includes:\n•\tA ‘Fabric First’ approach to the design of all building elements to improve thermal performance\n•\tHigh efficiency heating, cooling, ventilation, lighting and hot water generation systems\n•\tControl of solar gain through carefully positioned glazing and shading systems\n•\tOn-site renewable energy technologies including photovoltaic solar panels and heat pumps\nSITE ACCESS DESIGN, PARKING & LANDSCAPING\nThe existing site entrance will be upgraded to provide a new right turn lane, creating safe and efficient access to the facilities for both motorists and pedestrians. A new car park with carefully positioned accessible parking, drop-off point and coach parking will also be provided to facilitate a wide variety of user groups across the development site. The current concept design provides 100 car and 4 coach parking spaces. Pockets of landscaping with native shrubs and trees will be planted"
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKN0C"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45212110",
            "scheme": "CPV",
            "description": "Leisure centre construction work"
          }
        ]
      }
    ],
    "title": "Information Only",
    "value": {
      "amount": 12300000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "PROJECT & CONSULTATION CONTEXT\nCauseway Coast & Glens Borough Council is undertaking a proposed development of new Leisure Facilities at Lands between 13-39 Quay Road, Ballycastle. The project is jointly funded through the UK Government’s ‘Levelling Up’ initiative and Causeway Coast & Glens Borough Council. \nPROPOSED FACILITIES\nThe proposed facilities consist of a 25m swimming pool (4 lane), gym, large studio, changing, reception/office, splash area and modest spa features, vending area, changing places facility, bouldering wall, outdoor pump track, off-road running/walking trail and accessible play park.\nLeisure Centre\nThe proposed Leisure Centre has been carefully positioned to be respectful of the existing urban grain of the Conservation Area, with all facilities located on a single ground floor level to maintain key views from Quay Road to the Tow Valley beyond. The pitched roof forms reference the existing typologies of the surrounding residential context, with one roof form rising to address Quay Road and Ballycastle town, and the other rising to address the surrounding rural context and natural landscape of the Tow Valley and Fair Head. The proposed material palette of buff brick is a contemporary interpretation of the colour and texture of the buff sandstone used within some of the key civic buildings of Ballycastle, including the Holy Trinity Church at ‘The Diamond’ in the heart of the town. \nOutdoor Pump Track\nThe proposed Outdoor Pump Track is located to the north of the site and designed to provide an exciting riding experience for all age groups and abilities. The track will be +100m in length and finished in hard-wearing asphalt to form a variety of straights, bends and raised berms, which can be used by both bicycles and scooters. A secure fenced boundary with gated access will be provided to the perimeter of both the pump track and play park to create safe leisure spaces for young children and mitigate against anti-social behaviour.\nAccessible Play Park\nThe Accessible Play Park has been located to the south of the site where the existing topography facilitates universal access and to improve connectivity with the proposed Leisure Centre building. The concept design aims to provide a wide range of stimulating play experiences, catering for children of all ages and abilities. This includes careful consideration of specific play equipment that can be used by children with reduced mobility and the provision of multi-sensory play experiences including tactile surfacing, landscaping and interactive play panels.\nENVIRONMENTAL DESIGN & PERFORMANCE\nThe proposed Leisure Centre Building will be designed and delivered to achieve an environmental performance level of Operational Net Zero in line with Causeway Coast & Glens Borough Council’s commitment to achieving Net Zero Emissions for all new Council Buildings. This performance standard means that the amount of carbon emissions associated with the building’s operational energy requirements on an annual basis is zero or negative. The proposed environmental strategy for the building includes:\n•\tA ‘Fabric First’ approach to the design of all building elements to improve thermal performance\n•\tHigh efficiency heating, cooling, ventilation, lighting and hot water generation systems\n•\tControl of solar gain through carefully positioned glazing and shading systems\n•\tOn-site renewable energy technologies including photovoltaic solar panels and heat pumps\nSITE ACCESS DESIGN, PARKING & LANDSCAPING\nThe existing site entrance will be upgraded to provide a new right turn lane, creating safe and efficient access to the facilities for both motorists and pedestrians. A new car park with carefully positioned accessible parking, drop-off point and coach parking will also be provided to facilitate a wide variety of user groups across the development site. The current concept design provides 100 car and 4 coach parking spaces. Pockets of landscaping with native shrubs and trees will be planted",
    "communication": {
      "futureNoticeDate": "2024-04-17T00:00:00+01:00"
    },
    "classification": {
      "id": "45212110",
      "scheme": "CPV",
      "description": "Leisure centre construction work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-112008",
      "name": "Causeway Coast and Glens Borough Council",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKN0C",
        "locality": "Coleraine",
        "postalCode": "BT52 1EY",
        "countryName": "United Kingdom",
        "streetAddress": "66 Port Stewart Road"
      },
      "details": {
        "url": "http://www.causewaycoastandglens.gov.uk",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Causeway Coast and Glens Borough Council"
      },
      "contactPoint": {
        "email": "procurement@causewaycoastandglens.gov.uk",
        "telephone": "+44 2870347034"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}