Official UK procurement notice
Hire of Temporary Structures
Authority: Magnox Limited (Ltd)
What is being bought
Published requirement descriptionTemporary industrial steel structures are required to store recovered waste packages until a decontamination and disposal route is confirmed. The contract scope is for erect, hire and dismantle of three temporary structures on Harwell site.
CPV: Assembly and erection of prefabricated structures
The lotProcurement structure
single lot · no lot value publishedLot #1Magnox currently have three temporary structures in place to facilitate the storage of…
Magnox currently have three temporary structures in place to facilitate the storage of waste located at the Harwell site.
Due to unforeseen delays in managing the disposal of the waste, the structures are required for the following durations:
Hanger 10 Tent: 36 months
B525 Tent: 24 months
B351 Tent: 12 months
Magnox has analysed the risks associated with the removal of contaminated waste from one tent to another. This exposes Magnox not only financially, but also from a health and safety perspective.
Procedure terms & legal framework
From the official record- Procedure method
- Award procedure without prior publication of a call for competition
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 7 Oct 2021, 17:59 BST
- Last source update
- 7 Oct 2021, 17:59 BST
- FTS notice number
2021/S 000-025105- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02e97fFind a Tender
- Why no open competition
- The procurement falls outside the scope of application of the directive
- Published justification
Magnox Limited is intending to modify the current contract with Spaciotempo UK pursuant to Regulation 72(1)(b) of the Public Contracts Regulations 2015. Magnox considers that the modification to the current contract is necessary.
Firstly, a change of contractor cannot be made for interchangeability and interoperability reasons. There would be significant health and safety implications resulting from a change of contractor, including but not limited to from a licence condition perspective in respect of LC34 (Leakage and Escape of Radioactive Material and Radioactive Waste) and LC32 (Accumulation of Radioactive Waste).
Secondly, a change of contractor would cause significant inconvenience and an increase in cost, with a significant consequential cost of moving waste from H10, B351 and B525.
Finally, the increase in price does not exceed 50% of the value of the original contract with Spaciotempo UK.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Spaciotempo Ltd | £254,521 † | — | Awarded |
Contracts
Contract 025105-2021-1 · Spaciotempo Ltd
- Signed
- 25 Sept 2018
- Value
- £254,521
- Status
- active
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High Court of England and WalesReview body
Bidders & participating suppliers
1 commercial party on the notice- Spaciotempo UKAwarded supplier
Official documents & specifications