Highways Consultancy support Framework
Authority: BLACKPOOL COUNCIL (Local council)
What is being bought3 lots · detail below
Published requirement descriptionBlackpool Council is inviting tenders from potential providers with the relevant experience and technical ability to deliver a multi-disciplinary Consultancy Framework over various disciplines to support the following Council services (not an exhaustive list): Blackpool Council's Highways department, the Enterprise Zone (including Silicon Sands) and Growth and Prosperity department.
Blackpool Council is looking to appoint 3 ranked contractors on a framework (per lot) to supply
- Lot 1 Highways Design
- Lot 2 Strategic Support for Highways & Structures
- Lot 3 Highways Traffic Signal Support
- No preliminary market engagement: Blackpool Council has undertaken preliminary market engagement by publishing a Planned Procurement Notice (UK3). This notice was issued in advance of the formal tender process to alert the market to the forthcoming opportunity. The intention was to provide early visibility, enabling potential bidders to plan, allocate appropriate resources, and prepare for participation in the procurement process. This approach supports transparency, encourages competition, and helps ensure the market is adequately prepared ahead of the tender release.
CPV: Civil engineering consultancy services · Energy-efficiency consultancy services · Environmental engineering consultancy services · Health and safety consultancy services · Structural engineering consultancy services · Technical analysis or consultancy services
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Framework period
- 1 yr · up to 4 yrs from 12 Sept 2026
Published description of the framework
How the framework will operate
Following the establishment of the Framework, call-off contracts will be entered into based on requirement and demand. Call-off contracts will be based on the terms and conditions submitted with this tender, however a condensed "order form" will be completed and signed for each call-off which will contain a summary of specific project details. A copy of the draft order form will be included with the tender documentation.
Call-offs under this Framework will follow a ranked call-off process with the option for direct award or mini-competition, as outlined below:
Direct Award (Ranked Call-Off)
- The first-ranked supplier in the relevant Lot will be approached in the first instance for each new requirement.
- If the first-ranked supplier is unable to meet the requirement (due to capacity, capability, or availability), the opportunity will be offered to the second-ranked supplier, and so on down the ranking.
- This process will continue until a suitable supplier is identified who can fulfil the requirement.
As a priority, and for routine or low-risk requirements, a direct award will be undertaken using the framework's ranked system.
Mini-Competition
The Contracting Authority reserves the right to undertake a mini-competition exercise with all bidders under a specific lot where it deems it appropriate. For more complex or high-risk projects, where market testing and the receipt of detailed written proposals are considered beneficial, a mini-competition process will be undertaken to ensure value for money and robust evaluation. The mini competition will be conducted in accordance with the terms set out in the framework agreement and will include a clear specification, evaluation criteria, and timescales.
Mini competition proposals will be assessed based on the extent to which they meet the specifically defined requirements. The evaluation criteria will be clearly set out for each mini-competition and may be based on the following criteria:
Mini-competition award criteria Potential weightings
Quality (Written submission) - including, but not limited to:
- Technical merit
- Methodology / approach
- Value for money
- Relevant experience and specialised knowledge 60% to 90%
Price -Based on lowest price 40% to 10%
Please note the weightings outlined above are for a guide only. Weightings will be determined on a project-specific basis, proportionate to the complexity, risk and strategic importance of the requirement.
Supplier proposals will be scored against the set criteria (in line with the above thresholds), and scores will be added together to give an overall score for each proposal. The proposal(s) scoring highest that meet all of the requirements will be awarded the call-off contract.
Mini-competition proposals will be evaluated by an evaluation panel comprised of appropriate representatives on a consensus scoring basis.
Right to Direct Award
Where applicable and in extreme circumstances The Authority reserves the right to make a direct award to any supplier within the relevant Lot where:
- The supplier is the highest-ranked and can meet the requirement; or
- The requirement is of urgent nature, and following the direct award and mini-competition call-off options as described above is deemed unfeasible and would deliver no value to the Council; or
- The Supplier in question has unique expertise or knowledge / experience relevant to the specific project, which is verifiable.
The Authority reserves the right to conduct either process outlined above for any project.
Pricing will be based on a schedule of rates for each discipline. These rates provided will be a maximum 'ceiling rate' and will be fixed for 12 months. While these rates will be fixed for Direct Award activity, for mini-competition exercises, Suppliers are permitted and encouraged to put forward their most competitive offer (which must not exceed the tender rates) for project delivery in order to have the best chance of winning work
Lots and requirements (3)Procurement structure
3 lots · all with a published value · same conditions of participation on every lot · same evaluation weights on every lotEvery one of these 3 lots carries the same published figure, £1,200,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Highways DesignRenewalceiling above
Support for, but not limited to, the following:
- Design of Highway geometric, public realm and civils design
- Traffic Signal design, review, signal configuration
- Urban Traffic Management, Urban Traffic Management Control
- Options Appraisal Reports
- Masterplanning
- Transport Modelling
- Road Safety Audits
- Third party pricing support (Highways surveys Topographical, Grip Tester surveys and GPR surveys)
- Support of providing bills of quantities for highway schemes and relevant tender information
- Feasibility reporting and optioneering reports with budget costs
- Preparation for Pre-construction information as part of CMD requirements
- Emerging innovative technologies support
- Support for drainage designs
- Hostile Vehicle Mitigation support
Within this Lot, we may also require roles such as CAD Technician, Principal Engineer, Senior Engineer and Senior Technician to provide support, including but not limited to the following:
Preparing drawings
Support of management and delivery of resurfacing works ranging from preparing bills of quantities, NEC contracts
Tender and evaluation support to provide best value exercises including support of funding applications
Reviewing framework options for delivery
Preparing legal orders for the necessary legal requirements
Liaising with principle contractors on behalf of the authority
Assisting in Comms strategy and public engagement and site supervision records to challenge Principle Contractors
Assistance in managing and scrutinising the design process to ensure RSA audits and relevant highway standards are acceptable
Undertaking site assessments of existing junctions, providing feasibility, service drawings, and option reports for possible improvement works
Support of the Traffic Management department providing responses on existing issues and ensuring the road network is meets relevant highway design standards
Regular meetings with Highways to ensure all EBF enquiries are kept up to date.
Meeting with design consultants to manage the efficient delivery of design work and being able to assist with design and delivery works for section 278 sites
Assistance in managing and scrutinising the design process to ensure RSA audits and relevant highway standards are acceptable.
Attendance at meetings at public events may be required.
- Economic & financial standing
Please confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:
- Employer's (Compulsory) Liability Insurance = £5 million
- Public Liability Insurance = £ 10 million
- Professional Indemnity Insurance = £5 million
*It is a legal requirement that certain companies hold Employer's (Compulsory) Liability Insurance of £5 million as a minimum. See the Health and Safety Executive website for more information: www.hse.gov.uk/pubns/hse39.pdf ↗.
Please confirm that you have in place, or that you will have in place by the award of the contract, the human and technical resources to perform the contract to ensure compliance with the UK General Data Protection Regulation and to ensure the protection of the rights of data subjects.
Are you relying on another supplier to act as a guarantor?
If yes, please provide their name and evidence of their economic and financial standing.
Please confirm that you are able to meet all the Contracting Authority's policy and legislative requirements and will provide copies of any company policies; procedures or associated documentary evidence if requested to do so
- Technical & professional ability
Conform to the requirements set out in the specification.
Commitment to a flexible / ad-hoc work pattern over a 48-month period with no guarantee of work volume?
Lot #2Strategic Support for Highways & StructuresRenewalceiling above
Areas of support may include (but not limited to)
- Bridge Asset Management Strategy (BAMS) Update
- Review of the existing Bridge Management System
- Review of the existing Bridge Stock and its condition
- Review of General/Special/Principal Bridge Inspections
- Review of Assessments & Structural Reviews
- Review of maintenance and replacement programmes
- Review of Sites of Engineering Difficulty
- Review of BIM progression in terms of collaborative tools such as 3d models, SharePoint, EIR/BEP etc.
- Review of resource requirements for business as usual, including training and professional progression for existing staff
- Appointment of someone to act internally as Technical Approval Authority (TAA) for Developments and Structural Reviews etc.
- Provision of a Bridge Business Plan to detail what is done now and what needs to be developed to meet the needs of the Council both now and in the future
- Advise on potential service improvements
- Emerging innovative technologies support
- Support for pumping station design
- Economic & financial standing
Please confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:
- Employer's (Compulsory) Liability Insurance = £5 million
- Public Liability Insurance = £ 10 million
- Professional Indemnity Insurance = £5 million
*It is a legal requirement that certain companies hold Employer's (Compulsory) Liability Insurance of £5 million as a minimum. See the Health and Safety Executive website for more information: www.hse.gov.uk/pubns/hse39.pdf ↗.
Please confirm that you have in place, or that you will have in place by the award of the contract, the human and technical resources to perform the contract to ensure compliance with the UK General Data Protection Regulation and to ensure the protection of the rights of data subjects.
Are you relying on another supplier to act as a guarantor?
If yes, please provide their name and evidence of their economic and financial standing.
Please confirm that you are able to meet all the Contracting Authority's policy and legislative requirements and will provide copies of any company policies; procedures or associated documentary evidence if requested to do so
- Technical & professional ability
Conform to the requirements set out in the specification.
Commitment to a flexible / ad-hoc work pattern over a 48-month period with no guarantee of work volume?
Lot #3Highways Traffic Signal SupportRenewalceiling above
Areas of support may include (but not limited to)
- Design and support for ad-hoc highway public realm and civils, drainage
- ecology, urban traffic management, urban traffic control
- Masterplanning
- Transport modelling
- Transport planning
- Road safety audit services
- Engineering services and appropriate support connected with the preparations and management of tenders, contracts and contract management
- Day-to-day supervision of projects as directed by the Council
- Emerging innovative technologies support
- Economic & financial standing
Please confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:
- Employer's (Compulsory) Liability Insurance = £5 million
- Public Liability Insurance = £ 10 million
- Professional Indemnity Insurance = £5 million
*It is a legal requirement that certain companies hold Employer's (Compulsory) Liability Insurance of £5 million as a minimum. See the Health and Safety Executive website for more information: www.hse.gov.uk/pubns/hse39.pdf ↗.
Please confirm that you have in place, or that you will have in place by the award of the contract, the human and technical resources to perform the contract to ensure compliance with the UK General Data Protection Regulation and to ensure the protection of the rights of data subjects.
Are you relying on another supplier to act as a guarantor?
If yes, please provide their name and evidence of their economic and financial standing.
Please confirm that you are able to meet all the Contracting Authority's policy and legislative requirements and will provide copies of any company policies; procedures or associated documentary evidence if requested to do so
- Technical & professional ability
Conform to the requirements set out in the specification.
Commitment to a flexible / ad-hoc work pattern over a 48-month period with no guarantee of work volume?
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (3)
- Quality: 55%
- Cost: 35%
- Social Value: 10%
Published award criteria (3)
- Quality: Relevant experience and contract examples 20% sub-weighting Team Structure and Capacity 20% sub weighting Contract Management and Continuity 10% sub-weighting Scenario based question for each lot 50% sub-weighting
- Social Value: Based on the Themes, Outcomes and Measures Social Value Framework
- Cost
- Economic & financial standing
Please confirm whether you already have, or can commit to obtain, prior to the award of the contract, the levels of insurance cover indicated below:
- Employer's (Compulsory) Liability Insurance = £5 million
- Public Liability Insurance = £ 10 million
- Professional Indemnity Insurance = £5 million
*It is a legal requirement that certain companies hold Employer's (Compulsory) Liability Insurance of £5 million as a minimum. See the Health and Safety Executive website for more information: www.hse.gov.uk/pubns/hse39.pdf ↗.
Please confirm that you have in place, or that you will have in place by the award of the contract, the human and technical resources to perform the contract to ensure compliance with the UK General Data Protection Regulation and to ensure the protection of the rights of data subjects.
Are you relying on another supplier to act as a guarantor?
If yes, please provide their name and evidence of their economic and financial standing.
Please confirm that you are able to meet all the Contracting Authority's policy and legislative requirements and will provide copies of any company policies; procedures or associated documentary evidence if requested to do so
- Technical & professional ability
Conform to the requirements set out in the specification.
Commitment to a flexible / ad-hoc work pattern over a 48-month period with no guarantee of work volume?
- Price carries 35 of 100 points: a 10% discount moves about 3.5 points. The method statement decides this lot, not the discount.
- “Highways Consultancy support Framework” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Closed
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 14 May 2026, 07:49 BST
- Last source update
- 29 Jun 2026, 15:31 BST
- Award evaluation window
- Submission end – 10 Sept 2026
- Authority reference
DN818607- FTS notice number
2026/S 000-055229- Latest notice
- Tender notice (UK4)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-06984eFind a Tender
How it was run
Official notice- Appointment period ends
- 20 Jul 2026, 12:00 BST
- Clarification deadline
- 13 Jul 2026, 10:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
DN818607
Timeline
14 May 2026 → 12 Sept 2026 · 8 dates- Planning notice published166 days ago14 May 2026, 07:49 BST
- Next notice expected140 days ago8 Jun 2026, 23:59 BST
- Tender notice published137 days ago11 Jun 2026, 13:43 BST
- Latest notice published119 days ago29 Jun 2026, 15:31 BST
- Clarification questions by105 days ago13 Jul 2026, 10:00 BST
- Admission / appointment period ends98 days ago · period end, not a bid countdown20 Jul 2026, 12:00 BST
- Award decision expected by46 days ago10 Sept 2026, 23:59 BST
- Contract starts45 days ago12 Sept 2026, 00:00 BST
Notice history
8 events · 4 releases on Find a Tender · since 14 May 2026- Planned procurement notice published14 May 2026, 07:49 BSTUK3
- Tender notice published11 Jun 2026, 13:43 BSTUK4
- Published value published: £3,600,00011 Jun 2026, 13:43 BST
- Status changed to active11 Jun 2026, 13:43 BST
- Deadline moved to 13 Jul 2026, 12:00 BST11 Jun 2026, 13:43 BST+5 days · was 8 Jul 2026, 23:59 BST
- Tender notice published12 Jun 2026, 11:19 BSTUK4
- Tender notice published29 Jun 2026, 15:31 BSTUK4
- Deadline moved to 20 Jul 2026, 12:00 BST29 Jun 2026, 15:31 BST+7 days · was 13 Jul 2026, 12:00 BST
Published amendments (2)
Direct Link https://procontract.due-north.com/Advert/?advertId=939c9516-9265-f111-813c-005056b64545&fromProjectDashboard=True
The clarification and tender return deadlines have been extended
Routine re-releases (4)
- 2026-05: 1 release · 14 May 2026
Contracting authority & participating public bodies
Official documents & specifications (4)
Official links; attachments are not copiedNotices published for this procedure
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Planned procurement notice Planned procurement notice on Find a Tender