HE1851 B4069 Lyneham Banks Repair Wiltshire Council April 2024
Carriageway resurfacing works
Construction work for highways
Construction work for highways
+8 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Wiltshire Council: "HE1851 B4069 Lyneham Banks Repair Wiltshire Council April 2024". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Wiltshire Council | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Wiltshire Council
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Wiltshire Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
23.8Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 34 active published awards; 33 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityWiltshire Council | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published31 May 2024, 15:04 BST | Last source update31 May 2024, 15:04 BST | Recurring procurementNot published |
ClassificationCarriageway resurfacing works, Construction work for highways, Construction work for highways, roads, Foundation work for roads, Highway maintenance work, Road construction works, Road-repair works, Road-surface painting work, Secondary road construction work, Surface work for roads | ||
Delivery area | ||
OCIDocds-h6vhtk-041747 | ||
What is being bought
B4069 Lyneham Banks Repairs
In 2022 significant a significant landslip took place on the B4069 Lyneham in North Wiltshire. The resulting landslip dislodged around 90m of the existing carriageway downslope. The B4069 has been closed since February 2022 when the landslip took place, movements continued throughout the first part of 2022 until slowing significantly during the summer months.
The B4069 is a regionally important route providing connectivity between junction 17 of the M4 and North Wiltshire as well as serving several local communities. The road when opened normally takes around 5500 vehicles a day.
It is proposed to stabilise the slope with a contiguous piled embedded retaining wall with capping and upstand at the top. The proposed structure will be constructed on the northern side of the B4069 with a length of approximately 109m.
A in-situ reinforced concrete (RC) capping beam will be supported on a single row of 600 mm diameter bored concrete piles. The in-situ capping beam will be 1000 mm wide and 1500 mm deep structurally connected with the piles. The capping beam will be connected to tension micropiles to provide additional lateral ground support to the retaining wall.
A vertical infill parapet or edge restraint is also considered to be provided at this location. The new parapet may be installed in the verge or attached directly to the capping beam at the back of the verge. Highway works will include reinstatement of the carriageway, pavement, drainage, and kerbs. To provide improvement to the existing highway drainage system, it is proposed that the highway shall be drained by a combination of gullies, carrier/ collector pipes and catchpits. The proposed highway drainage will outfall to a watercourse north of the B4069 via a new culvert.
To ensure effective drainage of the site a number of land drainage measures will also be put in place on 3rd party land either side of the B4069.
The works will be designed and built in accordance with current standards and guidelines, and will include for all key aspects of highway construction – piling, earthworks, carriageway, drainage, signage, and hard and soft landscaping works.
What changed
From the official release history
- Status changed to complete
31 May 2024, 15:04 BST - Official notice release published
31 May 2024, 15:04 BST - Submission deadline changed to published date
31 May 2024, 15:04 BST - Status changed to active
5 Jan 2024, 11:01 GMT - Official notice release published
5 Jan 2024, 11:01 GMT - Submission deadline changed to 7 Mar 2024, 12:00 GMT
5 Jan 2024, 11:01 GMT - Status changed to planned
10 Nov 2023, 10:24 GMT - Official notice release published
10 Nov 2023, 10:24 GMT - Buyer information updated
10 Nov 2023, 10:24 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedB4069 Lyneham Banks Repairs In 2022 significant a significant landslip took place on the B4069 Lyneham in North Wiltshire. The resulting landslip dislodged around 90m of the existing carriageway downslope. The B4069 has been closed since February 2022 when the landslip took place, movements continued throughout the first part of 2022 until slowing significantly during the summer months. The B4069 is a regionally important route providing connectivity between junction 17 of the M4 and North Wiltshire as well as serving several local communities. The road when opened normally takes around 5500 vehicles a day. It is proposed to stabilise the slope with a contiguous piled embedded retaining wall with capping and upstand at the top. The proposed structure will be constructed on the northern side of the B4069 with a length of approximately 109m. A in-situ reinforced concrete (RC) capping beam will be supported on a single row of 600 mm diameter bored concrete piles. The in-situ capping beam will be 1000 mm wide and 1500 mm deep structurally connected with the piles. The capping beam will be connected to tension micropiles to provide additional lateral ground support to the retaining wall. A vertical infill parapet or edge restraint is also considered to be provided at this location. The new parapet may be installed in the verge or attached directly to the capping beam at the back of the verge. Highway works will include reinstatement of the carriageway, pavement, drainage, and kerbs. To provide improvement to the existing highway drainage system, it is proposed that the highway shall be drained by a combination of gullies, carrier/ collector pipes and catchpits. The proposed highway drainage will outfall to a watercourse north of the B4069 via a new culvert. To ensure effective drainage of the site a number of land drainage measures will also be put in place on 3rd party land either side of the B4069. The works will be designed and built in accordance with current standards and guidelines, and will include for all key aspects of highway construction – piling, earthworks, carriageway, drainage, signage, and hard and soft landscaping works.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
31 May 2024, 15:04 BST - Award active
Not published · Not published - Contract active
Signed 8 May 2024, 00:00 BST · £2,742,725
Commercial outcome and competition
Awards Octavius Infrastructure Limited Not published · Not published · active |
Contracts Contract £2,742,725 · signed 8 May 2024, 00:00 BST · active |
Bid statistics bids: 9 (lot 1) electronicBids: 9 (lot 1) foreignBidsFromEU: 0 (lot 1) foreignBidsFromNonEU: 0 (lot 1) smeBids: 7 (lot 1) |
Buyer and organisations in this procedure
Wiltshire Council
Contracting authority GB-FTS-2791Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published