HE0914 A350 Chippenham Duelling Scheme April 2023

Construction work for highways
Construction work for highways
roads
+15 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Wiltshire Council: "HE0914 A350 Chippenham Duelling Scheme April 2023". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityWiltshire CouncilScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Wiltshire Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Wiltshire Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
23.8Bids / Report
6.1% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 34 active published awards; 33 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityWiltshire Council
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published30 Apr 2025, 15:29 BST
Last source update30 Apr 2025, 15:29 BST
Recurring procurementNot published
ClassificationConstruction work for highways, Construction work for highways, roads, Dual carriageway construction work, Erection of road-barriers, Foundation work for highways, Foundation work for highways, roads, streets and footpaths, Installation of road signs, Installation of street furniture, Main road construction works, Ring road construction work, Road construction works, Road-surface painting work, Roundabout construction work, Surface work for highways, Trunk road construction work
Delivery area
OCIDocds-h6vhtk-037589
What is being bought
he A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster. It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass. Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids. Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham. In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022. Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025. The scheme is likely to include for the following key elements Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway. Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass. Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works. The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works. The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated. The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.
What changed
From the official release history
  1. Status changed to complete
    30 Apr 2025, 15:29 BST
  2. Official notice release published
    30 Apr 2025, 15:29 BST
  3. Status changed to published status
    24 May 2023, 11:58 BST
  4. Official notice release published
    24 May 2023, 11:58 BST
  5. Submission deadline changed to published date
    24 May 2023, 11:58 BST
  6. Status changed to active
    27 Apr 2023, 22:51 BST
  7. Official notice release published
    27 Apr 2023, 22:51 BST
  8. Submission deadline changed to 30 May 2023, 12:00 BST
    27 Apr 2023, 22:51 BST
  9. Official notice release published
    16 Mar 2023, 15:31 GMT
  10. Status changed to planned
    13 Oct 2022, 16:06 BST
  11. Official notice release published
    13 Oct 2022, 16:06 BST
  12. Buyer information updated
    13 Oct 2022, 16:06 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    cancelled
    Published valueNot published
    he A350 is one of the most important routes in Wiltshire. It is a primary north-south route with regional significance connecting the south coast with the M4 and onwards to Bristol and the Midlands. In Wiltshire it passes around the principal settlements of Chippenham and Trowbridge via the town of Melksham and on to Westbury and Warminster. It has been a longstanding priority to improve north-south connectivity along the A350, and Wiltshire Council has been progressively bringing forward the dualling of the A350 Chippenham bypass. Over recent years three major capital schemes (Phases 1, 2 and 3) have been brought forward to improve capacity and safety on the route, largely funded through successful Department for Transport (DfT) and/or Local Enterprise Partnerships (LEP) funding bids. Most recently, an Outline Business Case (OBC) bid was made to DfT for funding to bring forward a scheme to complete the dualling of the A350 bypass at Chippenham. In the spending review in October 2021 the government announced that it would allocate funds for a scheme to dual the remaining single carriageway sections of the A350 route round Chippenham. The project was also included within the list of forthcoming infrastructure projects as part of The Growth Plan 2022 published in September 2022. Wiltshire Council and its consultants Atkins are now pressing forward to complete the design of the remaining Phases 4 and 5 of the scheme, and preparing the Full Business Case (FBC). Subject to the FBC being approved by the DfT, it is anticipated that construction works will be undertaken during 2024 and 2025. The scheme is likely to include for the following key elements Phase 4 dualling: widening the A350 over a total distance of some 1.5km to dual 2-lane between Chequers roundabout and Lackham roundabout. The dualling would take place within the existing wide highway verge to the west of the current carriageway. Phase 5 dualling: widening the A350 over a total distance of some 1.75km to dual 2-lane between Cepen Park South roundabout and Bumpers Farm roundabout. Again, the dualling would take place within the existing wide highway verge to the west of the current carriageway. When implemented with Phase 4, this would extend the dualling to cover the full stretch of the A350 Chippenham Bypass. Bumpers Farm Roundabout capacity enhancements: increasing the circulatory from 2 lanes to 3; signalising 4 approach arms; increasing approach arms from A350 (S), A420 (W), A350 (N) and A420 (E) to 3 lanes; and dualling the exits onto the A420 (E) and A420 (W) and Lackham roundabout capacity enhancements: dualling the exit to the A350 north as part of the phase 4 works. The works will be designed and built-in accordance with current standards and guidelines and will include for all key aspects of highway construction – earthworks, carriageway, footways, drainage, street lighting, signage, statutory authority (gas, water electric etc) service diversions and provision, and hard and soft landscaping works. The works will be contained within the existing highway boundary extents and there should be no requirement for additional land. The existing bridges along this route were constructed to accommodate the additional carriageways without needing further major works, and as such there are no major structural works anticipated. The A350 route will need to remain in operation throughout the works, and as such careful traffic management considerations and phasing, particularly in connection with the Bumpers Farm Roundabout enhancements, will be required. There will be a desire to minimise impacts on traffic flows during the works and ensure that the scheme is undertaken with suitable and appropriate levels of public engagement and liaison.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    30 Apr 2025, 15:29 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 29 Apr 2025, 00:00 BST · £21,191,000,000
Commercial outcome and competition
Awards
MJ Church (Plant) Ltd
Not published · Not published · active
Contracts
HE0914 A350 Chippenham Duelling Scheme April 2023
£21,191,000,000 · signed 29 Apr 2025, 00:00 BST · active
Bid statistics
bids: 13 (lot 1)
electronicBids: 13 (lot 1)
foreignBidsFromEU: 13 (lot 1)
foreignBidsFromNonEU: 0 (lot 1)
smeBids: 5 (lot 1)
Buyer and organisations in this procedure

Wiltshire Council

Contracting authority GB-FTS-2791
View buyer profile
  • Wiltshire Council
    buyer

    Wiltshire Council, County Hall, Bythesea Road, Trowbridge, UKK15, BA14 8JN
    +44 1255713371
  • High Court of England and Wales
    reviewBody

    The Royal Court of Justice, Strand, London, WC2A 2LL
  • MJ Church (Plant) Ltd
    supplier

    Saltersford Lane, Chippenham, UKK15, SN14 0RN