Half-life overhaul and upgrade of electronic control system of rail vehicle transfer wagon serial no 8552.

Official notice

Authority: Translink (Central government)

GoodsNegotiated without publication of a contract notice
Budget not disclosedValue not published
Awarded 25 Nov 2021
Awarded to SCHEUERLE Fahrzeugfabrik GmbH

What is being bought

Published requirement description

The contract awarded to Scheuerle will be for the overhaul and upgrade of rail vehicle transfer wagon serial no. 8552, which was manufactured and supplied by Scheuerle to Translink in March 2000.

CPV: Railway maintenance or service vehicles, and railway freight wagons

The lotProcurement structure

single lot · no lot value published
Lot #1
Delivery: Northern Ireland · York Rd Rail Depot Belfast

Procedure terms & legal framework

From the official record
Procedure method
Negotiated without publication of a contract notice
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
25 Nov 2021, 14:04 GMT
Last source update
25 Nov 2021, 14:04 GMT
FTS notice number
2021/S 000-029351
Classification (CPV)
Railway maintenance or service vehicles, and railway freight wagons
Delivery area
Northern Ireland (UKN06)
Official registry OCID
ocds-h6vhtk-02fa16 Find a Tender
Why no open competition

The works, supplies or services can be provided only by a particular economic operator due to absence of competition for technical reasons

Published justification

Scheuerle Fahrzeugfabrik GmbH (Scheuerle) build bespoke machines for the movement of large and unusual loads. In 1999 Translink/NI Railways procured a machine from Scheuerle for the movement of vehicles into and out of their Workshops located at York Road, Belfast – this machine was delivered in March 2000 and has been in consistent use since.The machine now requires a half-life overhaul as it has been in service for over twenty years, and a recent inspection report by Scheuerle indicated that a number of components are life expired and require replacement to ensure the ongoing availability of the machine. The Scheuerle inspection also indicated that the electronic system used to control the rail transfer wagon is now obsolete. The electronic control system is bespoke to Scheuerle, and they have replaced this system on all of the other rail vehicle transfer wagons throughout the world. The rail vehicle transfer wagon is critical piece of equipment for NI Railways as it enables the movement of rail carriages, and carriage bogies into/out of their workshop to facilitate passenger carrying rolling stock heavy overhaul programs and ongoing safety critical component overhauls.

Without the ability to continue to undertake this work the fleet of NI Railways passenger vehicles would have to be withdrawn from service to maintain passenger safety. Due to the fact that the rail vehicle transfer wagon was designed and built by Scheuerle, and the electronic control system is a bespoke design, to ensure the ongoing safe operation of the machine, and therefore ensuring the safety of NI Railways staff and passengers using NI Railways trains, the overhaul and upgrade of this machine must be completed by Scheuerle. Translink believe that due to the technical specialism of the rail vehicle transport, and the bespoke design of it by Scheuerle, that the award of the overhaul to Scheuerle is compliant with Utilities Contract Regulations 2017 Regulation 50(1)(c)ii. Using Translink’s specialist knowledge of the rail transport business in UK and Ireland, and the fact that the control system of the Rail Transfer Wagon is bespoke to Scheuerle, NI Railways does not know of any other company who could undertake the overhaul and electronic control system replacement while still guaranteeing the safe operation of the machine post overhaul.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Contracts signed 1latest 25 Nov 2021
Awarded toValueDateStatus
SCHEUERLE Fahrzeugfabrik GmbHSME——Awarded

Contracts

  • Half-life overhaul and upgrade of electronic control system of rail vehicle transfer wagon serial no 8552. · SCHEUERLE Fahrzeugfabrik GmbHSME

    Signed
    25 Nov 2021
    Value
    —
    Status
    active

Contracting authority & participating public bodies

Translink

Contracting authorityCentral GovernmentUrban railway, tramway, trolleybus or bus services Translink Procurement Department - 2nd Floor, Belfast, UK, BT2 7LXContact name, email, phone

Dispute resolution & review bodies

  • High Court of Justice in Northern IrelandReview body Belfast

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.