← Back to search results

AwardedFind a Tender · award

Grenfell Tower Principal Contractor

Buyer: Ministry of Housing, Communities & Local Government →

BuyerMinistry of Housing, Communities & Local Government
StatusAwarded
DeadlineNot published
ValueValue not published
Published25 Apr 2025

What is being bought

The Ministry of Housing, Communities & Local Government ("MHCLG") is publishing this voluntary transparency notice to alert economic operators of its intention to vary a maintenance and safety contract with Deconstruct (UK) Limited ("DCUK", the "Principal Contractor"). The variation will be entered into following a period of 30 days from the date of publication of this notice. MHCLG considers that the relevant modifications (as described below) are justified on the basis that they are in compliance with the Public Contracts Regulations 2015 (PCR) pursuant to Regulation 72(1)(b).

Delivery location

UK

Categories

Demolition work 45111100

Lot details

Lot 1

MHCLG requires the modification to be made to the contract in order to broaden the scope of the maintenance and security contract (Services). The contract with DCUK includes provision of repair and maintenance services, security services and facilities management services as well as the ability to carry out emergency deconstruction. The variation will provide for planned deconstruction services (Works) of Grenfell Tower to ground level. This is justified under regulation 72(1)(b) of the Public Contracts Regulations 2015 (PCR 2015), on the basis of there being technical reasons why a change of contractor cannot be made and due to the fact that any change in contractor would cause significant inconvenience and substantial duplication of costs. The value of the modification is less than 50% of the value of the original contract.

What is included

ItemCategoryQuantity
1Not publishedNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Demolition work (45111100); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1344 median · 30.2 average (5,652 of 17,134 with a bid count)3.8 average (6,251 of 17,134 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UK2,3906 median · 82.9 average (838 of 2,390 with a bid count)7.4 average (932 of 2,390 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleAs explained in section II.2.4 above: In respect of the modification required, the Department is of the view that such changes satisfy the requirements of Regulation 72(1)(b) of the PCR 2015 for the reasons set out within section II.2.4. and therefore, the contract may be modified without a new award procedure. MHCLG requires the modification to be made to the contract so as to broaden the scope to include planned deconstruction of Grenfell Tower to ground level, rather than just emergency deconstruction. This is justified relying on regulation 72(1)(b) of the Public Contracts Regulations 2015 (PCR 2015). The published engineering advice is that the building should be deconstructed at the earliest opportunity as the best means to mitigate risks related to its condition. The building can currently be safely deconstructed. The longer the building is left in place, the risk of the structure's condition deteriorating to an unacceptable level, and the risks to the site operatives, who must go inside the building, increase. We are seeking to avoid needing to carry out emergency or unplanned deconstruction if safety risks increase. Planned deconstruction will minimise disruption to the community as it will minimise the use of noisy and percussive approaches and ensure dust control is in place from the outset. It would not be possible to do this to the same extent in the case of an emergency deconstruction. The Principal Contractor has unique site knowledge given they have: - - been working on the Grenfell site since 2017. - undertaken all three stages of propping - undertaken site clearance - led on the weekly monitoring of the props in the building since installation and undertaken any necessary remedial works The depth and longevity of the Principal Contractor's knowledge and understanding of the Tower, the site and neighbourhood, is a significant preventative measure regarding technical and health and safety risk. This is particularly pertinent to ensuring operative safety and to design the optimal methodology to minimise disruption during deconstruction works. This kind of knowledge cannot be gleaned quickly, and the relationships have now been formed over years
Rationale classificationsThe procurement falls outside the scope of application of the directive
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Contracts

016942-2025-1

Statusactive
Value£12,250,000

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-050766
Latest release ID016942-2025
Latest release timestampFri Apr 25 2025 09:23:09 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodlimited
Procurement method detailsAward procedure without prior publication of a call for competition
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
25 Apr 2025award, contract016942-2025

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "016942-2025",
  "tag": [
    "award",
    "contract"
  ],
  "date": "2025-04-25T10:23:09+01:00",
  "ocid": "ocds-h6vhtk-050766",
  "buyer": {
    "id": "GB-FTS-145111",
    "name": "Ministry of Housing, Communities & Local Government"
  },
  "awards": [
    {
      "id": "016942-2025-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-04095156",
          "name": "Deconstruct (UK) Limited"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "CPD04126102",
    "lots": [
      {
        "id": "1",
        "hasOptions": false,
        "description": "MHCLG requires the modification to be made to the contract in order to broaden the scope of the maintenance and security contract (Services).  The contract with DCUK includes provision of repair and maintenance services, security services and facilities management services as well as the ability to carry out emergency deconstruction. The variation will provide for planned deconstruction services (Works) of Grenfell Tower to ground level.  \nThis is justified under regulation 72(1)(b) of the Public Contracts Regulations 2015 (PCR 2015), on the basis of there being technical reasons why a change of contractor cannot be made and due to the fact that any change in contractor would cause significant inconvenience and substantial duplication of costs. The value of the modification is less than 50% of the value of the original contract."
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ]
      }
    ],
    "title": "Grenfell Tower Principal Contractor",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The Ministry of Housing, Communities & Local Government (\"MHCLG\") is publishing this voluntary transparency notice to alert economic operators of its intention to vary a maintenance and safety contract with Deconstruct (UK) Limited (\"DCUK\", the \"Principal Contractor\"). The variation will be entered into following a period of 30 days from the date of publication of this notice. MHCLG considers that the relevant modifications (as described below) are justified on the basis that they are in compliance with the Public Contracts Regulations 2015 (PCR) pursuant to Regulation 72(1)(b).",
    "reviewDetails": "Any review proceedings should be promptly brought to the attention of MHCLG Commercial and will be dealt with in accordance with the requirements of Public Contact Regulations 2015.",
    "classification": {
      "id": "45111100",
      "scheme": "CPV",
      "description": "Demolition work"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "As explained in section II.2.4 above: \nIn respect of the modification required, the Department is of the view that such changes satisfy the requirements of Regulation 72(1)(b) of the PCR 2015 for the reasons set out within section II.2.4. and therefore, the contract may be modified without a new award procedure. \nMHCLG requires the modification to be made to the contract so as to broaden the scope to include planned deconstruction of Grenfell Tower to ground level, rather than just emergency deconstruction. This is justified relying on regulation 72(1)(b) of the Public Contracts Regulations 2015 (PCR 2015). \nThe published engineering advice is that the building should be deconstructed at the earliest opportunity as the best means to mitigate risks related to its condition. The building can currently be safely deconstructed. The longer the building is left in place, the risk of the structure's condition deteriorating to an unacceptable level, and the risks to the site operatives, who must go inside the building, increase.  We are seeking to avoid needing to carry out emergency or unplanned deconstruction if safety risks increase.   \nPlanned deconstruction will minimise disruption to the community as it will minimise the use of noisy and percussive approaches and ensure dust control is in place from the outset.  It would not be possible to do this to the same extent in the case of an emergency deconstruction. \nThe Principal Contractor has unique site knowledge given they have: - \n- been working on the Grenfell site since 2017.  \n- undertaken all three stages of propping \n- undertaken site clearance  \n- led on the weekly monitoring of the props in the building since installation and undertaken any necessary remedial works  \nThe depth and longevity of the Principal Contractor's knowledge and understanding of the Tower, the site and neighbourhood, is a significant preventative measure regarding technical and health and safety risk. This is particularly pertinent to ensuring operative safety and to design the optimal methodology to minimise disruption during deconstruction works.  This kind of knowledge cannot be gleaned quickly, and the relationships have now been formed over years",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-145111",
      "name": "Ministry of Housing, Communities & Local Government",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "London  United Kingdom",
        "postalCode": "SW1P 4DF",
        "countryName": "United Kingdom",
        "streetAddress": "2 Marsham Street"
      },
      "details": {
        "url": "https://www.gov.uk/government/organisations/ministry-of-housing-communities-local-government",
        "classifications": [
          {
            "id": "MINISTRY",
            "scheme": "TED_CA_TYPE",
            "description": "Ministry or any other national or federal authority, including their regional or local subdivisions"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Ministry of Housing, Communities & Local Government",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "email": "commercialtenders@communities.gov.uk"
      }
    },
    {
      "id": "GB-COH-04095156",
      "name": "Deconstruct (UK) Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "04095156",
        "scheme": "GB-COH",
        "legalName": "Deconstruct (UK) Limited"
      }
    },
    {
      "id": "GB-FTS-145112",
      "name": "Ministry of Housing, Communities & Local Government",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "postalCode": "SW1P 4DF",
        "countryName": "United Kingdom",
        "streetAddress": "2 Marsham Street"
      },
      "identifier": {
        "legalName": "Ministry of Housing, Communities & Local Government"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "016942-2025-1",
      "value": {
        "amount": 12250000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "016942-2025-1",
      "dateSigned": "2025-04-25T00:00:00+01:00"
    }
  ],
  "description": "IV.2.1 Previous publication concerning this procedure \nPublished on Find a Tender: 2023/S 000-034859",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
25 Apr 2025 · 016942-2025 · award, contract
{
  "id": "016942-2025",
  "tag": [
    "award",
    "contract"
  ],
  "date": "2025-04-25T10:23:09+01:00",
  "ocid": "ocds-h6vhtk-050766",
  "buyer": {
    "id": "GB-FTS-145111",
    "name": "Ministry of Housing, Communities & Local Government"
  },
  "awards": [
    {
      "id": "016942-2025-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-04095156",
          "name": "Deconstruct (UK) Limited"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "CPD04126102",
    "lots": [
      {
        "id": "1",
        "hasOptions": false,
        "description": "MHCLG requires the modification to be made to the contract in order to broaden the scope of the maintenance and security contract (Services).  The contract with DCUK includes provision of repair and maintenance services, security services and facilities management services as well as the ability to carry out emergency deconstruction. The variation will provide for planned deconstruction services (Works) of Grenfell Tower to ground level.  \nThis is justified under regulation 72(1)(b) of the Public Contracts Regulations 2015 (PCR 2015), on the basis of there being technical reasons why a change of contractor cannot be made and due to the fact that any change in contractor would cause significant inconvenience and substantial duplication of costs. The value of the modification is less than 50% of the value of the original contract."
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ]
      }
    ],
    "title": "Grenfell Tower Principal Contractor",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The Ministry of Housing, Communities & Local Government (\"MHCLG\") is publishing this voluntary transparency notice to alert economic operators of its intention to vary a maintenance and safety contract with Deconstruct (UK) Limited (\"DCUK\", the \"Principal Contractor\"). The variation will be entered into following a period of 30 days from the date of publication of this notice. MHCLG considers that the relevant modifications (as described below) are justified on the basis that they are in compliance with the Public Contracts Regulations 2015 (PCR) pursuant to Regulation 72(1)(b).",
    "reviewDetails": "Any review proceedings should be promptly brought to the attention of MHCLG Commercial and will be dealt with in accordance with the requirements of Public Contact Regulations 2015.",
    "classification": {
      "id": "45111100",
      "scheme": "CPV",
      "description": "Demolition work"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "As explained in section II.2.4 above: \nIn respect of the modification required, the Department is of the view that such changes satisfy the requirements of Regulation 72(1)(b) of the PCR 2015 for the reasons set out within section II.2.4. and therefore, the contract may be modified without a new award procedure. \nMHCLG requires the modification to be made to the contract so as to broaden the scope to include planned deconstruction of Grenfell Tower to ground level, rather than just emergency deconstruction. This is justified relying on regulation 72(1)(b) of the Public Contracts Regulations 2015 (PCR 2015). \nThe published engineering advice is that the building should be deconstructed at the earliest opportunity as the best means to mitigate risks related to its condition. The building can currently be safely deconstructed. The longer the building is left in place, the risk of the structure's condition deteriorating to an unacceptable level, and the risks to the site operatives, who must go inside the building, increase.  We are seeking to avoid needing to carry out emergency or unplanned deconstruction if safety risks increase.   \nPlanned deconstruction will minimise disruption to the community as it will minimise the use of noisy and percussive approaches and ensure dust control is in place from the outset.  It would not be possible to do this to the same extent in the case of an emergency deconstruction. \nThe Principal Contractor has unique site knowledge given they have: - \n- been working on the Grenfell site since 2017.  \n- undertaken all three stages of propping \n- undertaken site clearance  \n- led on the weekly monitoring of the props in the building since installation and undertaken any necessary remedial works  \nThe depth and longevity of the Principal Contractor's knowledge and understanding of the Tower, the site and neighbourhood, is a significant preventative measure regarding technical and health and safety risk. This is particularly pertinent to ensuring operative safety and to design the optimal methodology to minimise disruption during deconstruction works.  This kind of knowledge cannot be gleaned quickly, and the relationships have now been formed over years",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-145111",
      "name": "Ministry of Housing, Communities & Local Government",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "London  United Kingdom",
        "postalCode": "SW1P 4DF",
        "countryName": "United Kingdom",
        "streetAddress": "2 Marsham Street"
      },
      "details": {
        "url": "https://www.gov.uk/government/organisations/ministry-of-housing-communities-local-government",
        "classifications": [
          {
            "id": "MINISTRY",
            "scheme": "TED_CA_TYPE",
            "description": "Ministry or any other national or federal authority, including their regional or local subdivisions"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "Ministry of Housing, Communities & Local Government",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "email": "commercialtenders@communities.gov.uk"
      }
    },
    {
      "id": "GB-COH-04095156",
      "name": "Deconstruct (UK) Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "id": "04095156",
        "scheme": "GB-COH",
        "legalName": "Deconstruct (UK) Limited"
      }
    },
    {
      "id": "GB-FTS-145112",
      "name": "Ministry of Housing, Communities & Local Government",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "postalCode": "SW1P 4DF",
        "countryName": "United Kingdom",
        "streetAddress": "2 Marsham Street"
      },
      "identifier": {
        "legalName": "Ministry of Housing, Communities & Local Government"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "016942-2025-1",
      "value": {
        "amount": 12250000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "016942-2025-1",
      "dateSigned": "2025-04-25T00:00:00+01:00"
    }
  ],
  "description": "IV.2.1 Previous publication concerning this procedure \nPublished on Find a Tender: 2023/S 000-034859",
  "initiationType": "tender"
}