Framework for the Supply of Bulk Gases and Associated Equipment
Authority: CENTRE FOR PROCESS INNOVATION LIMITED (Public body)
Sectors: Chemical products (24) Delivery: Delivery location not published
Framework ceiling (notional) Value not publishedframework ceiling, not attributable revenue
Award in standstill Not publishedno call for competition
Award (standstill) to Air Products PLC
What is being bought
Published requirement descriptionCPI has an immediate requirement for the ongoing supply of Bulk Gases at its sites located in Sedgefield Co Durham. CPI Site at Wilton has a Cryosystem 4000 for the cryogenic storage of samples and a 230L Liquid Nitrogen tank to fill with liquid N2 to dispense into the Cryosystem.
This Tender is to establish a Single Supplier Framework for the Ongoing Supply of Bulk Gases, Tank Rentals Maintenance and Associated Equipment, however future purchases for these requirements may be taken up by any of CPI’s existing and future sites throughout the duration of the Framework.
The lotProcurement structure
single lot · no lot value publishedLot #1Lot 1Awarded
24110000 Industrial gases
Procedure terms & legal framework
From the official record- Procedure method
- Direct award
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Competition type
- Direct award — no call for competition
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 9 Sept 2026, 11:11 BST
- Last source update
- 9 Sept 2026, 11:11 BST
- Latest notice
- Transparency notice (UK5)
- Delivery area
- Not published
- Official registry OCID
ocds-h6vhtk-06f56b
- Why no open competition
- Single Suppliers Technical Reasons
- Published justification
The proposed direct award is justified on the basis that competition is absent for technical reasons, in accordance with Section 41 and Schedule 5 of the Procurement Act 2023. Competition is absent due to the existing bulk gas infrastructure installed and owned by the incumbent supplier. The current storage tanks, pipework, telemetry systems, and associated control equipment are specifically designed to operate with more…
the incumbent’s supply arrangements. The costs associated with replacing this infrastructure would be significant and would outweigh any potential savings that could be achieved through a competitive tender process. Changing supplier would introduce operational disruption and potential risks to continuity of supply during the transition period.
Commercial outcome & contract awards
Published awards, contracts and bid statistics — not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Air Products PLC15 Jun 2027 — 14 Jun 2030 · up to 13 Jun 2031Extensions: 36 months initial duration with 1 additional 12 months period extension options at the discretion of the Authority. | £2,000,000 | — | Standstill |
Notice history
2 events · 1 release on Find a Tender · since 9 Sept 2026- Contract signature expected19 Oct 2026, 23:59 BSTscheduled
- Transparency notice published9 Sept 2026, 11:11 BSTUK5
Contracting authority & participating public bodies
Framework contractors & participating bidders
1 commercial party on the notice- Air Products PLCFramework contractorView supplier profile →
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Conflict of interest declarationNot published
Notices published for this procedure
- Transparency notice Transparency notice on Find a Tender