Find a TenderClosed
Published 1 May 2024, 11:10 BST

Official UK procurement notice

Framework Agreement for the provision of Filters and Hoses for GWR and SWR.

Official notice

Authority: FIRST RAIL HOLDINGS LIMITED (Public body)

Framework agreement2 lotsGoodsNegotiated procedure with prior call for competitionMax 2 lots per supplier
Framework ceiling (notional)£2,500,000total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 29 Jun 2024
Lots 2max 2 won per supplier

What is being bought2 lots · detail below

Published requirement description

This procurement will be for the award of a Framework agreement to cover the majority of requirements for hoses and filters currently fitted to rolling stock operated by both GWR and SWR.

CPV: Automotive elements · Miscellaneous transport equipment and spare parts · Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment · Railway and tramway locomotives and rolling stock and associated parts · Rolling stock

Lots and requirements (2)Procurement structure

2 lots · all with a published value · win at most 2 of them

Every one of these 2 lots carries the same published figure, £1,250,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Hosesceiling above

This lot will cover the majority of hoses that are fitted on rolling stock operated by GWR and SWR.

This will exclude provision of materials that are covered under pre-existing agreements on specific fleets with either operator.

Delivery: UK
Lot #2Filtersceiling above

This lot is to cover the majority of filters required on rolling stock operated by GWR and SWR.

This will exclude provision of materials that are covered under pre-existing agreements on specific fleets with either operator.

Delivery: UK

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Lot distribution rule: Contracts may be awarded to multiple suppliers on either one or both lots.
What this means for your bid
  • “Framework Agreement for the provision of Filters and Hoses for GWR and…” is a framework: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Goods
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
1 May 2024, 11:10 BST
Last source update
5 Jun 2024, 16:56 BST
FTS notice number
2024/S 000-017501
Classification (CPV)
Automotive elementsMiscellaneous transport equipment and spare partsParts of railway or tramway locomotives or rolling stock; railways traffic-control equipmentRailway and tramway locomotives and rolling stock and associated partsRolling stock
Delivery area
UK
Official registry OCID
ocds-h6vhtk-04566b Find a Tender

How it was run

Official notice
Run through: portal not identified
Language: EN
Appointment period ends
29 Jun 2024, 17:00 BST
Submission channel
{"electronicSubmission"}
Accepted languages
en
Supplier levy on call-offs (max %)
document
Detailed submission instructions & authority contactsFrom official release

Timeline

5 Jun 2024 → 29 Jun 2024 · 2 dates
  1. Notice published
    5 Jun 2024, 16:56 BST
  2. Admission / appointment period endsperiod end, not a bid countdown
    29 Jun 2024, 17:00 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Deadline moved to 29 Jun 2024, 17:00 BST
    5 Jun 2024, 16:56 BST
    +26 days · was 3 Jun 2024, 17:00 BST
Published amendments (1 · 1 deadline change)
WhenWhatBeforeAfterShift
—DeadlineIV.2.23 Jun 202429 Jun 2024+26 d

Closing date for expressions of interest is now 29th June 2024 at 17.00

Contracting authority & participating public bodies

FIRST RAIL HOLDINGS LIMITED

Contracting authorityPublic bodyRailway services GB-COH: 05154485 8th Floor,The Point, 37 North Wharf Road, LONDON, UK, W21AFContact name, email Published organisation website ↗

Dispute resolution & review bodies

  • High CourtReview body London

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.