Official UK procurement notice
Flexible & Temporary Workforce - Highways Operatives 2021/23
Authority: BLACKPOOL COUNCIL (Local council)
What is being bought3 lots · detail below
Published requirement descriptionTemporary and flexible workforce
Highways Operatives and concrete slabs
Drainage
Concrete Steps
CPV: Repair, maintenance and associated services related to aircraft, railways, roads and marine equipment · Repair, maintenance and associated services related to roads and other equipment
How this framework works
From the published notice- Bids received
- 3 bids on the busiest of 3 lots · 3 suppliers appointed
Lots and requirements (3)Procurement structure
3 lots · no lot values published · evaluation weights differ by lotLot #1Highways Operatives and concrete slabsAwarded
Highways Operatives and concrete slabs
Lot #2DrainageAwarded
Lot #3Concrete StepsAwarded
Concrete step repairs (tidal)
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Lots publish different evaluation splits; there is no single procedure weighting.
| Lot | Quality | Price | Split |
|---|---|---|---|
| 1 · Highways Operatives and concrete slabs | 50% | 50% | |
| 2 · Drainage | 50% | 50% | |
| 3 · Concrete Steps | 50% | 50% |
- Price carries 50 points on every lot: a 10% discount moves about 5 points.
- “Flexible & Temporary Workforce - Highways Operatives 2021/23” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 8 Feb 2021, 16:02 GMT
- Last source update
- 8 Feb 2021, 16:02 GMT
- Authority reference
DN455134- FTS notice number
2021/S 000-002503- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02912eFind a Tender
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast5 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Highways Operatives & Concrete Slabs
- Signed
- 8 Feb 2021
- Value
- —
- Status
- active
Highways Operatives & Concrete Slabs
- Signed
- 8 Feb 2021
- Value
- —
- Status
- active
Drainage
- Signed
- 8 Feb 2021
- Value
- —
- Status
- active
Drainage
- Signed
- 8 Feb 2021
- Value
- —
- Status
- active
Concrete Steps
- Signed
- 8 Feb 2021
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Highways Operatives and concrete slabs | 3bids · 3 electronic | 3 | — | £1 – £1,000,000 |
| 2 · Drainage | 2bids · 2 electronic | 2 | — | £1 – £1,000,000 |
| 3 · Concrete Steps | 1bids · 1 electronic | 1 | — | £1 – £1,000,000 |
| Whole notice | — | — | — | £1 – £1,000,000 |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High Court JusticeReview body
Framework contractors & participating bidders
3 commercial parties on the notice- Bethell Construction LimitedFramework contractor
- No Dig Drainage Solutions LimitedFramework contractor
- W H TarmacadamFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.