Find a TenderPlanned procurementPreliminary market engagement notice
Published 13 Feb 2026, 14:29 GMT

Official UK procurement notice

FCDO Accra British High Commission Offices Redevelopment, Ghana

Authority: Foreign, Commonwealth and Development Office (Central government)

WorksAbove thresholdSME suitable
Sectors: Construction & Civil Engineering (45) Delivery listed: Ghana (GH)
Planned pipeline value£10,600,000pipeline notice, not a live tender · 1 value update
Tender notice expected 13 Nov 2026from the planned procurement notice
Contract term 3 yrs 6 moends 25 Oct 2030 · starts 10 May 2027

What is being bought

Published requirement description

Project Overview

1.1 The route to market being considered is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage.

1.2 The scope of the project is to redevelop two existing sites, to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance.

1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building.

1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period.

1.5 The existing sites comprises of:

  • An existing split-site office building. It is proposed that the Volta building be retained and refurbished.
  • Existing plant structures to be demolished to make way for new extension.
  • Existing external landscaping to be demolished in some areas to make way for new cloister and walkway.

1.6 Part of the site development design includes:

  • Undertaking minor works to the existing Afadja site to make suitable to be used as a decant property whilst works to the Volta building are undertaken.
  • Refurbish the existing building to a fit-for-purpose, open plan office standard.
  • Replacement of existing mechanical and electrical installations.
  • Seismic strengthening and associated structural works.
  • External works to create shared internal and external spaces.

1.7 The Contractor, as well as any engaged sub-contractors, are required to perform all work in accordance with the relevant UK Standards. The construction must meet established UK standards throughout the build process.

  1. It is anticipated that the works will be undertaken under the NEC form of contract; ECC 4, Option A (Priced Contract with an Activity Schedule).
  2. The project team is also considering the inclusion of an Early Contractor Involvement stage ahead of the construction stage. Both stages will be within the same contract.
  3. Some areas of the building will be classified as higher security and will require a separate specialist contractor. These works will not form part of this requirement/contract. However, the parameter and interface between the higher classified areas and the works within this requirement will require security cleared personnel at Security Check (SC*) level to manage the works. Contractor’s will need to be able to provide such personnel before the works contract can begin.

*SC is a process of security vetting. Further details can be found at www.gov.uk/government/publicati… ↗.

  1. Below is a schedule of key market engagement and tendering activities (subject to change):

Activity Date

Submit PME questionnaire Response 23rd February 2026

1:1 Discussions with Bidders W/C 2nd March 2026

Issue PSQ Early November 2026

Issue ITT Late January 2027

Bidders day During ITT period

Proposed Bid Deadline Late March 2027

Contract Award Mid-May 2027

CPV: Building construction work

The lotProcurement structure

single lot · no lot value published
Lot #1Planned 3 yrs 6 moSME
Contract period: 10 May 2027 – 25 Oct 2030 (3 yrs 6 mo)
Delivery listed: Ghana (GH)Eligibility: SME eligible

Who is likely to bid for this lot ↓

Pipeline intelligence · planning stage: how this market runs before the tender is published

How Foreign, Commonwealth and Development Office buys Building construction work (CPV 4521): the notice lists a non-UK location

No market comparison: the notice lists a non-UK delivery location. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Building construction work (CPV 4521) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
The marketDelivery in Ghana
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 19 of 34 known-size awards · market: not compared
56%—

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Local means the winner is registered in the region where that award was delivered.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: no winner locations published · market: not compared
——

The notice lists delivery in Ghana, so this procedure has no confirmed single UK region; the buyer’s figure reads its other awards, each against its own delivery region.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the bid deadline to the award date, on competitions that published both.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: no decision dates published · market: not compared
——

No decision dates published to compare.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The buyer’s share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: at least 7 of 42 procurements with awards had no recorded rival · market: not compared
17%—

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer138 lots with bid counts · all categories
14% had one bid
The marketNot compared: the notice lists Ghana
Buyer · select a colour for counts
1 bid14%
Buyer: 20 of 138 lots with published bid counts.
2–354%
Buyer: 75 of 138 lots with published bid counts.
4–625%
Buyer: 34 of 138 lots with published bid counts.
7+7%
Buyer: 9 of 138 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

Past prices are a guide, not a bid price.

Last 36 months.

This buyer43 lots with estimate and award · all categories
33% below estimate
The marketNot compared: the notice lists Ghana
Buyer · select a colour for counts
Below estimate33%
Buyer: 14 of 43 lots with an estimate and award.
Within ±2%35%
Buyer: 15 of 43 lots with an estimate and award.
Above estimate33%
Buyer: 14 of 43 lots with an estimate and award.
2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #142 monthsSME suitablePublished estimate£11m

This lot lists only non-UK delivery addresses. Supplier examples below come from UK award history and are not checked for this delivery area.

Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

This lot has only non-UK delivery countries in its published addresses, so the UK model forecast is withheld.

A forecast, not a list of bidders.

—Non-UK location in notice
This lot lists only non-UK delivery addresses. Check the tender documents for the actual site; no UK competition forecast is shown.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Non-UK location in notice
This lot lists only non-UK delivery addresses. Check the tender documents for the actual site; no UK price forecast is shown.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
13 Feb 2026, 14:29 GMT
Last source update
23 Oct 2026, 10:24 BST
FTS notice number
2026/S 000-100288
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Building construction work
Delivery area in notice
Ghana (GH)
Official registry OCID
ocds-h6vhtk-065411 Find a Tender

How it was run

Official notice
Submission deadline
—

Timeline

13 Feb 2026 → 10 May 2027 · 5 dates
  1. Planning notice published254 days ago
    13 Feb 2026, 14:29 GMT
  2. Market engagement115 days ago
    1 Jul 2026, 23:59 BST

    Suppliers are invited to complete the Preliminary Market Engagement Questionnaire, which can be found at forms.office.com/e/kLxPz9bM5R ↗

    Please confirm interest by providing responses to the questions in the questionnaire by 17:00 GMT, 23rd February 2026.

    There may be further market engagement activities such as presentations and meetings. In such case, this notice will be updated.

    Preliminary Market Engagement is not a downselction exercise. Suppliers who do not take part in the PME will not be precluded from completing and submitting a PSQ.

  3. Latest notice published2 days ago
    23 Oct 2026, 10:24 BST
  4. Today
    25 Oct 2026
  5. Tender notice expectedin 20 days
    13 Nov 2026, 23:59 GMT
  6. Contract startsin 197 days
    10 May 2027, 00:00 BST

Notice history

3 events · 2 releases on Find a Tender · since 13 Feb 2026
  1. Preliminary market engagement notice published
    13 Feb 2026, 14:29 GMT
    UK2
  2. Preliminary market engagement notice published
    23 Oct 2026, 10:24 BST
    UK2
  3. Published value updated to £10,600,000
    23 Oct 2026, 10:24 BST
    was £9,300,000
Published amendments (1)

Planned Tender dates from PSQ to Contract Award and the estimated contract value has been updated.

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

Foreign, Commonwealth and Development Office

Contracting authorityPublic authority - central government GB-PPON: PXRR-8771-PHVX King Charles Street, London, London, SW1A 2AHContact name, email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure