Official UK procurement notice
Electrical and Life Safety Maintenance Contract (Brunelcare)
Authority: Brunelcare (Public body)·On behalf of: Q WORKS LTD
What is being bought
Published requirement descriptionBrunelcare wishes to appoint a Supplier for the supply of services and works in respect of electrical and life safety maintenance.
The Supplier shall be responsible for all Planned Maintenance and Reactive Maintenance of electrical and life safety systems located within properties owned, leased, or tenanted by Brunelcare.
A professionally managed service is to be provided for both Planned and Reactive Maintenance activities.
The Supplier shall ensure the availability of qualified on-call personnel to respond to maintenance issues and system failures twenty-four hours a day, seven days a week, throughout the entire calendar year, including public holidays.
Brunelcare is a Bristol-based charity providing high-quality housing, care and support for later living in the South West.
Brunelcare undertook an Open Procedure to select a suitable Supplier to deliver the Electrical and Life Safety Maintenance Contract to commence on 1st April 2026 (five (5) year contract term).
The Supplier will be expected to provide services as per the Specification to any Brunelcare asset as required. As and when assets are obtained or disposed of, the Supplier will be notified.
Within the Pricing Schedule of this tender, the Contracting Authority has stated a number of assets/properties that the Supplier will be expected to deliver services to - if this list of assets/properties needs to be modified throughout the contract term, this will be considered a "materialisation of a known risk".
Please note that Shared Service for Housing (SSfH) is acting as the managing organisation on behalf of Brunelcare for this tender opportunity.
- The authority expects to re-tender this requirement around 14 Jul 2030, 23:59 BST.
CPV: Architectural, construction, engineering and inspection services · Electrical installation work · Repair and maintenance services of electrical building installations
The lotProcurement structure
single lot · value publishedLot #1AwardedPublished value£3,150,000
- Economic & financial standing
Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).
- Technical & professional ability
Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: As per procurement documents (see Schedule 1 and the ProContract Questionnaire).
- Price: As per procurement documents (see Schedule 1, the Pricing Schedule and the ProContract Questionnaire).
- Economic & financial standing
Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).
- Technical & professional ability
Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes · next expected 14 Jul 2030
- First published
- 14 Jul 2025, 12:32 BST
- Last source update
- 3 Feb 2026, 12:21 GMT
- Award evaluation window
- Submission end – 10 Dec 2025
- FTS notice number
2025/S 000-039594- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-055e79Find a Tender- Contract terms summary
Please see Schedule 3, Contract (Terms and Conditions)
- JCT Measured Term Contract 2024 Edition
- JCT MTC 2024 Amendments
- KPIs Electrical
- Brunelcare Standard Terms and Conditions
- Risks
The following risks have been identified that would impact the performance of the Contract, where the impact cannot be known at this stage but may relate to a Contract modification if the risk was to materialise:
- Risk of legislative changes, regulatory changes or changes in law during the term of a Contract
- Risk of unforeseen changes to delivery/operational standards
- Risk of changes in technology, IT solutions or systems
- Risk of unforeseen increase in Contracting Authority budgets/increased volume of works/services
- Risk of unforeseen circumstances that cause the value of the Contract to increase (previous examples include BREXIT, war, pandemic and the cost-of-living crisis)
- Risk of unforeseen political impact
- Risk of decrease/increase in property volume
- Within the Pricing Schedule of this tender, the Contracting Authority has stated a number of assets/properties that the Supplier will be expected to deliver services to - if this list of assets/properties needs to be modified throughout the contract term, this will be considered a "materialisation of a known risk".
How it was run
Official notice- Submission deadline
- 1 Sept 2025, 12:00 BST
- Clarification deadline
- 25 Aug 2025, 17:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
A Tender Response must be submitted via ProContract for the Supplier to be considered for the award of the Contract in the Tendering Procedure.
procontract.due-north.com/Opportunities/Index ↗
Tender Responses and communications submitted by Suppliers via any other means will be excluded.
Suppliers that require any technical assistance in using the portal or have any difficulty registering or logging in, should contact the ProContract helpdesk:
o 0330 005 0352 (9am - 5.30pm Mon - Fri)
o "Submit a Ticket" to the helpdesk (via suppliersupport.proactisservicedesk.com/s/ ↗)
Full details around submitting a compliant tender can be found within Schedule 1 of the associated tender documents.
Timeline
14 Jul 2025 → 1 Apr 2026 · 8 dates- Tender notice published14 Jul 2025, 12:32 BST
- Clarification questions by25 Aug 2025, 17:00 BST
- Submission deadline1 Sept 2025, 12:00 BST
- Award decision expected by320 days ago10 Dec 2025, 23:59 GMT
- Assessment summaries sent315 days ago16 Dec 2025
- Standstill ends301 days ago29 Dec 2025, 23:59 GMT
- Latest notice published265 days ago3 Feb 2026, 12:21 GMT
- Contract starts209 days ago1 Apr 2026, 00:00 BST
Notice history
5 events · 3 releases on Find a Tender · since 14 Jul 2025- Tender notice published14 Jul 2025, 12:32 BSTUK4
- Contract award notice published16 Dec 2025, 14:17 GMTUK6
- Status changed to complete16 Dec 2025, 14:17 GMT
- Contract signature expected9 Jan 2026, 23:59 GMTscheduled
- Contract details notice published3 Feb 2026, 12:21 GMTUK7
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| NRT Building Services group ltdSME1 Apr 2026 – 31 Mar 2031 | £2,927,951 inc. VAT | 27 Nov 2025 | Awarded |
Contracts
Electrical and Life Safety Maintenance Contract (Brunelcare) · NRT Building Services group ltdSME
- Signed
- 26 Jan 2026
- Value
- £2,927,951 inc. VAT
- Period
- 1 Apr 2026 – 31 Mar 2031
- Status
- active
12 agreed KPIs: Percentage of Monthly PPM Tasks Completed · Percentage of Certification · Percentage of Critical Faults Call Outs to Life Safety Systems responded to within agreed response and rectification timeframes …
- Percentage of Monthly PPM Tasks Completed
- Percentage of Certification
- Percentage of Critical Faults Call Outs to Life Safety Systems responded to within agreed response and rectification timeframes
- Percentage of Urgent Faults Call Outs to Life Safety Systems responded to within agreed response and rectification timeframes
- Percentage of Routine Faults Call Outs to Life Safety Systems responded to within agreed response and rectification timeframes
- Percentage of Statutory Compliance Tasks Completed
- Percentage of Call Outs/Reactive Repairs Achieving First Time Fix
- Customer Satisfaction Results with PPM Services
- No Access Refusals against Scheduled Sheltered PPM Tasks
- Health and Safety - Number of Reportable Incidents
- Ration of PPM to Reactive Tasks Percentage of Quoted Remedial Works Identified via PPM Delivered
- Training & Competency Compliance of Engineers
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 4final-stage tenders | 4 | 0 | — |
Contracting authority & participating public bodies
3 public bodies on the noticeOther public bodies
- Q WORKS LTDProcuring entityTechnical consultant and member of the evaluation panel (assessor).
- SHARED SERVICES FOR HOUSING LIMITEDProcess contact pointProcuring entityShared Service for Housing (SSfH) is acting as the managing and contact organisation on behalf of the Contracting Authority for this tender opportunity, carrying out the role as Procurement Consultant
Bidders & participating suppliers
1 commercial party on the notice- NRT BUILDING SERVICES GROUP LIMITEDAwarded supplier
Official documents & specifications (4)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications All documentation can be found within the attachments section of ProContract, with a list of Schedules/Appendices within Schedule 1. https://procontract.due-north.com/Opportunities/Index?p=18d7f93d-94bb-ef11-8132-005056b64545&v=2
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender