Tenderline Synopsis: NATIONAL GRID UK LIMITED: "Electric Vehicle Charging Stations for RIIO-ED2 Project (Hardware)". Published status: active. Published value: Value not published. 1 published lot. Recorded submission deadline: 6 Feb 2023, 17:00 GMT. See the official notice for participation instructions.
| Contracting Authority | NATIONAL GRID UK LIMITED | Scope & Categories | Not published | Submission Window | Closed 6 Feb 2023, 17:00 GMT |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: NATIONAL GRID UK LIMITED
Market Analytics
Derived from OCDS awards & bid statistics
Published history for NATIONAL GRID UK LIMITED. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 0 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNATIONAL GRID UK LIMITED | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published5 Jan 2023, 16:23 GMT | Last source update5 Jan 2023, 16:23 GMT | Recurring procurementNot published |
ClassificationElectric vehicles | ||
Delivery area UK | ||
OCIDocds-h6vhtk-03955c | ||
What is being bought
Please email jpgould@nationalgrid.co.uk for the Pre-Qualification Questionnaire (PQQ) document in order to participate in this tender procurement opportunity:
National Grid Electricity Distribution (NGED) are planning to construct an extensive EV charging network of sites across the 4 DNO regions throughout the RIIO-ED2 regulatory period (2023 - 2028). These charging sites are to be located in Primary Substation Sites (PSS's) greater than 6.6kV up to Bulk Supply Sites (BSP's) up to 132kV.
NGED has finalised the following Project Prioritisation plan for this:
• Tier 1 Sites
- 83 x 100kW DC Rapid chargers @ PSS sites & 11 x 22kW AC Fast chargers @ BSP sites
• Tier 2 Sites
- 33 x 40kW Mobile DC Rapid chargers @ Transport sites & 81 x 22kW AC Fast chargers @ PSS sites
• Tier 3 Sites
- 90 x 7.2kW AC Fast chargers @ Depot sites
Tier 1 sites will be the highest priority of the project and will command the majority of the project budget. These will consist of the install of EV charging units at 94 sites across all four licence areas of NGED, based upon:
- 83 x Rapid / DC charging units - 100kW output, 2 bays per unit, located at key Primary Substation Sites and Bulk Supply Points, with 1 unit per site
- 11 x Fast / AC charging units - 22kW output, 2 bays per unit, located at key Bulk Supply Points, with 1 unit per site
NGED are ambitious in their plans for delivery of the project, and are aiming to have Tier 1 rolled out and completed between April 2023 and April 2024.
What changed
From the official release history
- Status changed to active
5 Jan 2023, 16:23 GMT - Official notice release published
5 Jan 2023, 16:23 GMT - Submission deadline changed to 6 Feb 2023, 17:00 GMT
5 Jan 2023, 16:23 GMT - Buyer information updated
5 Jan 2023, 16:23 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedactivePublished valueNot publishedPlease email jpgould@nationalgrid.co.uk for the Pre-Qualification Questionnaire (PQQ) document in order to participate in this tender procurement opportunity: National Grid Electricity Distribution (NGED) are planning to construct an extensive EV charging network of sites across the 4 DNO regions throughout the RIIO-ED2 regulatory period (2023 - 2028). These charging sites are to be located in Primary Substation Sites (PSS's) greater than 6.6kV up to Bulk Supply Sites (BSP's) up to 132kV. NGED has finalised the following Project Prioritisation plan for this: • Tier 1 Sites - 83 x 100kW DC Rapid chargers @ PSS sites & 11 x 22kW AC Fast chargers @ BSP sites • Tier 2 Sites - 33 x 40kW Mobile DC Rapid chargers @ Transport sites & 81 x 22kW AC Fast chargers @ PSS sites • Tier 3 Sites - 90 x 7.2kW AC Fast chargers @ Depot sites Tier 1 sites will be the highest priority of the project and will command the majority of the project budget. These will consist of the install of EV charging units at 94 sites across all four licence areas of NGED, based upon: - 83 x Rapid / DC charging units - 100kW output, 2 bays per unit, located at key Primary Substation Sites and Bulk Supply Points, with 1 unit per site - 11 x Fast / AC charging units - 22kW output, 2 bays per unit, located at key Bulk Supply Points, with 1 unit per site NGED are ambitious in their plans for delivery of the project, and are aiming to have Tier 1 rolled out and completed between April 2023 and April 2024.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
5 Jan 2023, 16:23 GMT - Submission deadline
6 Feb 2023, 17:00 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
NATIONAL GRID UK LIMITED
Contracting authority GB-COH-02366894Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published